Loading...
HomeMy WebLinkAboutAgreements/Contracts - Public WorksPara etrix ENGINEERING. PLANNING. ENVI ONMEN iAL SCIENCES CY�7�7T��73�i�1�77:1 Grant County Amendment Eight Change No. 7 Ephrata Landfill RI/FS Engineering Services WELL INSTALLATION, TESTING, AND SURVEY; GROUNDWATER SAMPLING AND TESTING; HYDRAULIC TESTING; MULTI -PHASE EXTRACTION PILOT TESTING; AND FEASIBILITY STUDY COMPLETION Parametrix provides engineering services in support of the Ephrata Landfill Remedial Investigation and Feasibility Study (RI/FS) under the Consulting Services Agreement among Grant County, Nossaman LLP, and Parametrix (3/28/2006; amended 10/11/2013, 01/19/2016, and 04/03/2018). This Change No. 7 to Amendment Eight adds scope and budget and extends the schedule, as summarized in the attached Scope of Work and Budget Summary (Exhibit A). Amendment Eight is extended through June 30, 2023. The Amendment Eight budget of $1,464,887, as previously amended, is increased by $179,966. The new Amendment Eight budget is $1,644,853. Approved for CLIENT Title Rob Jones, Chair Date aeaaiaoa3 Grant County Amendment Eight Change No. 7 Ephrata Landfill RI/FS Engineering Services Accepted for PARAMETRIX, INC. By Title EP&C Division Manager Date: February 21, 2023 all EB'-'1-8�1_2023 �ppJfyy�E}Y� 4'7 Gp +�[. 61 �s' q f W rm 0 O t7 q GI ci f4 FC !M tII i0 4 ; tV� r� fly. �•7f•, ;t..'ar�� '3) se t i� 1 � . 553-1860=013 February 2023 Para etrix ENGINEERING. PLANNING.s ONMENTAL SCIENCES .// /, i•. �/i, -/ � .i . / / . i moi. / � / / /i / / .� i -.� ���i.����/ .�- //moi//.:.i�r�/i //.i/ � // :.ice• �/%� /%- � i Grant County Exhibit A: Amendment Eight Change No. 7 Ephrata Landfill RI/FS Engineering Services WELL INSTALLATION, TESTING, AND SURVEY; GROUNDWATER SAMPLING AND TESTING; HYDRAULIC TESTING; MULTI -PHASE EXTRACTION PILOT TESTING; AND FEASIBILITY STUDY COMPLETION This Change No. 7 to Amendment Eight adds scope and budget for completion of the Feasibility Study (FS) comment response, extends the schedule through June 2023, and adds budget. INTRODUCTION Amendment Eight took effect on August 31, 2019, to provide engineering services and support for additional remedial investigation (RI; Phase 1) and develop the workplan for additional pilot testing of remedial alternatives (Phase 2 Workplan). Scope and budget have been added and the schedule extended through six prior changes: • Change No. 1 added to the scope, added $387,970 to the budget, extended the schedule through May 28, 2021, and temporarily reduced Parametrix's labor multiplier. • Change No. 2 extended services, added $75,000 to the budget, and extended the schedule through July 30, 2021. • Change No. 3 extended services, added $85,000 to the budget, and extended the schedule through December 31, 2021, including two minor schedule extensions. • Change No. 4 extended services, added $80,000 to the budget, and extended the schedule through April 30, 2022, including one minor schedule extension. • Change No. 5 extended services, added $80,000 to the budget, and extended the schedule through September 30, 2022, including one minor schedule extension. • Change No. 6 activated J004 Feasibility Study Part 1, added $159,823 to the budget, and extended the schedule through January 31, 2023, including one minor schedule extension. Change No. 7 is needed to cover additional scope and costs to expand the response to Ecology's comments and new requests regarding the RI/FS Completion Letter. This Change No. 7 is effective February 1, 2023. Change No. 7 excludes services for resolution of the City's disputes against the County, which, if needed, will be provided under a separate agreement. Tasks and subtasks are affected by this change as follows: J003 Assessments and Remedial Investigation (Complete, no changes) J004 Feasibility Study Part 1(Complete, no changes) 1004 Feasibility Study Part 2 (Active) 03.01 RI/FS Completion Letter (Schedule extension, scope, and budget addition) Grant County 553-1860-013 Exhibit A: Amendment Eight Change No. 7 1 February 2023 Ephrata Landfill RI/FS Engineering Services SCOPE OF WORK (continued) 03.02 Task Management and Administration (Schedule extension, scope, and budget addition) JOO@Grant and Project Administration (Active) 04.01 Grant and Project Administration through June 2023 (Schedule extension, scope, and budget addition) 04.02 Grant -ineligible Effort (Schedule extension, scope, and budget addition) |naddition tothe specific changes above, pansmetrixwill extend the temporarily reduced labor multiplier (reduced as part of Change No. 1) through June 30, 2023, or the expiration date of any subsequent minor SCOPE BY TASK Task 1:J0O3 Assessments and Remedial Investigations (Cornplete'no changes) Task 2J0U4 Feasibility Study Part 1 no changes) Task 3 J00 Feasibility Study Part 2 This task extends Ecology comment response on the RI/FS Completion Letter through June 2023. Subtaoh3.1 RI/FS Completion Letter (Schedule extension, scope, and budget addition) This task is extended through June 2023 to cover resolution of unforeseen Ecology comments and requests for additional information in the R|/F5Comp|etion Letter. Assumptions Remote meetings, electronic deliverables only SUbtask3.2 Task Management and Administration (Schedule extension, scope, and budget addition) Task management and administration, including progress and budget tracking, progress reporting, review oflabor and expense charges, and invoicing, isextended through June ZO23. Task 4 J008 Grant and Project Administration SUbtaSh4.1 Grant and Project AdDliDi8traUOD(SchedU|e extension, scope, and budget addition) Grant and project administration isextended through June 2O23. Subtask 4.2 Grant -ineligible Effort (Schedule extension, scope, and budget addition) The task schedule is extended through June 2023, and budget is added for Parametrix's dispute resolution services under the Agreed Order. Grant County 553-1860o1 Exhibit A: Amendment Eight Change No. r 2 February 2023 SCOPE OF WORK (continued) Budget Addition Summary by Task and Subtask Addition 1. J003 Assessments and Remedial Investigations (Complete) $0 2. J004 Feasibility Study Part 1(Complete) $0 3. J004 Feasibility Study Part 2 3.1 RI/FS Completion Letter $151,546 3.2 Task Management and Administration $9,986 4. J008 Grant and Project Administration 4.1 Grant and Project Administration $8,464 4.2 Grant -Ineligible Effort $9,969 Total Change No. 7 Budget Addition $179,966 Amendment Eight Budget, as Amended by Change Nos. 1 through 6 $1,464,887 New Amendment Eight Budget $1,644,853 Grant County 553-1860-013 Exhibit A: Amendment Eight Change No. 7 3 February 2023 Ephrata Landfill RI/FS Engineering Services Parametrix ENGINEERING. PLANNING. ENVIRONMENTAL SCIENCES - . .i.'.�...,: ice .-/- , // � r +.% / - /•:.. , . /.:-.- moi.- ..✓-. < -% �/ /. / / /. i i i -/ / - Amendment Eight Change No. 7 Ephrata Landfill RI/FS Engineering Services Budget Detail Ui z U - w o rOa + v_ c Z L p CQ LA i -V1 C I— ru ra m N p O H 4'tA N to > C O N Ln CL v1 O LnO 7 0 O O 4+ V i O O u O d � +' N y O 4-J Q V V a O C N O N N O U O L ) U •� V) = N Bill Rates: $192.221 $221.171 $154.401 $282.131 $120.611 $339.20 $171.03 $158.13 $135.74 Task SubTask Description Labor Dollars Labor Hours 03 J004 Feasibility Study Part 2 $161,532.68 729 112 198 163 233 2 10 2 !;1 4 03 01 J004 FS Completion $151,546.27 690 112 198 163 204 8 5 03 02 J004 Task Mgmnt and Admin $9,986.41 39 29 2 2 2 4 04 J008 Grant and Project Administration $18,432.90 70 10 10 40 10 04 01 Grant & Project Administration $8,463.90 30 30 04 02 Grant -Ineligible Effort $9,969.00 40 10 10 10 10 Labor Totals: Totals: $179,965.58 $179,965.58 799 112 $21,528.64 208 $46,003.36 173 $26,711.20 273 $77,021.49 2 201 2 5 4 $241.22 $6,784.001 $342.06 $790.65 $542.96 .......... ....... ...--- ............. ................................--------- __.... _ Subconsultants Subconsultants Total: ...................................... Other Direct Expenses Other Direct Expenses Total: Project Total _....___............... ............................--........_.......___---;............._......................................._...._. ....------ ........................................ ................................ ............................................... ......................_, ' _............................................................: ..........................:. ----------------------------- $0.00 ................................ _....__............. $0.00 $179,965.58' .._................._.......,........................._..:_..................._...................................:............_.... ----------------- .........---- _..... _ _.. _ ....... .............-- ..-------- ........ ............. . ................ ... _... . .......... __.._.... ....._............_...._..........;......................:._....................:..................... Grant County 553-1860-013 Exhibit A: Amendment Eight Change No. 7 4 February 2023 Ephrata Landfill RI/FS Engineering Services