Agency Grant County Public Works
Address.
124 Enterprise Street
Ephrata, WA 98823
E(jlUiy wvU
K19-022
Local Agency Agreement
CFDA No. 20.205
(Catalog or Federal Domestic Assistance)
Project No. R— A f 3 U (0 v5-)
Agreement No. 9533
For OSC WSDOT Use Only
The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code
Highways, (2) the regulations issued pursuant thereto, (3) 2 CFR Part 200, (4) the policies and procedures promulgated by the
Washington State Department of Transportation, and (5) the federal aid project agreement entered into between the State and Federal
Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to
proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount
shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal Highway Administration.
All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency.
Project Description
Name 3 -NE Road Phase I (O -NE to Q -NE) Length 1.88 Miles
Termini 5.03 to 6.91
Description of Work
Work will include earthwork, drainage, HMA surface, traffic control and other items.
Project Agreement End Date December 31, 2021 LN:!>
Claiming Indirect Cost Rate
Proposed Advertisement Date" -1 9" APR 1 L. Z'� l�
[:]Yes
® No
Estimate of Fundin
(2)
(3)
Type of Work�)
Estimated) Total
Estimated Agency
Estimated Federal
Pro'ect Funds
Funds
Funds
PE . A enc
%
b. Other
Federal Aid c. Other
Participation
d. Sta e
Ratio for PE
Total PE Cost Estimatea +c+d
$ 0.00
$ 0.00
$ 0.00
Right of Way° f. A enc
Q.Other
Federal Aid
h. Other
Participation
Ratio for RW i. State
. Total R/W Cost Estimate t +h+;
$ 0.00
$ 0.00
$ 0.00
Construction k. Contract
0
$ 1,001,355,00
$ 135,183.00
$ 866,172.00
86.5 °
1. Other
m. Other
Federal Aid n. Other
Participation
Ratio for CN o. Agency
$ 93,645.00
$ 12,642.00
$ 81,003.00
State
$ 5,000.00
$ 675.00
$ 4,325.00
q. Total CN Cost Estimate +4+rn+n+o
$ 1,100,000.00
$ 148,500.00
$ 951,500.00
r. Total Project Cost Estimate e+
$ 1,100,000.00
$ 148,500.00
$ 951,500.00
Agenc
Washington at
Department of
ranspnrtatinn
By ;// 2
Title Board of County Com issioners
DOT Form 140-039
Revised 0512015
By
Director, Local ograms
Date Executed MAR 0 4 2019