Loading...
HomeMy WebLinkAboutResolution 23-006-CCBOARD OF COUNTY COMMISSIONERS Grant County, Washington RESOLUTION IN THE MATTER OF RESOLUTION No. 23 -()CU -CC AMENDING RESOLUTION 22 -120 -CC AND 22 -131 -CC ADOPTING THE SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR 2023- 2028 WHEREAS, a priority array of projects was prepared in accordance with the County Road Administration Board Standards of good Practice: WAC 136-14 and was made available and consulted by the Board during the preparation of the Six Year Program; and, WHEREAS, pursuant to the requirements of R. C.W. 3 6.81.121 and WAC 136-14, the Grant County Road Engineer submitted the Six Year Transportation Improvement Program for 2023 through 2028 to the Board of County Commissioners on October 11, 2022; and WHEREAS, a report with respect to deficient Bridges was available to the Board during the preparation and discussion of the Six Year Program;_and WHEREAS, a SEPA application was submitted for environmental pre -assessment and a letter of Addendum was received from Grant County Development Services indicating that the social, economic and aesthetic values would not be disturbed, and WHEREAS, A Notice of Public Hearing was published twice for 2 weeks preceding the Hearing, with no objections to the process and, said hearing was held on November 22, 2022,_and WHEREAS, the Board of County Commissioners has reviewed the recommended program for 2023-2028 and has made the revisions and changes deemed practicable to the County's long range road program; and WHEREAS pursuant to the requirements of R.C.W. 3 6.81.121 the legislative authority shall adopt a Six Year Transportation Improvement Program updated yearly, the Board of County Commissioners did prepare, revise, and extend the Six Year Program and did hold a Public Hearing on November 22, 2022, Adopting said program as resolution 22 -120 -CC. Said Resolution was amended for wording via Resolution 22 -131 -CC. C:\Users\rlmina\Downloads\ATTACH B - 6YEAR TIP 2023-2028 AMENDED RE S OLUTION. do cx NOW, THEREFORE, BE IT HEREBY RESOLVED THAT the Grant County Board of Commissioners, AMEND the Resolutions 22 -120 -CC and 22 -131 -CC to include several projects., adopting the 2023-2028 Six Year Transportation Improvement Program for the years 2023 through 2028. DATED this day of 2023. ATTEST: C:\Users\rlmina\Downloads\ATTACH B - 6YEAR TIP 2023-2028 AMENDED RE S OLUTION. do cx BOARD OF COUNTY COMMISSIONERS Yea Nay Abstain GRANT COUNTY, WASHINGTON Rob Jones, Chair dy Cartier, Vice -Chair DannyV.Stone, Member C:\Users\rlmina\Downloads\ATTACH B - 6YEAR TIP 2023-2028 AMENDED RE S OLUTION. do cx ;Ile Grant County ayFe�; Department of Public W Y _«� 124 Enterprise St. S.E. Ephrata, WA 98823 7 F 7-77" 77 Memo To: Honorable Grant County Board of County Commissioners tal0-2 5 Serial No. 22.005 From: Dave Bren, PE, MSCE County Road Engineer Date: January 10, 2023 Re: Amending the 6 -Year Transportation Improvement Plan (TIP) Adding (4) Projects to the Plan: (2) CBDL Bridges, 2023 Gravel -to -Oil Program, and the Hiawatha/Drumheller Truck Route Legislative History: Financial Impact: • First Presentation: January 10, 2023 • 2023 Truck Route Design Work REET $ 250 000 • Second Presentation: t• 2023 Gravel -to -Oil Program (REET) $ 400,000 • 2024 CBDL Bridge #247 (DIR FED) $4,430,000 • 2025 CBDL Bridge #248 (DIR FED) $5,0055000 • Action Requested: =TIP Amendment TTP PrniPct A �1; ; r T�+a� ` , n 4 nnn I 2023 Hiawatha/Drumheller Truck Route Design (REET $250,000): The REET funding provides for the Desi gn of the Truck Route including; LIDAR UAS/Drone survey, LIDAR UAS/Drone equipment, GPS ground control equipment, road design, and cultural report for a new truck route on the West Side of Moses Lake. A shovel ready design will lead to funding opportunities for the construction. The future Truck Route will connect the Hiawatha interchange at I-90 to a new roundabout at the SRI 7/S282 split with a new 7.3 -mile section of BSTp aved road. 2023 Gravel -to -Oil Program (BEET $400,000): The REET funding will provide for new BST road surface construction on (2) top scoring sections of gravel roads; 12 -NE (0.77 Miles) and 8 -NE (0.80 Miles). In addition the REET funding will provide for a rescoring update of gravel roads to provide for potential continuance of the Gravel -to -Oil Program in 2024, and beyond. V/ 2024 CBDL Bridge #247 Replacement (FED DIRECTED $4,430,000): The Federally Directed funding will provide a new bridge over the Irrigation Canal on Road W, South of Road 2SE. Design would begin in 2024 with construction conducted in 2025. The larger bridge would remove the canal obstruction, so that the canal capacity could be greatly increased. 2025 CBDL Bridge #248 Replacement FED DIRECTED $5,005,000): The Federally Directed fundi ng well provide a new bridge over the Irrigation Canal on Road 11 SE, West of Road U. Design would begin in 2025 with construction conducted in 2026. The larger bridge would remove the canal obstruction, so that the canal capacity could be greatly increased. To meet current and future creeds, serving together with public and private entities, while fostering a respectful and successful work environment." information, ................................... ............ (5 9) 754.6082 Dave Brea, PE, +aunty Road Engineer..Y 3502 Ed LOW11y, SUpervi r -Dish No FAX ............................ ......... ....................... (50 )x'54-6087 Bob sersan ti, construction Engineer... _.._.......Ext 35.03 Mike DeTrolio, Supervisor -Dist. No. 2__..Y...._......x.E .3'59 . E4nal............................ pUbficWorks@grantcountyw ,gov Loc Ohi, Accoun tart Lead ...................... ...a.. ... ....... Ext. 3555 John Baia ey, u,peN r° -Dist No. .............. . . 3. ............. ............. Et3541 ryaF Castro, Public WorksDirector_...Ut. M504 Rod Follett, Foran-sign SbopY••........................PExt. 3 5 7 yo[yM�sf Supervisor -Central shop F.MYY.iIb.b!Ms) 75.4-$086 6 Samuel Dart, Assistant Director ....................... Ext. 35 is Jason tolling, solid Waste .........................{5 ) 75 Sig Andy Booth, Bridge Supervisor ..Y.................... ............. Ext 3535 Fiscal and Policy Implications: The Congressionally Directed Federal funds and REET fundsprovide for these projects do not require matching funds. These funds provide a $10,085,000 direct economic benefit to the County during construction of the roads and bridges. In addition, these fundsprovide long- term economic benefits to the County, by increased road capacity for developable lands, increased truck route capacity, and increased irrigation capacity for farming. Commission Packet Attachment A. Updated 6 -Year TIP Map and Proj ects List B. Resolution to Amend 6 -Year TIP I C. I Engineers Estimates for CBDL Bridge #247 and #248 Action Requested Public Works Staff requests a resolution for approval of an Amended 6 -Year TIP. This will add (4) projects to the TIP as follows: v,,' 2023 Hiawatha/Drumheller Truck Route Design V' 2023 Gravel -to -Oil Program (Roads 12 -NE and 8 -NE) ✓ 2024 CBDL Bridge #247 Replacement ✓ 2025 CBDL Bridge #248 Replacement "'To as current and future needs. serving to EENNENMM� gether with public and private entities. while fostering a respectful and successful work environment." information.................................................(5+ ) 754-6082, Dave eren, PE, county Road, Engineer............... . . Ext. 35o,2 Ed, LoNvry, Supervisor -Dist. no. FAX ............................................................... �509) 754-6087 Bob Ba an 0, Construction Engineer... 3503 Mike DeTrolio, Supervisor -gist. No. 2... 3591 E -Mail ... ................ ... ...... . pub ficWorks@grantcountywa.gov Loc Bbl, Accoun ta nt Lead .................. ................... Ext. 3555 John Brissey, Supervisor -Dist No. 3 ......... ................. Ext 3541 Sam Castro, Public Works Director ................... EXt. 3504 Rod. Follett, Forem an -s ign Shop ............................ Ext. 3579 John Spiess t supervisor -central 754-6.086 Samuel Dart, Assistant Director.........................Ext. 3519 Jason Collings, Solid Waste .................. . ...... (509) 75 3i Andy Booth, Bridge Supervisor ................................... Ext 3535 AML Washington State Department t Transportation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2023 STP(US) 808,022 0 126,107 934,129 S rn 0 19,693 145,871 Totals 934,200 0 145,800 110807000 c A. PIN/Project No. B. STIP ID D o C a Z c C. Project Title D. Road Name or Number D Q n. s CD n_ a E. Begin S: End Termini CD '� 'a B o rt oCD r CA cn "' F. Project Description G. Structure ID ca a rt o M 03 CL P T W M 1.020 CE CL Yes 05 1 WA -02546 11/15/21 11115/21 21 -117 -CC COCHRAN RD & OTTMAR RD 41550/41660 0/0 to .89/.13 Reconstruction - Work will include grade, drainage, HMA surfacing, Curb & Gutter, sidewalks, traffic control and other items. PE done under federal project STPUS-6079(001) Location: Airway DR to Valley Rd Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2023 STP(US) 808,022 0 126,107 934,129 S CN 2023 HIP(US) 126,178 0 19,693 145,871 Totals 934,200 0 145,800 110807000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,080,000 0 0 0 0 Totals 1,080,000 0 0 0 0 Report Date: January 10, 2023 Page 1 ANIL Washington state Department of TMnsportafion Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2023 0 0 115,150 115,150 Totals 0 0 115,150 115,150 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 115,150 0 0 0 0 Totals 115050 p p 0 0 Report Date: January 10, 2023 Page 2 o' o -n A. PIN/Project No. B. STIP ID D N C M Z C. Project Title B rt c D. Road Name or Number = CD a CL E. Begin & End Termini M j c CA '?' F. Project Description G. Structure ID Q rt o 21 -117 -CC � 21 y T 05 2 WA -12565 11/15/21 11/15121 Safety- SR 28 and White Trail Road Roundabout U NW 22.85 to 22.91 Safety- SR 28 and White Trail Road Roundabout 93010 Intersection- Work will include earthwork, drainage, HMA surface, traffic control and other items Location: U NW & SR28 Intersection Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2023 0 0 115,150 115,150 Totals 0 0 115,150 115,150 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 115,150 0 0 0 0 Totals 115050 p p 0 0 Report Date: January 10, 2023 Page 2 Adak WaAington. State Department of zporta o Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code S PE 2023 S CN 2023 Totals rn I 0 c --I 0 0 I 0 A. PIN/Project No. B. STIP ID X n D o c� o CL C. Project Title 0 :4 a P T Z D. Road Name or Number = D Q. M ,0 E. Begin & End Termini -0 3 j U) 2 F. Project Description G. Structure ID ca n, rt 0 00 3 WA -13302 11/15/21 11/15/21 21 -117 -CC 05 ADA Ramp/ Sidewalk upgrades Phase 1 Various to Various Work Consists of ADA Ramp and/or Sidewalk upgrades and other items Location: (Various) Funding Status Phase Phase Start Year (YYYY) Federal Fund Code S PE 2023 S CN 2023 Totals Federal Funds State Fund Code State Funds Local Funds Total Funds 0 0 30,000 30,000 0 0 120,000 120,000 0 0 150,000 150,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 30,000 0 0 0 0 CN 120,000 0 0 0 0 Totals 150,000 0 0 0 0 Report Date: January 10, 2023 Page 3 rn I 0 c --I 0 X 0 tD 0 X n rCD c� o CL 0 a P T ICE I No Federal Funds State Fund Code State Funds Local Funds Total Funds 0 0 30,000 30,000 0 0 120,000 120,000 0 0 150,000 150,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 30,000 0 0 0 0 CN 120,000 0 0 0 0 Totals 150,000 0 0 0 0 Report Date: January 10, 2023 Page 3 4666 r,mm Washington State Department of 'Transportation, Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code S CN 2023 STP(US) Totals M 3 � .a 0 0 o rt o 3 C CD (DCD rr O rt n r' A CD � n°. ° 0 (D, Z CD cD a 1 -117 -CC 03 P T W 0.990 CE Mn Federal Funds State Fund Code State Funds Local Funds 1, 319,125 0 205,875 1,319,125 0 205,875 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,525,000 0 0 0 0 Totals 1,525,000 0 0 0 0 Total Funds 1,525,000 1,525,000 Report Date: January 10, 2023 Page 4 .D o' -n A. PIN/Project No. B. STIP ID D � C. Project Title 3 n = c 3a- D. Road Name or Number a ° a as E. Begin & End Termini �' 3 U) 'y F. Project DescriptionG. Structure ID Q. 0 06 4 /9913(004) WA -09755 11/15/21 11/15/21 Grape & Maple Drive 42350/42600 .12/0.0 to .36/.75 Reconstruction - Work will include grade, drainage, curb and gutter, HMA, sidewalk, traffic control and other items. Location: County Line 625 ft. north of SR17 to Stratford Rd. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code S CN 2023 STP(US) Totals M 3 � .a 0 0 o rt o 3 C CD (DCD rr O rt n r' A CD � n°. ° 0 (D, Z CD cD a 1 -117 -CC 03 P T W 0.990 CE Mn Federal Funds State Fund Code State Funds Local Funds 1, 319,125 0 205,875 1,319,125 0 205,875 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,525,000 0 0 0 0 Totals 1,525,000 0 0 0 0 Total Funds 1,525,000 1,525,000 Report Date: January 10, 2023 Page 4 mw Washington State VrAf Department al'Transportation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 CRAB 132,900 15,100 148,000 P M 195,500 1,955,000 v 210,600 2,103,000 < o 0 0 In� A. PIN/Project No. B. STIP ID D o fD rt o Z C. Project Title S 3 � n o D. Road Name or Number o a o n m CD CA 0 a. E. Begin & End Termini '�' -1 O F. Project Description G. Structure ID n, rt o N 4.220 � CE a No 06 5 WA -13303 11/15/21 11/15/21 21 -117 -CC 03 9 -NW Road 9 N 5.84 to 10.06 9 NW Road 93020, work will include earthwork, drainage, BST surface, traffic control 93020 and other items. Location: SR 283 to Dodson Rd Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 CRAB 132,900 15,100 148,000 P CN 2024 0 CRAB 1,759,500 500 195,500 1,955,000 Totals 0 1,892,400 210,600 2,103,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 48,000 100,000 0 0 0 CN 0 0 1,955,000 0 0 Totals 48,000 100,000 1,955,000 0 0 Report Date: January 10, 2023 Page 5 Washington State Department afTyansportafibn Agency: Grant Co. County: Grant Six Year Transportation Improvement Program From 2023 to 2028 MPO/RTPO: Quad -Co RTPO N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 0 0 50,000 50,000 S PE 2024 0 0 10,000 10,000 S PE 2025 0 0 10,000 10,000 S PE 2026 0 0 10,000 10,000 S PE 2027 0 0 10,000 10,00-0 P PE 2028 0 0 10,000 10,000- 0,000S S CN 2023 0 0 250,000 250,000 S CN 2024 0 0 240,000 240,000 S CN 2025 0 0 240,000 240,000 S CN 2026 0 0 240,000 240,0E S CN 2027 0 0 240,000 240,000 S CN 2028 0 0 240,000 240, 000 Totals 0 0 1,550,000 1,550,000 Report Date: January 10, 2023 Page 6 Washington State ,.Department s a Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 10,000 10,000 10,000 10,000 CN 250,000 240,000 240,000 240,000 240,000 Totals 300,000 250,000 250,0001 250,000 250,000 Report Date: January 10, 2023 Page 7 �i� tat Department,of Transportation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 100,000 100,000 P M 1,100, 000 Totals 0 0 1,200,000 1,200,000 o 0 0 -n A. PIN/Project No. B. STIP ID D o � rt c :3Z C. Project Title B n D. Road Name or Number a a c CD � E. Termini ° ou � v, as F. Project Description G. Structure ID a rt o N e 4.000 CE a No 05 7 WA -12567 11/15/21 11/15121 21 -117 -CC 04 P T Stratford Road - Phase 2 Stratford Rd 13.24 to 17.24 Stratford Road - Phase 2 94025 2R - Work will include earthwork, drainage, BST surface, traffic control and other items. Location: 16 NE Road to 20 NE Road ------------ Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 100,000 100,000 P CN 2024 0 0 1,100, 000 1,100, 000 Totals 0 0 1,200,000 1,200,000 Expenditure Schedule Phase 1 st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 CN 0 1,100,000 0 0 0 Totals 100,000 1,100,000 0 0 0 Report Date: January 10, 2023 Page 8 AdftL Washington Stere ;Department of Transportation, Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding M Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 0 0 200,000 200,000 P 0 200, 000 o 400,000 0 -n M. A. PIN/Project No. B. STIP ID n r c� o < o CL C. Project Title CDi cQ ,�� Z c D. Road Name or Number = a 0.2001 EA I No �� CrCA E. Begin & End Termini -°Q 3 N �' MD F. Project Description G. Structure ID n. rt o 07 8 WA -13301 11/15/21 11/15121 21 -117 -CC 11 B -SE Culverts B SE .24 to .44 Culvert replacement - Work will include removal of failing existing culvert pipe, 20550 approaches, traffic control, and other items. Location: (.025 miles south of Lower Crab Creek Road) Funding M Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 0 0 200,000 200,000 P 0 200, 000 o 400,000 u l `° n r c� o CL CDi cQ S CD n. 0.2001 EA I No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 0 0 200,000 200,000 P CN 2024 0 0 200,000 200, 000 Totals 0 0 400,000 400,000 Expenditure Schedule Phase 'Ist 2nd 3rd 4th 5th & 6th PE 200,000 0 0 0 0 CN 200,000 0 0 0 0 Totals 400,000 0 0 0 0 Report Date: January 10, 2023 Page 9 AW MkWngtan State Department of Transportation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO N Inside Six Year Transportation Improvement Program From 2023 to 2028 Y Outside B. STIP ID CD M G. Structure ID tQ WA -13304111 /15/21 94025 -A. o' PIN/Project No. M Z C. Project Title n 0 D. Road Name or Number E, 0Cr E. Begin & End Termini in R F. Project Description 05 9 0 Stratford Road Phase 3 3 Stratford Rd < C 17.24 to 20.28 M X Stratford Road 94025 BMP 17.24 to EMP 20.28 _� 2R - Work will include earthwork, drainage, BST surface, traffic control and other items. c Location 20 NE Rd to BNSF RR Crossing Funding Status Phase Phase Start Year (YYYY) Federal Fund Code S CN 2023 Totals Six Year Transportation Improvement Program From 2023 to 2028 Y Outside B. STIP ID CD M G. Structure ID tQ WA -13304111 /15/21 94025 Federal Funds State Fund Code State Funds Local Funds 0 CRAB 744,000 106,000 0 744,000 106,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 850,000 0 0 0 0 Totals 8503000 0 0 0 0 Total Funds 850,000 850,000 Report Date: January 10, 2023 Page 10 M 0 0 3 N < C � M X D _� m c a o o CDCD M c CL 0 CD Cn <D Q 11/15/21 21 -117 -CC 04 P T 3.040 CE No Federal Funds State Fund Code State Funds Local Funds 0 CRAB 744,000 106,000 0 744,000 106,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 850,000 0 0 0 0 Totals 8503000 0 0 0 0 Total Funds 850,000 850,000 Report Date: January 10, 2023 Page 10 Meir -+n State Dept srtao Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 40,000 40,000 P CN 2024 0 0 250,000 250,000 Totals 0 0 290,000 290,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 40,000 0 0 0 0 CN 0 250,000 0 0 0 Totals 40,000 250,000 0 0 j 0 Report Date: January 10, 2023 Page 11 M 0 - A. PIN/Project No. B. STIP ID D o c� C o M Z C. Project Title 3 sv c D. Road Name or Number = CL = M. 0 �. E. Begin & End Termini �° CL 0 r UCh ) F. Project Description G. Structure ID a ,���, o • tD CL N =r 0.320 Q No 07 10 WA -14069 11/15/21 11/15/21 21 -117 -CC 11 23 -NE Rd Br 171 replacement 93048 9.323 to 9.64 23 NE Bridge 171 replacement Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 40,000 40,000 P CN 2024 0 0 250,000 250,000 Totals 0 0 290,000 290,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 40,000 0 0 0 0 CN 0 250,000 0 0 0 Totals 40,000 250,000 0 0 j 0 Report Date: January 10, 2023 Page 11 Washington tete Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside ending Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2023 STP (R) 865,000 0 702,126 1, 567,1; Totals 865,000 0 702,126 1,567,1; Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,567,126 0 0 0 0 Totals 1,567,126 0 0 0 0 Report Date: January 10, 2023 Page 12 .D M 0 -e M 0 A. PIN/Project No. B. STIP ID 0 D 0 z C. Project Title 0rMl 3 CD 0D. cn Road Name or Number = BD. °' O Cr E. Begin & End Termini = °r M 3 CA 2 CD F. Project Description G. Structure IDM -f 05 11 WA -10861 11/15121 11/15/21 a 21 -117 -CC 04 3 -NE Rd Phase 3 1.990 CE No 94000 8.91 to 10.9 Work will include earthwork, drainage, HMA surface, traffic control and other items Location: S NE to U NE ending Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2023 STP (R) 865,000 0 702,126 1, 567,1; Totals 865,000 0 702,126 1,567,1; Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,567,126 0 0 0 0 Totals 1,567,126 0 0 0 0 Report Date: January 10, 2023 Page 12 M X M 0 0 0 � '_'� rt 0rMl 3 CD C cn to X O nCD r 0 ° CD CL v, CD a 21 -117 -CC 04 P T 1.990 CE No ending Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2023 STP (R) 865,000 0 702,126 1, 567,1; Totals 865,000 0 702,126 1,567,1; Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,567,126 0 0 0 0 Totals 1,567,126 0 0 0 0 Report Date: January 10, 2023 Page 12 Washington state Department of Us1tto Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 STP(R) 27,000 0 10,145 37,145 S CN 2023 STP(R) 1,541,894 0 287,421 1,829,315 M. Totals 1,568,894 0 297,566 1,866,460 X -n MCD A. PIN/Project No. B. STIP ID D y z C. Project Title S ,0� a D. Road Name or Number = a CD N0� Cr E. Begin & End Termini �CD ° 3 in "' F. Project Description G. Structure ID CD CD o 05 12 WA -14077111/15/21 11/15/21 21 -117 -CC Dodson Rd Overlay Ph 2 91030 21.76 to 27.99 2R Work will include HMA resurfacing and traffic control. Location 7 NW to Ephrata City Limits. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 STP(R) 27,000 0 10,145 37,145 S CN 2023 STP(R) 1,541,894 0 287,421 1,829,315 Totals 1,568,894 0 297,566 1,866,460 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 37,145 0 0 0 0 CN 1,829,315 0 0 0 0 Totals 1,866,460 0 0 0 0 Report Date: January 10, 2023 Page 13 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 4,113 0 0 0 0 Washivont- VrAf D'opartment at' Transpodation, Totals 206,715 0 0 0 0 Six Year Transportation Improvement Program From 2023 to 2023 Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO N Inside Y Outside rn = 0 0 0 M.CD -nA. PIN/Project No. B. STIP ID D o c� c o z C. Project Title rt D. Road Name or Number 3 = a S rt m = `� r+ N0 �. E. Begin & End Termini �° c in "' F. Project Description G. Structure ID CL rt c N 05 12 WA -14078 =r CML 04 P T 0.690 CE No Dodson Rd Overlay Ph 3 91030 28.99 to 29.68 2R Work will include HMA resurfacing and traffic control. Location 13 NW to Ephrata City Limits Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2023 STP (R) 2,990 0 1,123 4,113 S CN 2023 STP(R) 170,771 0 31,831 202,602 Totals 173,761 0 32,954 206,715 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 4,113 0 0 0 0 CN 202,602 0 0 0 0 Totals 206,715 0 0 0 0 Report Date: January 10, 2023 Page 14 Department of Transpodation Washington State six Year Transportation Improvement Program From 2023 to 2028 Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code S PE 2023 STP(R) S CN 2023 STP(R) Totals Federal Funds State Fund Code 13,260 757,335 770,595 State Funds Local Funds 0 4,982 0 141,173 0 146,155 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 18,242 0 0 0 0 CN 898,508 0 0 0 0 Totals 916,750 0 0 0 0 Total Funds 18,242 898,508 916,750 Report Date: January 10, 2023 Page 15 0 -,i A. PIN/Project No. B. STIP ID D o c C. Project Title rt rt Z c D. Road Name or Number = D a c � 3 E. Begin & End Termini �° Q. c cNn 'v F. Project Description G. Structure ID a c 21 -117 -CC 04 N P T 05 12 WA -14079 11/15/21 11115121 Dodson Rd Overlay Ph 4 91030 18.70 to 21.76 2R Work will include HMA resurfacing and traffic control. Location: 4 NW to 7 NW Funding Status Phase Phase Start Year (YYYY) Federal Fund Code S PE 2023 STP(R) S CN 2023 STP(R) Totals Federal Funds State Fund Code 13,260 757,335 770,595 State Funds Local Funds 0 4,982 0 141,173 0 146,155 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 18,242 0 0 0 0 CN 898,508 0 0 0 0 Totals 916,750 0 0 0 0 Total Funds 18,242 898,508 916,750 Report Date: January 10, 2023 Page 15 AMIRL Wamhingtan State Department Translation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside .a -v rn O <o CD rt o' 3 �D r - CD rt c A. PIN/Project No. B. STIP ID D o Z C. Project Title CD S M 0 = D. Road Name or Number = D a CE M Na. E. Begin & End Termini 0 "' F. Project Description G. Structure ID cc Q. rt o 04 13 WA -12569 11/15/21 11/15/21 21 -117 -CC Valley Road Overlay / Sidewalk Valley Rd 1.53 to 2.11 2R Overlay - Work will include HMA surfacing, ADA ramps, new curb & sidewalk, 41250 traffic control and other items. Location: Scott Rd to South of H -NE Rd .a rn O <o CD rt O. 3 �D r - CD rt ;U CD n a c co � CD 04 1 P T 0.5801 CE I No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2024 0 0 50,000 50,000 S CN 2024 STP(US) 389,250 0 60,750 450,000 Totals 389,250 0 110,750 500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 50,000 0 0 0 CN 0 .450, 000 0 0 0 Totals 0 500,000 0 0 0 Report Date: January 10, 2023 Page 16 AdMIL hil"1 an VW V*;wrlment oFftnspoirtation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code S PE 2026 S CN 2026 Totals Federal Funds State Fund Code 0 CRAB 0 CRAB 0 04 1 PT State Funds Local Funds 166,500 18,500 1,498,500 166,500 1,665,000 185,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 185,000 0 CN 0 0 0 1,665,000 0 Totals 0 0 0 1,850,000 0 M 0 a� c� 0 � r m CD c ? CD a 4.670 CE I No Total Funds 185,000 1,665,000 1,850,000 Report Date: January 10, 2023 Page 17 -v o' -e < A. PIN/Project No. B. STIP ID c C. Project Title n 0 D. Road Name or Number Q : Cr E. Begin & End Termini �° 3 M v, '� F. Project Description G. Structure ID a �. c 05 15 WA -14072 11/15/21 11/15/21 21 -117 -CC H SE 92005 0.00 to 4.67 Reconstruction- work will include earthwork, drainage, BST surface, traffic control and other items. Location 12 SE to SR 262 Funding Status Phase Phase Start Year (YYYY) Federal Fund Code S PE 2026 S CN 2026 Totals Federal Funds State Fund Code 0 CRAB 0 CRAB 0 04 1 PT State Funds Local Funds 166,500 18,500 1,498,500 166,500 1,665,000 185,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 185,000 0 CN 0 0 0 1,665,000 0 Totals 0 0 0 1,850,000 0 M 0 a� c� 0 � r m CD c ? CD a 4.670 CE I No Total Funds 185,000 1,665,000 1,850,000 Report Date: January 10, 2023 Page 17 Washington State Department of Trmsportation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 HIP(US) 126,178 0 0 126,178 S M 0 216,000 1,600,000 v 0 216,000 1,726,178 � oo o -e A. PIN/Project No. B. STIP ID D o CD rt o S z C. Project Title a 3 a� C D. Road Name or Number a a m `D n M Cr E. Begin & End Termini '�' 'a 9 o � -1 o CD W, fD F. Project Description G. Structure ID a o N M. a CL 05 2.120 a CE No 16 /6069(001) WA -14073 11/15/21. 11/15/21 21 -117 -CC 04 P T Westshore Drive Overlay / Sidewalk 40950 0.83 to 2.95 2R Work will include HMA surfacing, new ADA ramps & sidewalk, traffic control and other items. Location: Fairway Drive to 0.25 S. of 4 NE Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 HIP(US) 126,178 0 0 126,178 S CN 2024 STP(US) 1,384,000 0 216,000 1,600,000 Totals 1,510,178 0 216,000 1,726,178 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 126,178 0 0 0 CN 0 1,600,000 0 0 0 Totals 0 1,726,178 0 0 0 Report Date: January 10, 2023 Page 18 :,& War*hington State Department of Transportation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code P PE 2025 P CN 2025 Totals Federal Funds State Fund Code 0 CRAB 0 CRAB 0 State Funds Local Funds 144,000 16,000 1,296,000 144,000 1,440,000 160,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 160,000 0 0 CN 0 0 1,440,000 0 0 Totals 0 0 1,600,000 0 0 Total Funds 160,000 1,440,000 1,600,000 Report Date: January 10, 2023 Page 19 M 0. 0 ;U 0 0 -n A. PIN/Project No.B. STIP ID CD o fD rt o 3 . , Z C. Project Title D. Road Name or Number = D a. a � = � �_ � `� r-1. � r* a. E. Begin End Termini 10aCA rt 3 ,q o u, F. Project Description G. Structure ID Q a 05 rt o 21 -117 -CC 03 CL � P T 5.820 C E a No 17 WA -14074 11/15/21 11/15/21 Q SW(George to Frenchman Hills) 91035 0.82 to 5.82 3R Work will include earthwork, drainage, BST surface, traffic control and other items. Location: George City Limits to Frenchman Hills Rd Funding Status Phase Phase Start Year (YYYY) Federal Fund Code P PE 2025 P CN 2025 Totals Federal Funds State Fund Code 0 CRAB 0 CRAB 0 State Funds Local Funds 144,000 16,000 1,296,000 144,000 1,440,000 160,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 160,000 0 0 CN 0 0 1,440,000 0 0 Totals 0 0 1,600,000 0 0 Total Funds 160,000 1,440,000 1,600,000 Report Date: January 10, 2023 Page 19 AdW Washington State Department of Tiansportation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 N H P P 60,000 0 15,000 75,000 P CN 2025 NHPP 640,000 0 160,000 800,000 Totals 700,000 0 175,000 875,000 M v � o' 0 0 -n A. PIN/Project No. B. STIP ID D c C o Z C. Project Title S ,y �, 0 n 0 = D. Road Name or Number CD a = `� �* a. E. Begin & End Termini Z 2 o CD F. Project Description G. Structure ID a, CD o Z 0 0.010 CE a No 06 18 WA -14075 11/15/21 11/15/21 21 -117 -CC 11 P T Bridge 382 H NW Rd 30430 2.28 to 2.29 Bridge replacement- Work will include demolition, structure replacement, approaches, traffic control and other items. Location: .4 miles north of SR 28 Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 N H P P 60,000 0 15,000 75,000 P CN 2025 NHPP 640,000 0 160,000 800,000 Totals 700,000 0 175,000 875,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 75,000 0 0 CN 0 0 800,000 0 0 Totals 0 0 8751000 0 0 Report Date: January 10, 2023 Page 20 AdVhL Washington Stade Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 0 5,000 5,000 P CN 2027 0 0 95,000 95,000 Totals 0 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 5,000 CN 0 0 0 0 95,000 Totals 0 0 0 0 100,000 Report Date: January 10, 2023 Page 21 M o'c oM.' A. PIN/Project No. B. STIP ID D o c� o n = Z C. Project Title D. Road Name or Number D a = `< 0 CD �. E. Begin End Termini � o CACh CDF. Project Description G. Structure ID a rt o 11 CL N P T = 0.010 � nm. No 07 19 WA -14076 11115/21 11/15/21 21 -117 -CC Bridge 353 R NW 30330 .01 to .02 Bridge replacement - Work will include demolition, structure replacement, approaches, traffic control and other items. Location R NW and Martin Rd Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 0 5,000 5,000 P CN 2027 0 0 95,000 95,000 Totals 0 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 5,000 CN 0 0 0 0 95,000 Totals 0 0 0 0 100,000 Report Date: January 10, 2023 Page 21 r Wash i�h Eltantat-e Department a' sat Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 10,000 10,000 P CN 2023 0 0 50,000 50,000 Totals 0 0 603000 60,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 10,000 0 0 CN 0 0 50,000 0 0 Totals 0 0 60,000 0 0 Report Date: January 10, 2023 Page 22 _ M M 3 � C X � O O. - A. PIN/Project No. B. STIP ID CD o < C o M M C. Project Title 3 � � �„ � � c7 0 c D. Road Name or Number a a o r A) Cr E. Begin & End Termini �' -a —� o N F. Project Description G. Structure ID Q, o CL Q 05 20 WA -14082 11/15/21 11/15/21 21 -117 -CC 47 P T 0.070 CE No Stratford Bridge 110 94026 0.208 to 0.278 Work includes excavation to spring line of the pipes, CDF fill; one lift HMA, traffic control and other items. Location: 22.7 NE to 23 NE Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 10,000 10,000 P CN 2023 0 0 50,000 50,000 Totals 0 0 603000 60,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 10,000 0 0 CN 0 0 50,000 0 0 Totals 0 0 60,000 0 0 Report Date: January 10, 2023 Page 22 Washington State Department of'Transpartation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Phase 1st 2nd 3rd 4th 5th & 6th Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 0 M 375,000 P RW 2025 0 0 50,000 50,000 P CN 2026 0 0 2,075,000 2,075, 000 Totals 0 0 2,500,000 2,500,000 o ;U 0 0 A. PIN/Project No. B. STIP ID D o c oB Z C. Project Title 3 rt ai M n 0 D. Road Name or Number = `� r �-* Cr E. Termini o o C ai 2 F. Project Description G. Structure ID Q rt o N P T � 0.010 a CE Q Yes 05 21 WA -14081 11/15/21 11/15/21 21 -117 -CC 21 Dodson Road - Road 12 SW Intersection Improvements 91030 2.235 to 2.245 Install a roundabout at the intersection of Dodson and 12 SW. Work includes earth work, curb installation, traffic control devices, and other items. Funding Phase 1st 2nd 3rd 4th 5th & 6th Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 0 0 375,000 375,000 P RW 2025 0 0 50,000 50,000 P CN 2026 0 0 2,075,000 2,075, 000 Totals 0 0 2,500,000 2,500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 375,000 0 0 RW 0 0 50,000 0 0 CN 0 0 0 2,075,000 0 Totals 0 0 425,000 2,075,000 0 Report Date: January 10, 2023 Page 23 VrAf Washington tate Six Year Transportation Improvement Program Dpartof sat From 2023 to 2028 Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO N Inside Y Outside M v � o 0 0 cn c ...� ,n A. PIN/Project No. B. STIP ID D o Z C. Project Title rt e n CD CD rt D. Road Name or Number a �, c rt `� r s CD 3 0. E. Begin & End Termini M � c � v, 'v F. Project Description G. Structure ID a �. o y CD a 07 22 WA -14084 11/15/21 11/15/21 21 -117 -CC 03 P T 1.060 CE No K.7 NE 7 NE to 8 NE 43070 0.0 to 1.06 Work includes earthwork, BST, traffic control, and other items. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2025 0 0 15,000 15, OOC P CN 2026 0 0 100,000 100,00C Totals 0 0 1157000 115,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 15,000 0 0 CN 0 0 0 100,000 0 Totals 0 0 15,000 100,000 0 Report Date: January 10, 2023 Page 24 Washington Stato Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 0 CRAB 108,000 12,000 120,000 P M 149,500 1,495,00O o 161,500 1,615,000 � o 0 0 -e A. PIN/Project No. B. STIP ID D CD c � rt o Z C. Project Title 3 �,; ai n o D. Road Name or Number o a o n r a) U 0 a. E. Begin & End Termini -a S o .� -0 0 's' � F. Project Description G. Structure ID � CD tD, o CD a 06 23 WA -14924 10 3.000 No S -NW Br 355 31550 0.990 to 3.990 S -NW BST surface, replace bridge 355 with pre -fab concrete bridge; finished width 34ft. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 0 CRAB 108,000 12,000 120,000 P CN 2024 0 CRAB 1,345,500 149,500 1,495,00O Totals 0 1,453,500 161,500 1,615,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 120,000 0 0 0 CN 0 1,495,000 0 0 0 Totals 0 1,615,000 0 0 0 Report Date: January 10, 2023 Page 25 VWashington Stere ,Department of TranWrtation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase M Federal Funds State Fund Code v Local Funds Total Funds P PE 2023 .a 0 250,000 250,07 P o'0 2024 0 OTHER 800,000 0 800,000 P CN 0 0 -e 800,000 A. PIN/Project No. B. STIP ID 800,000 P D o M rt o_ 0 5,300,07 Z C. Project Title 0 6,900,000 250,000 S CD 0 = D. Road Name or Number = CL CD � 0 S E. Begin & End Termini o o CL o n o M -I = v,M. RL CD F. Project Description G. Structure ID � a c M N a 07 24 01 7.100 No Hiawatha Truck Route 40555 4.63 to 12.54 Drumheller Road upgrade from primitive to truck route, BST surface from Hiawatha Road to a new round -about at SRI SR282 junction. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 250,000 250,07 P CN 2024 0 OTHER 800,000 0 800,000 P CN 2025 0 OTHER 800,000 0 800,000 P CN 2026 0 OTHER 5,300,000 0 5,300,07 Totals 0 6,900,000 250,000 7,150,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 250,000 0 0 0 0 CN 0 800,000 800,000 5,300,000 0 Totals 250,000 800,000 800,000 5,300,000 0 Report Date: January 10, 2023 Page 26 ninon StUte Department of Transpvrtatibn Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2023 0 0 400,000 400,000 Totals 0 0 400,000 400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 400,000 0 0 0 0 Totals 400,000 0 0 0 0 Report Date: January 10, 2023 Page 27 rn O O O. = A. PIN/Project No. B. STIP ID z C. Project Title D rt C m rt n = c D. Road Name or Number = CD a Q. o• SM CD E. Begin & End Termini �° 3 -� oCD M, F. Project Description G. Structure ID Q, ,��* o N a. 07 25 WA -14986 04 1.570 No Gravel to OII 12 NE and 8 NE 94030/94020 8.24/1.18 to 9.01/1.98 .77 miles of 12 NE and .8 miles of 8 NE Gravel to Oil, BST surface Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2023 0 0 400,000 400,000 Totals 0 0 400,000 400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 400,000 0 0 0 0 Totals 400,000 0 0 0 0 Report Date: January 10, 2023 Page 27 frMkinon state o Department o l�ansportaf dI- Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 BR 870,000 0 0 870,000 P rn 0 0 3,560,000 Totals 4,430,000 0 0 4,430,000 o X 0 0 - A. PIN/Project No. B. STIP ID D c C o Z C. Project Title S a� C o D. Road Name or Number o Q, rt n n Cr E. Begin & End Termini cin '� o M ...� o rCD cD E.M u >v F. Project Description G. Structure ID a rt o � N CL 07 26 WA -14987 10 0.020 No Bridge 247 W SE 26530 1.98 to 2.0 Replace bridge 247; has been of special concern to the Bureau of Reclamation with expanded canal capacity. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 BR 870,000 0 0 870,000 P CN 2025 BR 3,560,000 0 0 3,560,000 Totals 4,430,000 0 0 4,430,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 870,000 0 0 0 CN 0 0 3,560,000 0 0 Totals 0 870,000 3,560,000 0 0 Report Date: January 10, 2023 Page 28 a Washington State Department of Translation Agency: Grant Co. County: Grant MPO/RTPO: Quad -Co RTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 B R 980,000 0 0 980,000 P M 0 0 4,025,000 v OT 0 5,005,000 < o0 -� A. PIN/Project No. B. STIP ID D o m o C. Project Title 3 3 rt as C 0 z c D. Road Name or Number a a c `< mCD n �, a. E. Begin S: End Termini �' -°a a —i o r M U) F. Project Description G. Structure ID to Q, rt c CL ycc CD n. 07 27 WA -14988 11 0.010 No Bridge 248 11 SE west of U SE 24500 4.21 to 4.22 Replace Bridge 248, Rd 11 SE Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 B R 980,000 0 0 980,000 P C N 2026 B R 4,025,000 0 0 4,025,000 Totals 5,005,000 OT 0 5,005,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 980,000 0 0 CN 0 0 01 4,025,000 0 Totals 0 0 980,000 4,025,000 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Grant Co. 17,666,0031 1 14,094,900 9,985,476 41,746,379 Report Date: January 10, 2023 Page 29 Bridge Number: 247 Owner: Grant County Bridge Name: W SE @ East Low Canal Route Carried: W SE Road Year Built: 1951 Average Daily Traffic (ADT) = 15 Existing Bridge Size and Configuration • 87 -ft long x 24 -ft wide bridge • Structure Depth = 24 -inches • Gravel roadway • 3 -Spans of timber girders supported by concrete spread footing abutments and concrete piers. PROPOSED SIZE AND CONSTRUCTION TYPE WOWS KOVICh t sneering PttO Photo 1: Bridge 247 Elevation Geotechnical Data Summary • Estimated depth to basalt rock = 20 below ground surface. • Driven piles feasible if lateral fixity can be achieved. Pre -drilling may be an option using air rotary methods to drive and socket the piles into basalt. Photo 2: 247 Aerial Image (Google Earth) Special Features to Consider during Design 1. Horizontal alignment of roadway would require a deviation in design speed (lowered to 20 mph). 2. Property at southwest corner of bridge would preclude adjustment of Operating and Maintenance (0&M) Road for guardrail placement. Grant County Bridges -- Odessa Groundwater Replacement Program 247-1 OGWRP-COUNTY BRIDGES SUMMARY OF ESTIMATED QUANTITIES W SE ROAD BRIDGE 247 - 38'x 141' GRANT COUNTY Item STD i ; # -- -- ----------------------- ------------------ --- ---- ----- --- ' # ;DESCRIPTION 'PREPARATION -- - -- - - ;QUANT ---: -- --------=----------------------------:-------------------------------- ;UNITS ;UNIT PR :EXTENDED 1 0001 ;MOBILIZATION 1 ;L.S. 275,66646'"1 $ 275,000.00 2 0071 :REMOVING EXISTING BRIDGE 1 ;L.S. $ 76,200.00 $ 76,200.00 GRADING- --------------------- ------ 3 : 0310 ;ROADWAY EXCAVATION INCL. HAUL ------------; ------------ --- --------------- -- -- -- ---- --- -------------------------------------------------------- : 353 C. : $ 45.00: $ 15 885.00 4 ...-- ------------------; 0405 :COMMON BORROW INCL. HAUL842 ------------------"-----...-----------------------------------""-----------•-----------"--:-"•-----------"--:--=---=--------=---------------45.00 ---- -;- -- -- �C Y - •--- --------- ------ -- , ----------- 5 0470 ;EMBANKMENT COMPACTION 20.00 ---•------...37,890.00-- ; $ 16,840.00 DRAINAGE 6 1040 :CHANNEL EXCAVATION INCL. HAUL ' ---"-----•-•----- 3100 ; C.Y. C.Y. i 45.60 ""'---- $ 139,500.00 7 1085 ;QUARRY SPALLS ------76------;---------------,- C.Y. - ; $ ------------------------, 90.00 -------------------------------- ; $ 6,840.00 -----....- STORM SEWER -3091' ; --------------- _ _ :CATCH BASIN -TYPE 1------------------------------------------•--•-----.-- ------------------------------------------------------------------------------------------------------:- ----- --.•- --,-- -2- -;----------- EAC :-- ----•.-------------------------•--r-$---•----------------- 3,700.00 - 7,400.00 9 3541 ;SCHEDULE A STORM SEWER PIPE 12 IN. DIAM. ---- - - ---- 80 - --H- L. F. ---- --$ ---- --- 150.00 _; ._ ; $ ___ ___ 12,000.00 STRUCTURE 1 -10 -= - --- -----•-- ----- - ---- -- - ----- -- ---------------------------------------------------- 4001 ;TEMPORARY BRIDGE ------- ---------= 0 --------------- : L.S. ---- ; $ --------- ---- ---- - --:------------------------------- :$ 11 : 4006 :STRUCTURAL EXCAVATION CLASS A INCL. HAUL 145 C.Y. : $ 120.00_ $ 17 400.00 12 -- ------ : 4013 ;SHORING OR EXTRA EXCAVATION CL. A -- ---- -- -- • ----------- -- - -- - - ---- ---------------- --- --- --- 1 :L.S. 5,000.00 $__ 5000.00 -- - ---------------------------=-- 13 : 4063 :PREBORING FORST. PILE ; : 450 -------------:- L.F. - : $ ----------------- -_� 160.00 $ ------------- ___ __ 14 4085 ;FURNISHING AND DRIVING STEEL TEST PILE ----------------- ------------- ---- - --------- --- ---- -- - -- --- - - --------------- --- --- ---- - ---- -- 2 ;EACH : $ 34_,_000.00 ; $ 68,000.00 15 ------------ : 4090 FURNISHING ST. PILE .1 ............. 4.._ -------------------"-----------•-------"------------------"------------------------------ ---•-------------•---- 336 ---------=--------- :L.F. $ - • 150 00 --- ------------ ; $ ---------------- " 50, 400.00 16 4095 :DRIVING ST. PILE -----....................................................................................... 16 _ """'" '" EACH •"� _ _ $ _ "-""' 9,000.00 _ _ -------- $ -144 000.00 174025 GRAVEL BACKFILL FOR WALL -- -- -----• -- ---- = -- --- - - - -- ------ ------------------------ ------ 79 ------• C.Y. -------------'----�----------------' $ 9-O--.-O-,6--r:-$- ---------- 7 110.00 18 --------------•-----------------', : 4149 :ST.REINF. BAR FOR BRIDGE -----------------------•---------------------------------•----------......----•----------------•--•---.----•--------------------•--' 8565 •""" """"-"""'--" : LB. - --- "-"- -- �" - --3.- - ---------- 29,977.50 19 ---- ---- 4300 :SUPERSTRUCTURE -- --- ---- - • -- -- - -- - --- -- ----------- ------------------- ---- - --- - -- --- -- 1 : L.S. -----,------------ ............................................................. 1,408,438.00-_; ' $ 1,408,438.00 20----------------------_ 4322 :CONC. CLASS 4000 FOR BRIDGE ....--------- 54 ------._.._ :C.Y. $ 1,600.00: $ 86,400.00 21 -- `OREGON 2 -TUBE BRIDGE RAILING - ------------------------------------------------------------- : 282 ------- ---- -- ------ :L.F. ------------ : $ 410.00 $ 115 620.00 SURFACING ;----------------------------; ---- ------ --- --- ----- -- --•-22-- - _ 5100 ;CRUSHED SURFACING BASE COURSE :TON- 50.00 $-_"- 33,95000 23 _ -"---- --" "-"-- 5120 ;CRUSHED SURFACING TOP COURSE -- -"_--679- "_- 750 --"- ;TON _ _$"- -----_"_ _ -- --- HOT MIX ASPHALT -rFiIVIA'CL: , ---24 -------------- __ _ _57671/2•IN. PG -64-28'-----------••----• ............."-------•-------•- 1 _ .y.________________________________________________________________________________ ................. .................-- ------.....250.UU -..-------•---------....._---- _ EROSION CONTROL AND PLANTING-"'---'-"-----'---"-- EROSION __ __,__....._._____..___....__.._...___,-------------------------- ______. _. _....__..___.____.1 -------------------------------- -'--"- - 25 6373 :SILT FENCE --- ------•-------------------- -- -- - ---- - ------------------------------------------------------------- 1240 L.F.-------- $ 8.00 $ 2 26 ----•-•------ : 6403 :ESC LEAD ' -----•-------y-------------•"--------.......---"---------------------------------------------------------------------------------•-----......------•----•---•--------.--� •---------------• -' 25 -- - ---- :DAY - = ------------------------ ' $ 150.00 ------------ ' ' $ 3,750.00 TRAFFIC ------------"---------•------ 27 -- -- 825 6727 :EXTRUDED CURB 96 ;L.F. ---•----------- - --------------------- ---- - -- -------------------------------------------------' 6757 '--"---"-----' "-"""""'"" :$ "-- --------------------------- 60.00 , $ 5,760.00---- -------------1.....---•-•--' BEAM GUARDRAIL TYPE 31 --------------------------------------------------; L.F. $ 100.00 ..----------- $..............2,500:00. -- -_29 30 6759 :BEAM GUARDRAIL TYPE 10 --- - --- -, -- --------------- --- --- --- ---- - ---- ----- -- ---- - --------------- 6760 :BEAM -----------...---.----------------•-----------------------...._� 28 -------- - --=- : L.F. -- -- -- ;$ ----- -- 120.00 --- ----------- '$- , 3 360.00 , ___ GUARDRAIL TRANSITION SECTION TYPE 21 ' ' 2 : EACH : $ -- 6,500.00 r--- _ :$ __ __ ----------------- 13,000.00 31 6766 ;BEAM GUARDRAIL ANCHOR TYPE 10 : 4 :EACH $ 2,000.00: $ 8,000.00 -- - ---32 --6806 ;PAINT LINE (PAVED ROADS)---- ------ - --- -- -- - -- -- -- - ------ Q - - - F' -- -- L----------------------------- ---: $ 3.00 $ _ 33 6971 ;PROJECT TEMPORARY TRAFFIC CONTROL 1 L.S. L S :"-"-- .____._..._r.$ -3--"- 35,000.00 _ ----.._-_ ' ..__...___ 35,000.00 OTHERITEMS -----------------------------------•- 34 : 7018 :,WATER ---35----;- -7037 -:STRUCTURE 200 : mG_al 20.00 ----------; SURVEYING----------------------------•--................- ---- --- -� --------- -- ------ -- ----- -- -------------------- ----- -- ---- ---------- _ -,•--••---� --"-- _ ;- •----.....-$ LS ' .. •-- $ -•------...............................4,000.00 - $,000:00-; - 36 7038 ROADWAY SURVEYING ------------------------------ L.S. -------------------------------------------------------oo.00- $ 81000.00 ; $ 81000.00 37 7490 ;TRIMMING AND CLEANUP -------------;---""--------...-----"----------"------------•--..........--------------------•--------••--------•---•--=•---•"--• : 1 :L.S. . $ 6,000.00: $ 6,000.00 38 -- ----; 7736 SPCC PLAN..--••--•,---------"--........--•"--------"---"--------� ----- -- -- �- -- -- - - -- - --- --- -------------------------------- ---- ------ ----------- 1 L.S. : $ 2,000.00 ---•--•---- 00.00 39$ ;UTILITY WORK ------------------'--------------- : 1 L.S.'-----"--$------ _ --3,000.00 _2,0 - 3,000.00 ' ------------------------ , ' Construction Cost ; $ 2,775,640.50 --------------------------- ---- - ---- ------ --- - - -- ---------------------------------------------- ' CONSTR. ; 10% -- - : - ---------------------------•-------------------------------- Contingency g Y , $ 277,565.00 ' Total Construction ; ' $ 3,053,205.50 ENGR. 15% Preliminary Eng. ; $ 416,347.00 14% ; Construction Eng.: $ 388,590.00 --------------------------- ------------------------------------------------------------------------------------------ ' TOTALS 2023 TOTAL $ 3,858,142.50 ' ' 2024 TOTAL $ 41166,794.00 ............................ Inflation Inflation 8% 2025 TOTAL $ 4,860,149.00 ' TOTAL COST PERS FT. Q $ 721.00 -.•--.. ----- ----- SUPERSTRUCTURE ; , -- -- -- PRESTRESSED CONCRETE b ------------------------------ -----1-1-- - ---- L.F.---------- -$- -------1,120.00 -$ --1,243,200.00 ' CONC. CLASS 4000 FOR BRIDGE ............. -------------------"---...---------•------ : 41 ; . $ 1,800.00 73,800.00 ------------- ' ST.REINF. AND EPDXY BAR FOR BRIDGE ----------------------------------------------------------------------------------------------------•--.---------------- 10518 ; LB. ' --------------- 3.50 ; $ 36,813.00 KEYWAY GROUT : 972 - ------ : L. F. -$ - --- -------25.OU ; $ - -- PRESTRESSED GIRDER WELD TIES 196 :EACH ; $ 40.00 $ 7,840.00 NOSINGANGLE ' __ -------------- -""_ • ""- - - -- --- -"- ----------------;----------------•------------------------- -"--;--- 76 ;L.F. : $ ---------------------------------- 15.60_; $ 1,140.00 LAMINATED ELASTOMERIC BEARING PADS ---1-6 - "-;EACH """-• -$ -- ----•" 1,100,00 $ -"---" -17,600.00 ------------------------------- BUTYL RUBBER STRIP ------ -- - -- - ---- -- - - - - -------...--------- --- : 79 :L.F. $ 15.00 ' $ ------ 1 185 00 -- --- GIRDER STOP PADS ------------- ;-----------------------"-------------------------•---------------------------•-----.....---------- _--- 1 ------ ----- 32 •....---•---•--•--•----------------..--•-•-•-•-----••----...--- ---------•------------------------- ; EACH $ - 80.00 =----------- ; $ ------------------------.-- -- -'----=--- - 2,560.00 .. -------- __"_"_-.__"_"____-_-_____" 1 ------------------- -- ------ ------------ I -------------- ------ Total Superstructure : $ 1,408,438.00 , NICHOLLS KOVICH ENGINEERING, PLLC 247-2 Bridge Number: 248 Owner: Grant County Bridge Name: 11 SE @ East Low Canal Route Carried: 11 SE Road Year Built: 1952 Average Daily Traffic (ADT) = 20 Existing Bridge Size and Configuration • 80 -ft long x 25 -ft wide bridge • Structure Depth = 24 -inches • Gravel roadway • 3 -Spans of timber girders supported by concrete spread footing abutments and concrete piers. PROPOSED SIZE AND CONSTRUCTION TYPE s WOWS KOVICh meet c Photo 1: Bridge 248 Elevation Geotechnical Data Summary • Estimated depth to basalt rock = 15 ft below ground surface. • Driven piles feasible if lateral fixity can be achieved. Pre -drilling may be an option using air rotary methods to drive and socket the piles into basalt. Photo 2: Aerial View of 248 (Google Earth) Special Features to Consider during Design 1. No detour available. Roadway dead ends at private property. Assume temporary bridge/temporary easement is necessary. 2. Utilities on north side - 12" water line and 2" telephone. 3. Pump station and pit at northwest corner. Grant County Bridges — Odessa Groundwater Replacement Program 248-1 OGWRP-COUNTY BRIDGES SUMMARY OF ESTIMATED QUANTITIES 11SEROAD BRIDGE 248 - 38'x 132' GRANT COUNTY Item ......... STD ....................... ......................................................................... .............................. ............................. .................................. ­-----­--- ...... ----------------------------------------------------------------------- .... PREPARATION ------------------------------------------------------------------- :.QUANT UNITS :,UNIT PR --------------- ---..... ...... ---------- ....... ------------------------------------------------------------------- -------------------------------- --------------- ................................... 1 -2 ------- L.S. ------­----­-------------- 2852-0-00-.00 ---------------------------------- $ 285,000.00 ............................. 0071 REMOVING EXISTING BRIDGE ............................................................................................. ---------- 1 ...................................................... ----------------- L.S. - $ -------- 70 OOO.Ob ------------------------------------- '- $ 70,000.00 ....................•--------------------------------------------------------------------------------- GRADING ........... .................................. ....... -------­---------- 0310 :ROADWAY EXCAVATION INCL. HAUL ---------------- i ------------------------------------------------------------------------------------------------ ------------------------------------ - 565 C.Y. ------------------------------- :$ 45.00 ----------------------------------- : $ 25,425.00 --------------............... 1 0405 :COMMON BORROW INCL. HAUL I ................................................................................................ "EMBANKMENT _r ------------------ 1566 ----___ ------------------ C.Y. ----------------------------------------------------------------- $ 45.00 $ 70,470.00 ------------------ 0470 .... : ------ COMPACTION --------------------------------------------------------------------------------------------------------------------- 1566 ....... ............ F � ­­--­--­--- ------- ------66 -------------- DRAINAGE ---------- ---------------- j ---------------------- 2 ------ -------- 7 ----------- ..... ib�b .... ------------- -------_--------__- 1-b-8- --- L ------------------------------------------------------------------ L .................................... 2980 ----- ------------------------------------ C.Y. ............................... i $ : ----------------------------------------------------------------- 45.00 ................................. :. $ 134,100.00 SPALLS 69 C.Y. $ 90.00 $ 6,210.00 STORM SEWER 8 ...... ... 3�dg ..... ................................................................................................ 1 :CATCH BASIN TYPE 1 ---- --- .............................. 2 EACH ........................... ...... $ 3,700.06_"'-•------------------------------ 9 ............. 3.541 :SCHEDULE A STORM SEWER PIPE 12 IN. DIAM. .... ....... ................................................ .......... .............................. 80 ............................... L.F. $ 150.00 $ , -2, 0-0 0. 0 0 ----------- L STRUi�fbi�ff ............................................. 0- ----- ;TEMPORARY - - -------------------------------------- --- 4-0-0-1- ---- :.TEMPORARY BRIDGE -------------------------- 1 L.S. -------- --------- 2 :1 ------------ ------- - :�6� 0 13.2 y 466C.,,".�TRUCTURAL EXCAVATION CLASS A INCL. HAUL ------------------------------- 137 C.Y. 120.00 ----------- --- 16,440.00 12 _40'13,'-SHORING OR EXTRA EXCAVATION CL. A J 1 L.S. $ 5,000.OV.. $ 5,000.00 1 --------- REBORING FOR ST. PILE ----- -72 ------------------ - 456 r ------------------ ---------------- ------------------------------------------------ ------------------------------ 160.00 $ -------- 000.00 o ------------"66d. .............. ................................. ................................................ .................... :.FURNISHING 2 ---- 0 ...................... EACH $ 34,000.00 $ 68 -b-6- 15 --------- 4090 ... ST. PILE ----------------------------------------------------------- 0 ------------------------------------------------------------- 343 L.F . ........ ----------­-- ........................... 0 $ 2 ....... 51,450.00 16 469� :DRIVING ST. PILE J 16 0 ------- EACH ------- :$ ------------1-400-6.00 ...... 17 ................ 4025 :GRAVEL BACKFILL FOR WALL 0 .......... m ................. 0 ................................................ 0 ...................... ',ST.REINF. 79 C.Y. $ 90.0 0-; $ 7,110.00 i.�� ------------------ 4149 I BAR FOR BRIDGE ----- ------------------------------- m -------------------- 0 ------------------------------------------- --------- -------- : .... ------------.................................. 3.50 $ 29 977.50 1 ............. i� 00 :SUPERSTRUCTURE o ............. ............................................................................................... I ----------------------- 1 ................................ .... L.S. ............ : ----- fib� ---- 0 -------- 1 587.00j"$ •------------- -------- 1 ------------ 1,162,587.00 20 ------ - -------------- 4322 :CONC. CLASS 4000 FOR BRIDGE -------------------------------------------------------------------------------------------------54 r------------------ C.Y. - - ............................. : $ 1,600.00 . ---------------------------------- $ 86,400.00 21 ............................. :OREGON 2 -TUBE BRIDGE RAILING .............................................................. 0 ...... 0 ........................... 264 L.F. ----------- ----------- $ 0 ------------------ 410.00 ---------------------------------- $ 108,240.00 SURFACING .1 --­-------------­ * --­--------- .. .................................................................... 22 ......... 5100 CRUSHED SURFACING BASE COURSE ................................. 0 ............................. 0 ................ .............. 1109 ---TON :$ 50.00 $ - -------------- ............ :.CRUSHED SURFACING TOP COURSE ........ 1225 --------------- --------------------------------------------- m ------------------ 0 ----------------- 0 -------------- I ------ -------- fb Kf .....$ .....-----------------------------=-----------------55,450:00 50.0 61 250.00 HOT MIX ASPHALT 11 ---------- ----------- ----------------- ---,---------------------'------------ 1 24 ...............--•--------- 5767 :,HMA CL. 1/2 IN. PG ------------------------------------------------------- .. ............... 0 ................... 0 ................................... m ............ ...------------------ 0 ----------------- TON --------------------------- 250.0 0 ----------------­-­----- : 0----' ----------- m ............. ........ EROSION CONTROL AND PLANTING e .................. ................ . . . . . . . . . . . . . . . . . . . . 0 . . . . . . . -----;--------------------------------- . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 5 ........... ----------------------------------------------------------------------------- ...................... ------------- 0 ......................... ------------------ 1880 .................. ---------------- L.F. ----------------------------J----------------------- 26 ............................. ...................................................................................... 0 .......... 25 L .................. ...................... DAY $ 0 ................... --------------__-- 2 ...... 6b] 150. $ 3,750.00 ------------------- TRAFFIC ------------------------------------------------------------------------------------------------- ............. ... .................... .................................. 27 ..--•-------•-............... 6727 EXTRUDED CURB ' L .................................. I ................................... ................... 0 ...... :.BEAM ------- 0_�6 -------- ---------- ---­-------------- 1 $ ---------•-------------------------------- 0.00 $ -- 5,760.00 28 -------- 6757 GUARDRAIL TYPE 31 --- ---------------- 0 ---------------------------------------------------------------------------------------- --------- EF. ............ 1 .............................. $ 100.00 I .................................. .$ 2,500.00 :BEAM GUARDRAIL TYPE 10 --------- L.F. ------------ $ ----------- 1 -----------­---3-,-3bb.00- 30 ............................. 6760 :BEAM GUARDRAIL TRANSITION SECTION TYPE 21 4 ............. m .......................................................................... 2 -------------------------------- EACH $ ------------------------------- 6,500.00 $ 13,000.00- ------ 31 0 -------- 6766 :BEAM GUARDRAIL ANCHOR TYPE 10 0 ........ --- 1:_F5ANT__-E1-N-E ---------------------------------------- 0 ------------------ ........... I 4 EACH ..... I. :$ 2,000.00 ................ $ 0 ................. 8,000.00 �f ......... Mb6 (PAVED ROADS) .... %. ------------------- 0 ---------------- L.F. 11 F$ -------------- 0 ­---------- 3.00 ---------------------------------- $ -----------------------------33 PROJECT TEMPORARY TRAFFIC CONTROL 6971 ------------------------------------- 0 ---------------------------------------------------------- --------------_- ----------- -----_---------- L.S. $ ----­------- �0'1000.00 11 ............................. $ 30,00066" OTHER ITEMS ------------------------------------------------------------------------------------------------ 0 ------------------------ ----------- ---------------- ---------------- ------------------ - 7018 :WATER --------------- - -------- 300 ---- ------------ meal I ------------------ b ---------------------------------------- .00 $ - 6,000.00 35 ---------­-------- 36 7037 :STRUCTURE SURVEYING I -------------------------------- 0 ---------------------------------------------------------------- :ROADWAY ---------------_---------_- L.S. $ ---- -------- 8,000. 00 0 ---------------------------------------------- $ 8,000.00 ------ --- 7038 SURVEYING ------------------------------------------------------ 1 L.S. 8,000.00 $ 8,000.00 ...... .......... ............................................................... ............... ---------------------------------------------------- L.S. $ 6,000.00 ---------------- 6-,bbb ------ " ------ §9 ----------­------ .................. .................00 �EA�--------------- 1 -------------------------------------------------------------------------------------------------L.S. -------- $ -------- f-----.--------:---------------.-.-..-..--------- 400.00 ... ----------------------------------------- : 2,000.00 - ............................. :UTILITY WORK ............. M ---------------------------------------------------------------------------------- ----------­-----------------....------------------•-----.... 14,000.00 $ ................................. 14,000.00 ----------------------------- -.--.---------------------­-------------------------------- ----------------------------------------------------- 0 - ------- ----- :Construction --------Contingency 0--3--,,-2--52--.-7--5 ..................... ..........................0...............m.....................................................CONSTR. ....16i.....-------- . 0................... -C---o-s--t - -:---$ -- -----2,9-- $...-----290,326.00 - - ------------------------------------------------------------------------------------------------------------------------------ . ....................-j­--------Total Construction $ 3,193578.75- ----------------------------- ------------------------------------------------------------------------------------- ------------ FAIGR. A 1. --- ------------------------------------ 15% : Prelimin Eng. $ 435,488.00 ------------................ ------------------------ 0 .................................................... 0 ................. 4% -------- ---------------------------------- Construction Eng.: $ 406,456.00 ----------------------------- ...................... ------------------------------- m --------------------------------------------------------------- TOTALS m ...... ................................... 0 ............................................................. 2023 TOTAL $ 4,035,522.75 ------­----------------- : --------------- 0 --------------------------------------------------------------------------------- 2024 TOTAL $ 4,358,365.00 ............................. ------------------------------------------------------------- 0 ---------- 0 ....................... Inflation 8% 2025 TOTAL $. 5,083,597.00 ----------------------- ---- ---------------------------------------------------------------------------------- -------------- 2023 TOTAL COST PER SQ. FT. $ 805.00 ..................... ---------------------------- SUPERSTRUCTURE •--__--- -- -_- -_ ___ ---------------------------------------------------------------- PRESTRESSED CONCRETE GIRDERS --------------------------------------------------------------------------------- ------------ ------------------------------------- 909 ------------------ L.F. $ ---- ------------------- 1,110.0d -- FV -------- - ----- - ---- 1,008,9 96. 0 ............................. CONC. CLASS 4000 FOR BRIDGE ..... 0 .......... 0 .......................................... m ...................................... 40 ----------------- C.Y. ---------------------------- $ 1,800.00--: ; -------------- $ -------------------- 72,000.00 ----------------------------- ST.REINF. AND EPDXY BAR FOR BRIDGE ----------------------------------------------------------------------------------------------- ...... T5�6Z­ ..... .............................. $ 3.50 .................... $ __�i 35,917.00 --------------------------- ------------------------------------------------------------- KEYWAY GROUT ----------------------- ----------------------------------------------------------------------------------- ------- �­_ L.F. : _� --i � -0 ------- $ --------------------------- 19,475.00 ................ 0 ............................................................................................... PRESTRESSED GIRDER WELD TIES .............. .1 156 .................................... EACH $ 40.00 1.---------------------------------- $ 6,240.00 ---------------- -------- NOSING ANGLE 76 L.F. ........ ------ ............................. LAMINATED ELASTOMERIC BEARING PADS .......................................... 14 ............. EACH $ .00 $ 15,400.00 ------ 0 ------------------- BUTYL RUBBER STRIP:$- - - - - - ------------------------------------------------------------ 79 m ..... ------------------------- --------------------------•-----1,100 L.F.15.00 .................................. $ 1,185.00 -------------------------------------------- GIRDER STOP PADS 0 ------------------------•------------------ 28 ------------------ ; - -------- EACH :_$ ----------------- 1 ----------------------------- 8_0__._0__0_ - ---- --------------- $ -1 ----------------------------------- -------- 2,240.-66-' .............. -------------- --­---------- .............................................................................. m .............. m ........... .............................. .......................... Total Superstructure NICHOLLS KOVICH ENGINEERING, PLLC 248-2