HomeMy WebLinkAbout*Other - Public Works3/26/2021 about:blank
Grant County
Reports for 2020
Digital Submittal Certification
for Forms Due April 1st
The documents checked below are hereby submitted from Grant County for the review and acceptance of the
County Road Administration Board.
2020 RAP Certification of Diversion and Road Fund Expenditures for
Traffic Law Enforcement
I hereby certify that the above report is true and accurate and that I have reviewed and approved the report for submission to the
County Road Administration Board in accordance with wAC 136.
Signe Date:
County Sheriff
Signed
County
Signed
Chair /
Date:
&,JU,,9A
Date:
2020 Certification of Road Fund Expenditures for Fish Passage Barrier
Removal
2020 Annual Certification
I hereby certify that the Fish Passage Removal and Annual Certifications are true and accurate and that I have reviewed and approved
the report for ion to the County Road Administration Board in accordance with wAC lab.
Date: - -�
1
S gned.•
Chair / Executive
Signed: Date: 3l Z 6 2 v z. i
County Engineer
2020 County Ferry System Operations Report
2020 Annual Construction Report
2020 County Arterial Preservation Report
2020 Certification of Road Fund Expenditures for Marine Navigation
and Moorage
2020 Maintenance Management Annual Certification
I hereby certify that the County Ferry System Operations Report, Annual Construction Report, County Arterial Preservation Report,
Marine Navigation and Moorage Certification, and Maintenance Management Certification are true and accurate and that I have
reviewed, approved, and submitted said reports to the County Road Administration Board in accordance with WAC 136.
Signed: /vl Date: 7(2-6/ yz) i �
County Engineer
about:blank 1/1
3/26/2021 aboutVank
Grant County Annual Certification For Calendar Year 2020
WAC 136-04
A. During 2020 the County Engineer performed the duties and had the responsibilities specified in RCW 36.80.030. Yes
Explanation:
B. At any time during 2020 was there a vacancy/change in the position of County Engineer? If so, were the procedures in Yes
WAC 136-12 followed?
Explanation:
The previous County Engineer vacated his position as of February 1, 2020. The Board of County Commissioners notified the County Road
Administration Board on February 3, 2020. Existing staff performed the non -engineering functions of the office, and Adams County provided the
engineering support for professional engineering functions. 11isTemined in place until the current County Engineer was hired,
C. The processing of County Road Accident Reports during 2020 complied with WAC 136-28. Yes
Explanation:
D. Priority Programming techniques were applied to the ranking of all potential projects on the arterial road system in 2020 Yes
per WAC 136-14-020.
Explanation:
E. As of December 31, 2020 the management of the county road department was in accordance with policies set by the county legislative authority
including, but not limited to, the following specific policies required by WAC 136-50-050:
*Has your agency sent the most recently adopted version to CRAB WAC 136-50.0517
POLICY
WAC
Re: Organization
136-50-051
Re: Personnel Practices
136-50-052
Re: Complaint Handling
136-50-053
Re: Work for Others
136-50-054
Re: Utility Accommodation
136-50-055
Re: Priority Programming
136-14-030
Explanation:
120 Maintenance Management Work Plan
F. The following were submitted to CRAB in a
timely mariner.
DOCUMENT
WAC DUE DATE
DATE OF CURRENT VERSION
05/26/2020
04/15/2015
08/17/2010
01/14/1977
10/24/1995
1111612020
DATE OF ADOPTION I
PREPARATION
120 Six -Year Program
136-15-050
31 -DEC -19
11/26/2019
120 Annual Construction Program
136-16-040
31 -DEC -19
11126/2019
120 CAPP Program
136-300-060
31 -DEC -19
12/23/2019
120 Road Fund Budget
31 -DEC -19
12/02/2019
120 Maintenance Management Work Plan
136-11-040
31 -DEC -19
12/25/2019
& Budget
120 Road Levy
136-150-021
01 -FEB -20
01/22/2020
119 Certification of Diversion and Road
136-150-022
01-APR20
04/02/2020
Fund Exp. For Traffic Law
Enforcement
119 Engineer's Certification of Fish
136-150-023
01 -APR -20
04/02/2020
Barrier Removal Costs
119 Certification of Road Fund Exp. for
136-150-025
01 -APR -20
Marine Navigation and Moorage
119 Annual Construction Report
136-16-050
01 -APR -20
04/03/2020
119 CAPP Report
136-300-090
01 -APR -20
04/0212020
119 Maintenance Management
136-11-050
01 -APR -20
04/02/2020
Certification
119 Annual Certification
136-04-030
01 -APR -20
04/02/2020
119 Road Log Update
136-60-030
01 -MAY -20
01/14/2020
120 PMS Certification for CAPA
136-70-070
31 -DEC -20
12/29/2020
Eligibility
Explanation:
We have no marine navigation or moorage.
G. Projects to which construction expenditures were charged were
all on the originally adopted 2020 Annual Program or as
amended per WAC 136-16-042 - Attach Amendments. (If No, please attach a brief explanation.)
Explanation:
H. The County's construction by county rorces limit for 2020 computed
in accordance with
RCW 36.77.065:
DATE SENT TO
CRAB
12/2312019
12/23/2019
12/23/2019
12/25/2019
12/2512019
01/22/2020
04/02/2020
04/02/2020
04/0312020
04/02/2020
04/02/2020
04/02/2020
01114/2020
12/29/2020
Yes
SI,307j392.50
I. The actual expenditure for construction by county fomentQoTted in the 2020 Annual Const. Report: $117,464.00
J. As required by WAC 136-20-0,60--a-vtitte-6,064 'Wid Inspect/ n Rcport for 2020 was furnished to the legislative
07/01/2020
authority on (attach a copy):
# of NBI Bridges as of December 31, 2020: 195
aboutblank III
3/2612021
aboutblank
Grant County 2020
CERTIFICATION OF DIVERSION AND ROAD FUND EXPENDITURES FOR TRAFFIC LAW
ENFORCEMENT
WAC 136-150-022
11MI*
Tatal Bad Laxt
Budgeted Road Levy revenue (as listed on the Road Levy Certification - WAC 136-150-021)" $93,9002000.00
Actual Road Levy revenue produced: $9,9071,289.58
Road Un, DiygAr
Budgeted Road . Levy Diversion (as listed on the Road Levy Certification - WAC 136-150-021): $0.00
Actual amount of Diverted Road Levy:
$0.00
Was Diverted Road Levy deposited in a specific and identifiable account (RCW 36.82,040): N/A
ae*
JMfffip. Law cment Paid -by. Road -Fund- Ruditurest
Budgeted cost reimbursements and/or operating transfers from the Road Fund: $27000-00
Actual total amount of cost reimbursements and/or operating transfers from the Road Fund: Q`■
$278,463.18
Tqtgj1.&ad---Partion TArfric Law Enfpj. - mcna-laE -Agnditurnot $278,463.18
Total Traft.1 Enf
gr&ejant. paussIALL-C! UN $5001478.52
RCW 36.79.140 provides that only those counties that during the preceding twelve months have spent all
revenues collected for road purposes only for such purposes, 'Including traffic law enforcement, as are allowed
by Article 11, Section 40 of the Washington State Constitution, are eligible to receive funds from the Rural
Arterial Trust Account.
0 cal. moly.
Jhjs.fgrm must he rgyjewed.gnd cCrtifled ( AAhg..�&g l
* County Sheriff
* County Auditor OR Charter designated Chief Financial Officer
a Chair, Board of County Commissioners OR County Executive
abotitblank 111,
3ra/2021
aboutbkank
ANNUAL CERTIFICATION - STANDARD OF GOOD PRACTICE
AIAINTENANCE ALANAGEMIEIST WAC 136-11
The following information is provided for the annual review of county compliance with the requirements of WAC 136-11-040. The information
provided herein is current as of December 31, 2020, and summarizes Maintenance Management activities for Calendar Year 2020.
Yes
In accordance with WAS 13.6-11-040 . maintenance management procedures have been used by this county to guide cost-effective maintenance and
preservation activities on county roads mi the previous calendar year.
Grant Coun:Ws maintcnancc management practices meet the following requirements, in accordance with WAC 136-11-M:
(1) An inventory of significant maintainable road features (physical assets) has been prepared and/or updated.
M-
Yes
(2) Activity Guidelines have been prepared, reviewed and/or updated for all si cant maintenance activities.
Yes
(3) A work program and budget has been prepared for maintenance activities planned in the year. This work program and budget is based upon the
road features to be maintained, the types and amounts of maintenance work planned and the costs for the labor, equipment and materials needed to
complete the work.
Yes
(4) Labor, equipment and material resource requirements needed to accomplish the planned workload are identified.
Yes
(5) Work scheduling procedures are identified, documented, and utilized in carrying out the maintenance work program. Yes
(6) Reports showing work accomplishment and cost have been prepared and reviewed by managers and supervisors.
aboutblank
3/26M21
aboutblank
FISH PASSAGE CERTIFICATION
WAC 136-150-023
Submitting County: Grant Budget Year: 2020
Fish -Pa e farrier Remo
9 mer -yal Projects.
Project Name Total P 'ect Cost Cost Outside of ROW % of Total Cost (25% AHowed by WAQ
r0i
;total Exnenditures-for Fish Passae-13a * R I gh
rner em#
--_val QMts"de Cou
Total Annual Road Construction Budget: $0.00
X IQU
112% of Total Annual Road (Limit of "Outside of Right -of -Way" expense) =$0.00
Total Expenditure for Fish Passage Barrier Removal Outside County Right -of -Way $0.00
RCW 36.79.140 provides that only those counties that during the preceding twelve months have spent all revenues collected for road purposes only
for such purposes, including removal of barriers to fish passage and accompanying strembed and stream bank repair as specified and limited by
IAC W 36.82.070, as are allowed by Article H, Section 40 of the Washington State Constitution, are eligible to receive funds from the Rural Arterial
Trust Account.
aboutblank VI
-W-22612021
Centerd" !.are FFC
man Miles
TRC
SS
Combined Various, 09 Non 3 - Scats, all MKS
44.75
89.12 09 - Runt lAcal Ace=
aboWNank
S339,42.9
Combined Various 09 Non 4 - fixation ft seats and aved"s (crack scaling, digouts, patching, prelevel)
44.75
89.12 09 - Rurd Local Access
Non Thick Route
(2)
(3)
(4)
(5)
(6)
(7)
(9)
7-06
14.12 09 - Rund UK:al Access
(12) (13)
$0,596
(14)
rTmm
0.00 09 - Ruml lAcal Access T3 - 30G.000 to 4,000,000
$0
Combined Various 09 T-3 4 -Preparation for seals and overlays (crack scaling, digows, patching, pietevel)
000
0 00 09 - Rwal LAW Access T3 - 300,00 to 4,000,000
So
CIL IANZE GOA'HTTyp
of Work
(1) (w) OV)(V)
NO.
1�mjectfflzxd Name
Road #
BMF
EMP
# Lanes
Frwn
To
FFC
TRC
MELESMILES ODS
Work CAPA &
MVA Ss Other $s % by
MILES
Code TPA Ss -
Cont
14
E -SE
20790
4,12
7.41
2
12 -SE
SR262
08
T5
3.29 6.59 3.29
3 527,448
4 52.3,885
15
Frenchman Hills Rd
91035
20.70
25.44
2
Dodson Rd
SR 212
07
T4
434 9.48 4.74
3 519,925
4
$20,639
534,412
16
H -SE
92005
0.00
4.67
2
12 -SE
SR 262
07
T4
4.67 9.34 4.67
3
4
$38,962
$33,904
17
1st Ave *Royal Camp*
2GS60
0.00
0.31
2
12 -SE
Royal Camp
Rd
08
99
0.31 0.62 0.00
3
4
$2,586
52,251
20620
0.00
0.32
2
Christensen
Royal Camp
08
99
3
$2,670
is
2nd Ave *Royal Camps
*Royal Camp*
Rd *Royal
0.32 0.64 0.00
4
$2,323
C lam*
19
Linden St
20600
0.00
0.15
2
1 st Ave *Royal
Camp*
2nd Ave
*Royal Camp
OR
99
0.15 0.30 0.00
3
4
$1,251
$1,089
20530
0.00
0.55
2
SR 262
0.25 ani N of
Ga
99
3
54,589
20
Royal Camp Rd
2nd Ave *royal
0.55 1110 0.00
4
53,993
C
,amp*
67-96 135.92 SI A6
$911,729.05
$148,669.00 SO.00
Non -CAPD Eliffible ActWes
Descripflon WarkCadc
Centerd" !.are FFC
man Miles
TRC
SS
Combined Various, 09 Non 3 - Scats, all MKS
44.75
89.12 09 - Runt lAcal Ace=
Non Truck Route
S339,42.9
Combined Various 09 Non 4 - fixation ft seats and aved"s (crack scaling, digouts, patching, prelevel)
44.75
89.12 09 - Rurd Local Access
Non Thick Route
5295,350
Combined Various 09 T-3 3 - Scals, alt tn=
U6
14.12 09 - Rural L=al Access
TS - 20,000 in 60 days
$53,550
Combined Varkm 09 T -S 4 - Preparadon for seals and overlays (crack sealing, diger, patching, pfelevel)
7-06
14.12 09 - Rund UK:al Access
TS - 20,000 in 60 days
$0,596
Combined Various 09 T-3 3 - S=L% au qM
UG
0.00 09 - Ruml lAcal Access T3 - 30G.000 to 4,000,000
$0
Combined Various 09 T-3 4 -Preparation for seals and overlays (crack scaling, digows, patching, pietevel)
000
0 00 09 - Rwal LAW Access T3 - 300,00 to 4,000,000
So
aboutblank Z7
312612021
aboutblank
Grant County
2020
County Arterial Preservation Accomplishment Report
WAC 136-300-090
CAPA CARRIED OVER FROM 2019:
$0.00
CAPA RECEIVED IN 2020:
$9113,729.05
CAPA SPENT 12 020.
$9113,729.05
CAPA BALANCE CARRIED 114TO 2021:
$0.00
CAPP Eligible Activities
(1)
(2)
(3)
(4)
(S)
(6)
(7)
(8)
(9)
rrEM
ProjnVRoad Name
Road #
BMP
Emp.
# Lain
From
To
FFC
NO.
WULES
Code
TPA Ss
NIVA $s Contract
99
8.17
16J4
0,00
3
4
95000
0.32
8.49
2
L&NE (COU L-0
PI -NE
09
I
36 -NE
T4
5.02
10.04
SA2
City Limits)
541,882
536,445
TS
2.27
95023
10.12
M55
2
31 -NE
Arch Smet
07
2
Pinto Ridge Rd
3
4
S6,424
$5,590
99
100
(COULM city)
3
4
S58,401
S50xo
95037
16.05
21.07
2
36 -NE
SR -2
07
3
R -NE
IM,
196
1.99
3
4
S16,519
514,375
T3
3.06
6.12
95037
21.82
24-09
2
Hardine Town
44-1 E
07
4
WNE
S25,963
$22,506
T3
2.96
Limits
196
3
4
$24,695
$21,490
94010
1.00
1.77
2
O -NE
P -NE
09
5
6 -NE
M22
531
3
4
$42,633
S37,099
Inte"ection
45200
1-00
8.00
2
W -NE
NNE
08
6
9 -NE
45700
0.00
1.00
2
AdamsfLincofn
W -NE
09
7
12 -NE
County Lm -es
44750
3.13
5.11
2
Inigedon
8 -NE
08
8
N -NE
canal
41050
0,00
3.06
2
3 -NE
O-NF16-NE
08
9
0 -NE
Intersection
45250
10.00
3.10
2
6 -NE
9 -NE
09
16
P -NE
92035
12-84
15.90
2
North Frontage
3 -NE
07
It
U -NE
Rd
95035
0.00
9.06
2
3 N
12 -NE
07
12
W -NE
20670
0.60
5.11
2
12 -SE
SR 26
08
13
D -SE
WA CARPJED OVER FROM 2019:
$0.00
MVA RECEIVED IN 2020:
$1552572.01
WA SPENT IN 2020:
$148,669. 00
MVA BALANCE CARRIED INTO 2021:
$6.1903.01
(10)
(11)
(121
(13)
(14)
CJL
FREIGHT
LAK&
(1)
Type of Work
(04 (IV) (Y)
TRC
MILESIMILES GOODS
Work
CAPA &
Other Ss % by
WULES
Code
TPA Ss
NIVA $s Contract
99
8.17
16J4
0,00
3
4
$68,162
S59,314
TS
4.43
8,86
4.43
3
4
$36,959
$32,162
T4
5.02
10.04
SA2
3
4
541,882
536,445
TS
2.27
4-54
2.27
3
4
S18,939
S16,490
T4
0.77
1.54
0.7171
3
4
S6,424
$5,590
99
100
14.00
3
4
S58,401
S50xo
T4
1-00
2-00
1.00
3
4
S8,343
$7,260
T5
IM,
196
1.99
3
4
S16,519
514,375
T3
3.06
6.12
3.06
3
x,2164
T5
3.10
620
3,10
3
4
S25,963
$22,506
T3
2.96
5.92
196
3
4
$24,695
$21,490
T3
9A6
19.12
9706
3
4
$75,589
$65,776
T4
5.11
M22
531
3
4
$42,633
S37,099
abouttlank 112
3126r2021
aboutblank
0)
m
0)
M
m as) (11) azi
cm 04) (M (16)
W)
its)
C"MY Sallaft of FosdS
Zvdumed Expaww"
omilm
A&MW
ft'vU*
C".
No.
F"I*d
Sftft
huffONDW
no" Sft=Cw latisfaidea
P"do mm"T4904 W"
no
"C
comoded
LnTvWML)
YVWJWT�"
Code
Cn*vy Paw flaftes
PWJ*d Ilmleft coolsty O*Vrr"a
rrcacr ft�lar CWAft*CdM
cra"Tow
14440 AIA4
clumnst
Cunn U"d A=mat
"Y C.Wnd cwmq
(Ag "s)
Foods
Form
No woes.
wndmr,
MA
awn
7.M
4= Yhm Ub Vbb Ddw
em
1 16
09
1.16
06a
$0
CRP
bK=n4
Tm D.3-NE
umnba
W=
abu"W
Nowak
.40
R*W K"m 12-M row
ars &04
ad rm
WA
Costs
bW41ad
12-WERna
M30 FOOL, *?M X
TM Emeld cramp SISS
U4
9.01
u
0.77
ce
mol a
IM
V&"XamcQ.7-NW
3MO Ynm; Bcfm TamW
It iiV
036
No Vat
7W ew TD=W
Wu done,
Ne CL7-$W&&?iW4f4l4W
RaW Pismax 5.6-WW
=dm
WA
com
iia
in" TmW 04M Tamid
To: To: &d TOMW
&11
09
2-17
Deer
so
c"
M"dK�ll-KW
Wn
3me ft*Wbgift 7WvLW
0.11
1.11
09
ammind
SUX774 SIMOX7
SMUff 50 $1,019,473 S117,4"
SIX081
aboutblank 212