HomeMy WebLinkAboutResolution 23-006-CCBOARD OF COUNTY COMMISSIONERS
Grant County, Washington
RESOLUTION IN THE MATTER OF RESOLUTION No. 23 -()CU -CC
AMENDING RESOLUTION 22 -120 -CC
AND 22 -131 -CC ADOPTING THE SIX
YEAR TRANSPORTATION
IMPROVEMENT PROGRAM FOR 2023-
2028
WHEREAS, a priority array of projects was prepared in accordance with the County Road
Administration Board Standards of good Practice: WAC 136-14 and was made available and consulted by
the Board during the preparation of the Six Year Program; and,
WHEREAS, pursuant to the requirements of R. C.W. 3 6.81.121 and WAC 136-14, the Grant
County Road Engineer submitted the Six Year Transportation Improvement Program for
2023 through 2028 to the Board of County Commissioners on October 11, 2022; and
WHEREAS, a report with respect to deficient Bridges was available to the Board during the
preparation and discussion of the Six Year Program;_and
WHEREAS, a SEPA application was submitted for environmental pre -assessment and a letter of
Addendum was received from Grant County Development Services indicating that the social, economic
and aesthetic values would not be disturbed, and
WHEREAS, A Notice of Public Hearing was published twice for 2 weeks preceding the Hearing,
with no objections to the process and, said hearing was held on November 22, 2022,_and
WHEREAS, the Board of County Commissioners has reviewed the recommended program for
2023-2028 and has made the revisions and changes deemed practicable to the County's long range road
program; and
WHEREAS pursuant to the requirements of R.C.W. 3 6.81.121 the legislative authority shall
adopt a Six Year Transportation Improvement Program updated yearly, the Board of County
Commissioners did prepare, revise, and extend the Six Year Program and did hold a Public Hearing on
November 22, 2022, Adopting said program as resolution 22 -120 -CC. Said Resolution was amended for
wording via Resolution 22 -131 -CC.
C:\Users\rlmina\Downloads\ATTACH B - 6YEAR TIP 2023-2028 AMENDED
RE S OLUTION. do cx
NOW, THEREFORE, BE IT HEREBY RESOLVED THAT the Grant County
Board of Commissioners, AMEND the Resolutions 22 -120 -CC and 22 -131 -CC to include several
projects., adopting the 2023-2028 Six Year Transportation Improvement Program for the years 2023
through 2028.
DATED this day of 2023.
ATTEST:
C:\Users\rlmina\Downloads\ATTACH B - 6YEAR TIP 2023-2028 AMENDED
RE S OLUTION. do cx
BOARD OF COUNTY
COMMISSIONERS
Yea Nay
Abstain GRANT COUNTY, WASHINGTON
Rob Jones, Chair
dy Cartier, Vice -Chair
DannyV.Stone, Member
C:\Users\rlmina\Downloads\ATTACH B - 6YEAR TIP 2023-2028 AMENDED
RE S OLUTION. do cx
;Ile
Grant County
ayFe�;
Department of Public W
Y _«� 124 Enterprise St. S.E.
Ephrata, WA 98823
7 F 7-77"
77
Memo
To: Honorable Grant County Board of County Commissioners
tal0-2 5
Serial No. 22.005
From: Dave Bren, PE, MSCE
County Road Engineer
Date: January 10, 2023
Re: Amending the 6 -Year Transportation Improvement Plan (TIP)
Adding (4) Projects to the Plan: (2) CBDL Bridges, 2023 Gravel -to -Oil Program,
and the Hiawatha/Drumheller Truck Route
Legislative History: Financial Impact:
• First Presentation: January 10, 2023 • 2023 Truck Route Design Work REET $ 250 000
• Second Presentation: t• 2023 Gravel -to -Oil Program (REET) $ 400,000
• 2024 CBDL Bridge #247 (DIR FED) $4,430,000
• 2025 CBDL Bridge #248 (DIR FED) $5,0055000
• Action Requested: =TIP Amendment TTP PrniPct A �1; ; r T�+a� ` , n 4 nnn I
2023 Hiawatha/Drumheller Truck Route Design (REET $250,000): The REET funding provides for the Desi
gn
of the Truck Route including; LIDAR UAS/Drone survey, LIDAR UAS/Drone equipment, GPS ground control
equipment, road design, and cultural report for a new truck route on the West Side of Moses Lake. A shovel ready
design will lead to funding opportunities for the construction. The future Truck Route will connect the Hiawatha
interchange at I-90 to a new roundabout at the SRI 7/S282 split with a new 7.3 -mile section of BSTp aved road.
2023 Gravel -to -Oil Program (BEET $400,000): The REET funding will provide for new BST road surface
construction on (2) top scoring sections of gravel roads; 12 -NE (0.77 Miles) and 8 -NE (0.80 Miles). In addition
the REET funding will provide for a rescoring update of gravel roads to provide for potential continuance of the
Gravel -to -Oil Program in 2024, and beyond.
V/ 2024 CBDL Bridge #247 Replacement (FED DIRECTED $4,430,000): The Federally Directed funding will
provide a new bridge over the Irrigation Canal on Road W, South of Road 2SE. Design would begin in 2024 with
construction conducted in 2025. The larger bridge would remove the canal obstruction, so that the canal capacity
could be greatly increased.
2025 CBDL Bridge #248 Replacement FED DIRECTED $5,005,000): The Federally Directed fundi
ng well
provide a new bridge over the Irrigation Canal on Road 11 SE, West of Road U. Design would begin in 2025 with
construction conducted in 2026. The larger bridge would remove the canal obstruction, so that the canal capacity
could be greatly increased.
To meet current and future creeds, serving together with public and private entities, while fostering a respectful and successful
work environment."
information, ................................... ............ (5 9) 754.6082 Dave Brea, PE, +aunty Road Engineer..Y 3502 Ed LOW11y, SUpervi r -Dish No
FAX ............................ ......... ....................... (50 )x'54-6087 Bob sersan ti, construction Engineer... _.._.......Ext 35.03 Mike DeTrolio, Supervisor -Dist. No. 2__..Y...._......x.E .3'59 .
E4nal............................ pUbficWorks@grantcountyw ,gov Loc Ohi, Accoun tart Lead ...................... ...a.. ... ....... Ext. 3555 John Baia ey, u,peN r° -Dist No.
.............. . . 3. ............. .............
Et3541 ryaF Castro, Public WorksDirector_...Ut. M504 Rod Follett, Foran-sign SbopY••........................PExt. 3 5 7 yo[yM�sf Supervisor -Central shop F.MYY.iIb.b!Ms) 75.4-$086 6
Samuel Dart, Assistant Director ....................... Ext. 35 is Jason tolling, solid Waste .........................{5 ) 75 Sig Andy Booth, Bridge Supervisor ..Y.................... ............. Ext 3535
Fiscal and Policy Implications: The Congressionally Directed Federal funds and REET fundsprovide
for these projects do not require matching funds. These funds provide a $10,085,000 direct economic
benefit to the County during construction of the roads and bridges. In addition, these fundsprovide long-
term economic benefits to the County, by increased road capacity for developable lands, increased truck
route capacity, and increased irrigation capacity for farming.
Commission Packet Attachment
A. Updated 6 -Year TIP Map and Proj ects List
B. Resolution to Amend 6 -Year TIP
I C. I Engineers Estimates for CBDL Bridge #247 and #248
Action Requested
Public Works Staff requests a resolution for approval of an Amended 6 -Year TIP. This will add (4) projects to
the TIP as follows:
v,,' 2023 Hiawatha/Drumheller Truck Route Design
V' 2023 Gravel -to -Oil Program (Roads 12 -NE and 8 -NE)
✓ 2024 CBDL Bridge #247 Replacement
✓ 2025 CBDL Bridge #248 Replacement
"'To as current and future needs. serving to EENNENMM�
gether with public and private entities. while fostering a respectful and successful
work environment."
information.................................................(5+ ) 754-6082, Dave eren, PE, county Road, Engineer............... . . Ext. 35o,2 Ed, LoNvry, Supervisor -Dist. no.
FAX ............................................................... �509) 754-6087 Bob Ba an 0, Construction Engineer... 3503 Mike DeTrolio, Supervisor -gist. No. 2... 3591
E -Mail ... ................ ... ...... . pub ficWorks@grantcountywa.gov Loc Bbl, Accoun ta nt Lead .................. ................... Ext. 3555 John Brissey, Supervisor -Dist No. 3 ......... ................. Ext 3541
Sam Castro, Public Works Director ................... EXt. 3504 Rod. Follett, Forem an -s ign Shop ............................ Ext. 3579 John Spiess t supervisor -central 754-6.086
Samuel Dart, Assistant Director.........................Ext. 3519 Jason Collings, Solid Waste .................. . ...... (509) 75 3i Andy Booth, Bridge Supervisor ................................... Ext 3535
AML
Washington State
Department t Transportation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
S
CN 2023 STP(US) 808,022
0 126,107 934,129
S
rn
0 19,693 145,871
Totals 934,200
0 145,800 110807000
c
A. PIN/Project No. B. STIP ID
D
o
C
a
Z
c
C. Project Title
D. Road Name or Number
D
Q
n.
s
CD
n_
a
E. Begin S: End Termini
CD
'�
'a
B
o
rt
oCD
r
CA
cn "'
F. Project Description G. Structure ID
ca
a
rt
o
M
03
CL
P T W
M
1.020
CE
CL
Yes
05
1
WA -02546
11/15/21
11115/21
21 -117 -CC
COCHRAN RD & OTTMAR RD
41550/41660
0/0 to .89/.13
Reconstruction - Work will include grade, drainage, HMA surfacing, Curb & Gutter,
sidewalks, traffic control and other items. PE done under federal project
STPUS-6079(001)
Location: Airway DR to Valley Rd
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
S
CN 2023 STP(US) 808,022
0 126,107 934,129
S
CN 2023 HIP(US) 126,178
0 19,693 145,871
Totals 934,200
0 145,800 110807000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,080,000 0 0 0 0
Totals 1,080,000 0 0 0 0
Report Date: January 10, 2023 Page 1
ANIL
Washington state
Department of TMnsportafion
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 0 0 115,150 115,150
Totals 0 0 115,150 115,150
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 115,150 0 0 0 0
Totals 115050 p p 0 0
Report Date: January 10, 2023 Page 2
o'
o
-n
A. PIN/Project No. B. STIP ID
D
N
C
M
Z
C. Project Title
B
rt
c
D. Road Name or Number
= CD
a
CL
E. Begin & End Termini
M
j
c
CA '?'
F. Project Description G. Structure ID
Q
rt
o
21 -117 -CC
�
21
y
T
05
2
WA -12565
11/15/21
11/15121
Safety- SR 28 and White Trail Road Roundabout
U NW
22.85 to 22.91
Safety- SR 28 and White Trail Road Roundabout 93010
Intersection- Work will include earthwork, drainage, HMA surface, traffic control and
other items
Location: U NW & SR28 Intersection
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 0 0 115,150 115,150
Totals 0 0 115,150 115,150
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 115,150 0 0 0 0
Totals 115050 p p 0 0
Report Date: January 10, 2023 Page 2
Adak
WaAington. State
Department of zporta o
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
S PE 2023
S CN 2023
Totals
rn
I
0
c
--I
0
0
I
0
A. PIN/Project No. B. STIP ID
X
n
D
o
c�
o
CL
C. Project Title
0
:4
a
P T
Z
D. Road Name or Number
=
D
Q.
M
,0
E. Begin & End Termini
-0
3
j
U) 2
F. Project Description G. Structure ID
ca
n,
rt
0
00
3
WA -13302
11/15/21
11/15/21
21 -117 -CC
05
ADA Ramp/ Sidewalk upgrades Phase 1
Various to Various
Work Consists of ADA Ramp and/or Sidewalk upgrades and other items
Location: (Various)
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
S PE 2023
S CN 2023
Totals
Federal Funds State Fund Code State Funds Local Funds Total Funds
0 0 30,000 30,000
0 0 120,000 120,000
0 0 150,000 150,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 30,000 0 0 0 0
CN 120,000 0 0 0 0
Totals 150,000 0 0 0 0
Report Date: January 10, 2023 Page 3
rn
I
0
c
--I
0
X
0
tD
0
X
n
rCD
c�
o
CL
0
a
P T
ICE
I No
Federal Funds State Fund Code State Funds Local Funds Total Funds
0 0 30,000 30,000
0 0 120,000 120,000
0 0 150,000 150,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 30,000 0 0 0 0
CN 120,000 0 0 0 0
Totals 150,000 0 0 0 0
Report Date: January 10, 2023 Page 3
4666
r,mm Washington State
Department of 'Transportation,
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
S CN 2023 STP(US)
Totals
M
3 �
.a
0 0
o rt o 3
C CD
(DCD
rr
O rt n r' A
CD
� n°.
°
0 (D, Z CD
cD a
1 -117 -CC 03 P T W 0.990 CE Mn
Federal Funds State Fund Code State Funds Local Funds
1, 319,125 0 205,875
1,319,125 0 205,875
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,525,000 0 0 0 0
Totals 1,525,000 0 0 0 0
Total Funds
1,525,000
1,525,000
Report Date: January 10, 2023 Page 4
.D
o'
-n
A. PIN/Project No. B. STIP ID
D
�
C. Project Title
3
n =
c
3a-
D. Road Name or Number
a
°
a
as
E. Begin & End Termini
�'
3
U) 'y
F. Project DescriptionG. Structure ID
Q.
0
06
4
/9913(004) WA -09755
11/15/21
11/15/21
Grape & Maple Drive
42350/42600
.12/0.0 to .36/.75
Reconstruction - Work will include grade, drainage, curb and gutter, HMA, sidewalk,
traffic control and other items.
Location: County Line 625 ft. north of SR17 to Stratford Rd.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
S CN 2023 STP(US)
Totals
M
3 �
.a
0 0
o rt o 3
C CD
(DCD
rr
O rt n r' A
CD
� n°.
°
0 (D, Z CD
cD a
1 -117 -CC 03 P T W 0.990 CE Mn
Federal Funds State Fund Code State Funds Local Funds
1, 319,125 0 205,875
1,319,125 0 205,875
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,525,000 0 0 0 0
Totals 1,525,000 0 0 0 0
Total Funds
1,525,000
1,525,000
Report Date: January 10, 2023 Page 4
mw Washington State
VrAf Department al'Transportation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds
Local Funds Total Funds
P
PE 2023 0 CRAB 132,900
15,100 148,000
P
M
195,500 1,955,000
v
210,600 2,103,000
<
o
0
0
In�
A. PIN/Project No. B. STIP ID
D
o
fD
rt
o
Z
C. Project Title
S
3
�
n o
D. Road Name or Number
o
a
o
n
m
CD
CA 0
a.
E. Begin & End Termini
'�'
-1
O
F. Project Description G. Structure ID
n,
rt
o
N
4.220
�
CE
a
No
06
5
WA -13303
11/15/21
11/15/21
21 -117 -CC
03
9 -NW Road
9 N
5.84 to 10.06
9 NW Road 93020, work will include earthwork, drainage, BST surface, traffic control 93020
and other items.
Location: SR 283 to Dodson Rd
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds
Local Funds Total Funds
P
PE 2023 0 CRAB 132,900
15,100 148,000
P
CN 2024 0 CRAB 1,759,500 500
195,500 1,955,000
Totals 0 1,892,400
210,600 2,103,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 48,000 100,000 0 0 0
CN 0 0 1,955,000 0 0
Totals 48,000 100,000 1,955,000 0 0
Report Date: January 10, 2023 Page 5
Washington State
Department afTyansportafibn
Agency: Grant Co.
County: Grant
Six Year Transportation Improvement Program
From 2023 to 2028
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
Funding
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2023
0
0
50,000
50,000
S
PE
2024
0
0
10,000
10,000
S
PE
2025
0
0
10,000
10,000
S
PE
2026
0
0
10,000
10,000
S
PE
2027
0
0
10,000
10,00-0
P
PE
2028
0
0
10,000
10,000-
0,000S
S
CN
2023
0
0
250,000
250,000
S
CN
2024
0
0
240,000
240,000
S
CN
2025
0
0
240,000
240,000
S
CN
2026
0
0
240,000
240,0E
S
CN
2027
0
0
240,000
240,000
S
CN
2028
0
0
240,000
240, 000
Totals
0
0
1,550,000
1,550,000
Report Date: January 10, 2023 Page 6
Washington State
,.Department s a
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 10,000 10,000 10,000 10,000
CN 250,000 240,000 240,000 240,000 240,000
Totals 300,000 250,000 250,0001 250,000 250,000
Report Date: January 10, 2023 Page 7
�i� tat
Department,of Transportation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P
PE 2023 0 0 100,000
100,000
P
M
1,100, 000
Totals 0 0 1,200,000
1,200,000
o
0
0
-n
A. PIN/Project No. B. STIP ID
D
o
�
rt
c
:3Z
C. Project Title
B
n
D. Road Name or Number
a
a
c
CD
�
E. Termini
°
ou
�
v, as
F. Project Description G. Structure ID
a
rt
o
N
e
4.000
CE
a
No
05
7
WA -12567
11/15/21
11/15121
21 -117 -CC
04
P T
Stratford Road - Phase 2
Stratford Rd
13.24 to 17.24
Stratford Road - Phase 2 94025
2R - Work will include earthwork, drainage, BST surface, traffic control and other
items.
Location: 16 NE Road to 20 NE Road
------------
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P
PE 2023 0 0 100,000
100,000
P
CN 2024 0 0 1,100, 000
1,100, 000
Totals 0 0 1,200,000
1,200,000
Expenditure Schedule
Phase 1 st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
CN 0 1,100,000 0 0 0
Totals 100,000 1,100,000 0 0 0
Report Date: January 10, 2023 Page 8
AdftL
Washington Stere
;Department of Transportation,
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
M
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
PE 2023 0 0 200,000
200,000
P
0
200, 000
o
400,000
0
-n
M.
A. PIN/Project No. B. STIP ID
n
r
c�
o
<
o
CL
C. Project Title
CDi
cQ
,��
Z
c
D. Road Name or Number
=
a
0.2001
EA
I No
��
CrCA
E. Begin & End Termini
-°Q
3
N �'
MD
F. Project Description G. Structure ID
n.
rt
o
07
8
WA -13301
11/15/21
11/15121
21 -117 -CC
11
B -SE Culverts
B SE
.24 to .44
Culvert replacement - Work will include removal of failing existing culvert pipe, 20550
approaches, traffic control, and other items. Location: (.025 miles south of Lower
Crab Creek Road)
Funding
M
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
PE 2023 0 0 200,000
200,000
P
0
200, 000
o
400,000
u
l
`°
n
r
c�
o
CL
CDi
cQ
S
CD
n.
0.2001
EA
I No
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
PE 2023 0 0 200,000
200,000
P
CN 2024 0 0 200,000
200, 000
Totals 0 0 400,000
400,000
Expenditure Schedule
Phase 'Ist 2nd 3rd 4th 5th & 6th
PE 200,000 0 0 0 0
CN 200,000 0 0 0 0
Totals 400,000 0 0 0 0
Report Date: January 10, 2023 Page 9
AW
MkWngtan State
Department of Transportation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside
Six Year Transportation Improvement Program
From 2023 to 2028
Y Outside
B. STIP ID
CD
M
G. Structure ID
tQ
WA -13304111 /15/21
94025
-A.
o'
PIN/Project No.
M
Z
C. Project Title
n 0
D. Road Name or Number
E, 0Cr
E. Begin & End Termini
in R
F. Project Description
05
9
0
Stratford Road Phase 3
3
Stratford Rd
<
C
17.24 to 20.28
M
X
Stratford Road 94025 BMP 17.24 to EMP 20.28
_�
2R - Work will include earthwork, drainage, BST surface, traffic control and other
items.
c
Location 20 NE Rd to BNSF RR Crossing
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
S CN 2023
Totals
Six Year Transportation Improvement Program
From 2023 to 2028
Y Outside
B. STIP ID
CD
M
G. Structure ID
tQ
WA -13304111 /15/21
94025
Federal Funds State Fund Code State Funds Local Funds
0 CRAB 744,000 106,000
0 744,000 106,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 850,000 0 0 0 0
Totals 8503000 0 0 0 0
Total Funds
850,000
850,000
Report Date: January 10, 2023 Page 10
M
0
0
3
N
<
C
�
M
X
D
_�
m
c
a
o
o
CDCD
M
c
CL
0
CD
Cn
<D
Q
11/15/21
21 -117 -CC
04
P T
3.040
CE
No
Federal Funds State Fund Code State Funds Local Funds
0 CRAB 744,000 106,000
0 744,000 106,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 850,000 0 0 0 0
Totals 8503000 0 0 0 0
Total Funds
850,000
850,000
Report Date: January 10, 2023 Page 10
Meir -+n State
Dept srtao
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 0 0 40,000 40,000
P CN 2024 0 0 250,000 250,000
Totals 0 0 290,000 290,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 40,000 0 0 0 0
CN 0 250,000 0 0 0
Totals 40,000 250,000 0 0 j 0
Report Date: January 10, 2023 Page 11
M
0
-
A. PIN/Project No. B. STIP ID
D
o
c�
C
o
M
Z
C. Project Title
3
sv
c
D. Road Name or Number
=
CL
=
M.
0
�.
E. Begin & End Termini
�°
CL
0
r
UCh )
F. Project Description G. Structure ID
a
,���,
o
•
tD
CL
N
=r
0.320
Q
No
07
10
WA -14069
11/15/21
11/15/21
21 -117 -CC
11
23 -NE Rd Br 171 replacement
93048
9.323 to 9.64
23 NE Bridge 171 replacement
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 0 0 40,000 40,000
P CN 2024 0 0 250,000 250,000
Totals 0 0 290,000 290,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 40,000 0 0 0 0
CN 0 250,000 0 0 0
Totals 40,000 250,000 0 0 j 0
Report Date: January 10, 2023 Page 11
Washington tete
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
ending
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 STP (R) 865,000 0 702,126 1, 567,1;
Totals 865,000 0 702,126 1,567,1;
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,567,126 0 0 0 0
Totals 1,567,126 0 0 0 0
Report Date: January 10, 2023 Page 12
.D
M
0
-e
M
0
A. PIN/Project No. B. STIP ID
0
D
0
z
C. Project Title
0rMl
3
CD
0D.
cn
Road Name or Number
=
BD.
°'
O
Cr
E. Begin & End Termini
=
°r
M
3
CA 2
CD
F. Project Description G. Structure IDM
-f
05
11
WA -10861
11/15121
11/15/21
a
21 -117 -CC
04
3 -NE Rd Phase 3
1.990
CE
No
94000
8.91 to 10.9
Work will include earthwork, drainage, HMA surface, traffic control and other items
Location: S NE to U NE
ending
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 STP (R) 865,000 0 702,126 1, 567,1;
Totals 865,000 0 702,126 1,567,1;
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,567,126 0 0 0 0
Totals 1,567,126 0 0 0 0
Report Date: January 10, 2023 Page 12
M
X
M
0
0
0
�
'_'�
rt
0rMl
3
CD
C
cn
to
X
O
nCD
r
0
°
CD
CL
v,
CD
a
21 -117 -CC
04
P T
1.990
CE
No
ending
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 STP (R) 865,000 0 702,126 1, 567,1;
Totals 865,000 0 702,126 1,567,1;
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,567,126 0 0 0 0
Totals 1,567,126 0 0 0 0
Report Date: January 10, 2023 Page 12
Washington state
Department of Us1tto
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S
PE 2023 STP(R) 27,000 0 10,145 37,145
S
CN 2023 STP(R) 1,541,894 0 287,421 1,829,315
M.
Totals 1,568,894 0 297,566 1,866,460
X
-n
MCD
A. PIN/Project No. B. STIP ID
D
y
z
C. Project Title
S
,0�
a
D. Road Name or Number
=
a
CD
N0�
Cr
E. Begin & End Termini
�CD °
3
in "'
F. Project Description G. Structure ID
CD
CD
o
05
12
WA -14077111/15/21
11/15/21
21 -117 -CC
Dodson Rd Overlay Ph 2
91030
21.76 to 27.99
2R Work will include HMA resurfacing and traffic control.
Location 7 NW to Ephrata City Limits.
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S
PE 2023 STP(R) 27,000 0 10,145 37,145
S
CN 2023 STP(R) 1,541,894 0 287,421 1,829,315
Totals 1,568,894 0 297,566 1,866,460
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 37,145 0 0 0 0
CN 1,829,315 0 0 0 0
Totals 1,866,460 0 0 0 0
Report Date: January 10, 2023 Page 13
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 4,113 0 0 0 0
Washivont-
VrAf D'opartment at' Transpodation,
Totals 206,715 0 0 0 0
Six Year Transportation Improvement Program
From 2023 to 2023
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside
Y Outside
rn
=
0
0 0
M.CD
-nA. PIN/Project No.
B. STIP ID
D
o c� c o
z C. Project Title
rt D. Road Name or Number
3
= a
S rt m
= `� r+
N0 �. E. Begin & End Termini
�°
c
in "' F. Project Description
G. Structure ID
CL rt
c N
05 12
WA -14078
=r CML
04 P T 0.690 CE No
Dodson Rd Overlay Ph 3
91030
28.99 to 29.68
2R Work will include HMA resurfacing and traffic control.
Location 13 NW to Ephrata City Limits
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
Federal Funds State Fund Code State Funds
Local Funds Total Funds
S PE 2023 STP (R)
2,990
0
1,123 4,113
S CN 2023 STP(R)
170,771
0
31,831 202,602
Totals
173,761
0
32,954 206,715
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 4,113 0 0 0 0
CN 202,602 0 0 0 0
Totals 206,715 0 0 0 0
Report Date: January 10, 2023 Page 14
Department of Transpodation
Washington State six Year Transportation Improvement Program
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
S PE 2023 STP(R)
S CN 2023 STP(R)
Totals
Federal Funds State Fund Code
13,260
757,335
770,595
State Funds Local Funds
0 4,982
0 141,173
0 146,155
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 18,242 0 0 0 0
CN 898,508 0 0 0 0
Totals 916,750 0 0 0 0
Total Funds
18,242
898,508
916,750
Report Date: January 10, 2023 Page 15
0
-,i
A. PIN/Project No. B. STIP ID
D
o
c
C. Project Title
rt
rt
Z
c
D. Road Name or Number
=
D
a
c
�
3
E. Begin & End Termini
�°
Q.
c
cNn 'v
F. Project Description G. Structure ID
a
c
21 -117 -CC
04
N
P T
05
12
WA -14079
11/15/21
11115121
Dodson Rd Overlay Ph 4
91030
18.70 to 21.76
2R Work will include HMA resurfacing and traffic control.
Location: 4 NW to 7 NW
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
S PE 2023 STP(R)
S CN 2023 STP(R)
Totals
Federal Funds State Fund Code
13,260
757,335
770,595
State Funds Local Funds
0 4,982
0 141,173
0 146,155
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 18,242 0 0 0 0
CN 898,508 0 0 0 0
Totals 916,750 0 0 0 0
Total Funds
18,242
898,508
916,750
Report Date: January 10, 2023 Page 15
AMIRL
Wamhingtan State
Department Translation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
.a
-v
rn
O
<o
CD
rt
o'
3
�D
r -
CD
rt
c
A. PIN/Project No. B. STIP ID
D
o
Z
C. Project Title
CD
S
M
0
=
D. Road Name or Number
=
D
a
CE
M
Na.
E. Begin & End Termini
0 "'
F. Project Description G. Structure ID
cc
Q.
rt
o
04
13
WA -12569
11/15/21
11/15/21
21 -117 -CC
Valley Road Overlay / Sidewalk
Valley Rd
1.53 to 2.11
2R Overlay - Work will include HMA surfacing, ADA ramps, new curb & sidewalk, 41250
traffic control and other items. Location: Scott Rd to South of H -NE Rd
.a
rn
O
<o
CD
rt
O.
3
�D
r -
CD
rt
;U
CD
n
a
c
co
�
CD
04
1 P T
0.5801
CE
I No
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2024 0 0 50,000 50,000
S CN 2024 STP(US) 389,250 0 60,750 450,000
Totals 389,250 0 110,750 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 50,000 0 0 0
CN 0 .450, 000 0 0 0
Totals 0 500,000 0 0 0
Report Date: January 10, 2023 Page 16
AdMIL
hil"1 an
VW V*;wrlment oFftnspoirtation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
S PE 2026
S CN 2026
Totals
Federal Funds State Fund Code
0 CRAB
0 CRAB
0
04 1 PT
State Funds Local Funds
166,500 18,500
1,498,500 166,500
1,665,000 185,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 185,000 0
CN 0 0 0 1,665,000 0
Totals 0 0 0 1,850,000 0
M
0
a� c�
0 �
r m CD
c
? CD a
4.670 CE I No
Total Funds
185,000
1,665,000
1,850,000
Report Date: January 10, 2023 Page 17
-v
o'
-e
<
A. PIN/Project No. B. STIP ID
c
C. Project Title
n 0
D. Road Name or Number
Q
:
Cr
E. Begin & End Termini
�°
3
M
v, '�
F. Project Description G. Structure ID
a
�.
c
05
15
WA -14072
11/15/21
11/15/21
21 -117 -CC
H SE
92005
0.00 to 4.67
Reconstruction- work will include earthwork, drainage, BST surface, traffic control
and other items.
Location 12 SE to SR 262
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
S PE 2026
S CN 2026
Totals
Federal Funds State Fund Code
0 CRAB
0 CRAB
0
04 1 PT
State Funds Local Funds
166,500 18,500
1,498,500 166,500
1,665,000 185,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 185,000 0
CN 0 0 0 1,665,000 0
Totals 0 0 0 1,850,000 0
M
0
a� c�
0 �
r m CD
c
? CD a
4.670 CE I No
Total Funds
185,000
1,665,000
1,850,000
Report Date: January 10, 2023 Page 17
Washington State
Department of Trmsportation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2024 HIP(US) 126,178
0 0 126,178
S
M
0 216,000 1,600,000
v
0 216,000 1,726,178
�
oo
o
-e
A. PIN/Project No. B. STIP ID
D
o
CD
rt
o
S
z
C. Project Title
a
3
a�
C
D. Road Name or Number
a
a
m
`D
n
M
Cr
E. Begin & End Termini
'�'
'a
9
o
�
-1
o
CD
W,
fD
F. Project Description G. Structure ID
a
o
N
M.
a
CL
05
2.120
a
CE
No
16
/6069(001) WA -14073
11/15/21.
11/15/21
21 -117 -CC
04
P T
Westshore Drive Overlay / Sidewalk
40950
0.83 to 2.95
2R Work will include HMA surfacing, new ADA ramps & sidewalk, traffic control and
other items.
Location: Fairway Drive to 0.25 S. of 4 NE
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2024 HIP(US) 126,178
0 0 126,178
S
CN 2024 STP(US) 1,384,000
0 216,000 1,600,000
Totals 1,510,178
0 216,000 1,726,178
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 126,178 0 0 0
CN 0 1,600,000 0 0 0
Totals 0 1,726,178 0 0 0
Report Date: January 10, 2023 Page 18
:,&
War*hington State
Department of Transportation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
P PE 2025
P CN 2025
Totals
Federal Funds State Fund Code
0 CRAB
0 CRAB
0
State Funds Local Funds
144,000 16,000
1,296,000 144,000
1,440,000 160,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 160,000 0 0
CN 0 0 1,440,000 0 0
Totals 0 0 1,600,000 0 0
Total Funds
160,000
1,440,000
1,600,000
Report Date: January 10, 2023 Page 19
M
0.
0
;U
0
0
-n
A. PIN/Project No.B. STIP ID
CD
o
fD
rt
o
3
. ,
Z
C. Project Title
D. Road Name or Number
=
D
a.
a
�
=
�
�_
�
`�
r-1.
�
r*
a.
E. Begin End Termini
10aCA rt
3
,q
o
u,
F. Project Description G. Structure ID
Q
a
05
rt
o
21 -117 -CC
03
CL
�
P T
5.820
C E
a
No
17
WA -14074
11/15/21
11/15/21
Q SW(George to Frenchman Hills)
91035
0.82 to 5.82
3R Work will include earthwork, drainage, BST surface, traffic control and other
items.
Location: George City Limits to Frenchman Hills Rd
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
P PE 2025
P CN 2025
Totals
Federal Funds State Fund Code
0 CRAB
0 CRAB
0
State Funds Local Funds
144,000 16,000
1,296,000 144,000
1,440,000 160,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 160,000 0 0
CN 0 0 1,440,000 0 0
Totals 0 0 1,600,000 0 0
Total Funds
160,000
1,440,000
1,600,000
Report Date: January 10, 2023 Page 19
AdW
Washington State
Department of Tiansportation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P
PE 2025 N H P P 60,000 0 15,000 75,000
P
CN 2025 NHPP 640,000 0 160,000 800,000
Totals 700,000 0 175,000 875,000
M
v
�
o'
0
0
-n
A. PIN/Project No. B. STIP ID
D
c
C
o
Z
C. Project Title
S
,y
�,
0
n 0
=
D. Road Name or Number
CD
a
=
`�
�*
a.
E. Begin & End Termini
Z
2
o
CD
F. Project Description G. Structure ID
a,
CD
o
Z
0
0.010
CE
a
No
06
18
WA -14075
11/15/21
11/15/21
21 -117 -CC
11
P T
Bridge 382 H NW Rd
30430
2.28 to 2.29
Bridge replacement- Work will include demolition, structure replacement,
approaches, traffic control and other items.
Location: .4 miles north of SR 28
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P
PE 2025 N H P P 60,000 0 15,000 75,000
P
CN 2025 NHPP 640,000 0 160,000 800,000
Totals 700,000 0 175,000 875,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 75,000 0 0
CN 0 0 800,000 0 0
Totals 0 0 8751000 0 0
Report Date: January 10, 2023 Page 20
AdVhL
Washington Stade
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 0 5,000 5,000
P CN 2027 0 0 95,000 95,000
Totals 0 0 100,000 100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 5,000
CN 0 0 0 0 95,000
Totals 0 0 0 0 100,000
Report Date: January 10, 2023 Page 21
M
o'c
oM.'
A. PIN/Project No. B. STIP ID
D
o
c�
o
n =
Z
C. Project Title
D. Road Name or Number
D
a
=
`<
0
CD
�.
E. Begin End Termini
�
o
CACh
CDF.
Project Description G. Structure ID
a
rt
o
11
CL
N
P T
=
0.010
�
nm.
No
07
19
WA -14076
11115/21
11/15/21
21 -117 -CC
Bridge 353 R NW
30330
.01 to .02
Bridge replacement - Work will include demolition, structure replacement,
approaches, traffic control and other items.
Location R NW and Martin Rd
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 0 5,000 5,000
P CN 2027 0 0 95,000 95,000
Totals 0 0 100,000 100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 5,000
CN 0 0 0 0 95,000
Totals 0 0 0 0 100,000
Report Date: January 10, 2023 Page 21
r
Wash i�h Eltantat-e
Department a' sat
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 0 0 10,000 10,000
P CN 2023 0 0 50,000 50,000
Totals 0 0 603000 60,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 10,000 0 0
CN 0 0 50,000 0 0
Totals 0 0 60,000 0 0
Report Date: January 10, 2023 Page 22
_
M
M
3
�
C
X
�
O
O.
-
A. PIN/Project No. B. STIP ID
CD
o
<
C
o
M
M
C. Project Title
3
�
�
�„
�
�
c7 0
c
D. Road Name or Number
a
a
o
r
A)
Cr
E. Begin & End Termini
�'
-a
—�
o
N
F. Project Description G. Structure ID
Q,
o
CL
Q
05
20
WA -14082
11/15/21
11/15/21
21 -117 -CC
47
P T
0.070
CE
No
Stratford Bridge 110
94026
0.208 to 0.278
Work includes excavation to spring line of the pipes, CDF fill; one lift HMA, traffic
control and other items.
Location: 22.7 NE to 23 NE
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 0 0 10,000 10,000
P CN 2023 0 0 50,000 50,000
Totals 0 0 603000 60,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 10,000 0 0
CN 0 0 50,000 0 0
Totals 0 0 60,000 0 0
Report Date: January 10, 2023 Page 22
Washington State
Department of'Transpartation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Phase
1st 2nd 3rd 4th 5th & 6th
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds
Total Funds
P
PE 2025 0
M
375,000
P
RW 2025 0
0 50,000
50,000
P
CN 2026 0
0 2,075,000
2,075, 000
Totals 0
0 2,500,000
2,500,000
o
;U
0
0
A. PIN/Project No. B. STIP ID
D
o
c
oB
Z
C. Project Title
3
rt
ai
M
n 0
D. Road Name or Number
=
`�
r
�-*
Cr
E. Termini
o
o
C
ai 2
F. Project Description G. Structure ID
Q
rt
o
N
P T
�
0.010
a
CE
Q
Yes
05
21
WA -14081
11/15/21
11/15/21
21 -117 -CC
21
Dodson Road - Road 12 SW Intersection Improvements
91030
2.235 to 2.245
Install a roundabout at the intersection of Dodson and 12 SW. Work includes earth
work, curb installation, traffic control devices, and other items.
Funding
Phase
1st 2nd 3rd 4th 5th & 6th
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds
Total Funds
P
PE 2025 0
0 375,000
375,000
P
RW 2025 0
0 50,000
50,000
P
CN 2026 0
0 2,075,000
2,075, 000
Totals 0
0 2,500,000
2,500,000
Expenditure Schedule
Phase
1st 2nd 3rd 4th 5th & 6th
PE
0 0 375,000 0 0
RW
0 0 50,000 0 0
CN
0 0 0 2,075,000 0
Totals
0 0 425,000 2,075,000 0
Report Date: January 10, 2023 Page 23
VrAf Washington tate Six Year Transportation Improvement Program
Dpartof sat
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
M
v �
o 0 0
cn c ...�
,n A. PIN/Project No. B. STIP ID D
o
Z C. Project Title rt e
n CD CD
rt D. Road Name or Number a �, c rt `� r s CD
3 0. E. Begin & End Termini M � c �
v, 'v F. Project Description G. Structure ID a �. o y CD a
07 22 WA -14084 11/15/21 11/15/21 21 -117 -CC 03 P T 1.060 CE No
K.7 NE 7 NE to 8 NE
43070
0.0 to 1.06
Work includes earthwork, BST, traffic control, and other items.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 0 0 15,000 15, OOC
P CN 2026 0 0 100,000 100,00C
Totals 0 0 1157000 115,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 15,000 0 0
CN 0 0 0 100,000 0
Totals 0 0 15,000 100,000 0
Report Date: January 10, 2023 Page 24
Washington Stato
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds
Local Funds Total Funds
P
PE 2024 0 CRAB 108,000
12,000 120,000
P
M
149,500 1,495,00O
o
161,500 1,615,000
�
o
0
0
-e
A. PIN/Project No. B. STIP ID
D
CD
c
�
rt
o
Z
C. Project Title
3
�,;
ai
n o
D. Road Name or Number
o
a
o
n
r
a)
U 0
a.
E. Begin & End Termini
-a
S
o
.�
-0
0 's'
�
F. Project Description G. Structure ID
�
CD
tD,
o
CD
a
06
23
WA -14924
10
3.000
No
S -NW Br 355
31550
0.990 to 3.990
S -NW BST surface, replace bridge 355 with pre -fab concrete bridge; finished width
34ft.
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds
Local Funds Total Funds
P
PE 2024 0 CRAB 108,000
12,000 120,000
P
CN 2024 0 CRAB 1,345,500
149,500 1,495,00O
Totals 0 1,453,500
161,500 1,615,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 120,000 0 0 0
CN 0 1,495,000 0 0 0
Totals 0 1,615,000 0 0 0
Report Date: January 10, 2023 Page 25
VWashington Stere
,Department of TranWrtation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase
M
Federal Funds
State Fund Code
v
Local Funds
Total Funds
P
PE
2023
.a
0
250,000
250,07
P
o'0
2024
0
OTHER
800,000
0
800,000
P
CN
0
0
-e
800,000
A. PIN/Project No. B. STIP ID
800,000
P
D
o
M
rt
o_
0
5,300,07
Z
C. Project Title
0
6,900,000
250,000
S
CD
0
=
D. Road Name or Number
=
CL
CD
�
0
S
E. Begin & End Termini
o
o
CL
o
n
o
M
-I
=
v,M.
RL
CD
F. Project Description G. Structure ID
�
a
c
M
N
a
07
24
01
7.100
No
Hiawatha Truck Route
40555
4.63 to 12.54
Drumheller Road upgrade from primitive to truck route, BST surface from Hiawatha
Road to a new round -about at SRI SR282 junction.
Funding
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
0
0
250,000
250,07
P
CN
2024
0
OTHER
800,000
0
800,000
P
CN
2025
0
OTHER
800,000
0
800,000
P
CN
2026
0
OTHER
5,300,000
0
5,300,07
Totals
0
6,900,000
250,000
7,150,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 250,000 0 0 0 0
CN 0 800,000 800,000 5,300,000 0
Totals 250,000 800,000 800,000 5,300,000 0
Report Date: January 10, 2023 Page 26
ninon StUte
Department of Transpvrtatibn
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2023 0 0 400,000 400,000
Totals 0 0 400,000 400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 400,000 0 0 0 0
Totals 400,000 0 0 0 0
Report Date: January 10, 2023 Page 27
rn
O
O
O.
=
A. PIN/Project No. B. STIP ID
z
C. Project Title
D
rt
C
m
rt
n =
c
D. Road Name or Number
=
CD
a
Q.
o•
SM
CD
E. Begin & End Termini
�°
3
-�
oCD
M,
F. Project Description G. Structure ID
Q,
,��*
o
N
a.
07
25
WA -14986
04
1.570
No
Gravel to OII 12 NE and 8 NE
94030/94020
8.24/1.18 to 9.01/1.98
.77 miles of 12 NE and .8 miles of 8 NE Gravel to Oil, BST surface
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2023 0 0 400,000 400,000
Totals 0 0 400,000 400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 400,000 0 0 0 0
Totals 400,000 0 0 0 0
Report Date: January 10, 2023 Page 27
frMkinon state
o Department o l�ansportaf dI-
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2024 BR 870,000
0 0 870,000
P
rn
0 0 3,560,000
Totals 4,430,000
0 0 4,430,000
o
X
0
0
-
A. PIN/Project No. B. STIP ID
D
c
C
o
Z
C. Project Title
S
a�
C
o
D. Road Name or Number
o
Q,
rt
n
n
Cr
E. Begin & End Termini
cin
'�
o
M
...�
o
rCD
cD
E.M
u >v
F. Project Description G. Structure ID
a
rt
o
�
N
CL
07
26
WA -14987
10
0.020
No
Bridge 247 W SE
26530
1.98 to 2.0
Replace bridge 247; has been of special concern to the Bureau of Reclamation with
expanded canal capacity.
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2024 BR 870,000
0 0 870,000
P
CN 2025 BR 3,560,000
0 0 3,560,000
Totals 4,430,000
0 0 4,430,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 870,000 0 0 0
CN 0 0 3,560,000 0 0
Totals 0 870,000 3,560,000 0 0
Report Date: January 10, 2023 Page 28
a
Washington State
Department of Translation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2025 B R 980,000
0 0 980,000
P
M
0 0 4,025,000
v
OT 0 5,005,000
<
o0
-�
A. PIN/Project No. B. STIP ID
D
o
m
o
C. Project Title
3
3
rt
as
C
0
z
c
D. Road Name or Number
a
a
c
`<
mCD
n
�,
a.
E. Begin S: End Termini
�'
-°a
a
—i
o
r
M
U)
F. Project Description G. Structure ID
to
Q,
rt
c
CL
ycc
CD
n.
07
27
WA -14988
11
0.010
No
Bridge 248 11 SE west of U SE
24500
4.21 to 4.22
Replace Bridge 248, Rd 11 SE
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2025 B R 980,000
0 0 980,000
P
C N 2026 B R 4,025,000
0 0 4,025,000
Totals 5,005,000
OT 0 5,005,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 980,000 0 0
CN 0 0 01 4,025,000 0
Totals 0 0 980,000 4,025,000 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Grant Co. 17,666,0031 1 14,094,900 9,985,476 41,746,379
Report Date: January 10, 2023 Page 29
Bridge Number: 247
Owner: Grant County
Bridge Name: W SE @ East Low Canal
Route Carried: W SE Road
Year Built: 1951
Average Daily Traffic (ADT) = 15
Existing Bridge Size and Configuration
• 87 -ft long x 24 -ft wide bridge
• Structure Depth = 24 -inches
• Gravel roadway
• 3 -Spans of timber girders supported by
concrete spread footing abutments and
concrete piers.
PROPOSED SIZE AND CONSTRUCTION TYPE
WOWS KOVICh
t sneering PttO
Photo 1: Bridge 247 Elevation
Geotechnical Data Summary
• Estimated depth to basalt rock = 20 below ground surface.
• Driven piles feasible if lateral fixity can be achieved. Pre -drilling may be an option using air rotary
methods to drive and socket the piles into basalt.
Photo 2: 247 Aerial Image (Google Earth)
Special Features to Consider during Design
1. Horizontal alignment of roadway would require a
deviation in design speed (lowered to 20 mph).
2. Property at southwest corner of bridge would
preclude adjustment of Operating and
Maintenance (0&M) Road for guardrail
placement.
Grant County Bridges -- Odessa Groundwater Replacement Program 247-1
OGWRP-COUNTY BRIDGES SUMMARY OF ESTIMATED QUANTITIES W SE ROAD
BRIDGE 247 - 38'x 141' GRANT COUNTY
Item STD i
;
#
-- -- ----------------------- ------------------ --- ---- ----- ---
' # ;DESCRIPTION
'PREPARATION
-- - -- - -
;QUANT
---: -- --------=----------------------------:--------------------------------
;UNITS
;UNIT PR
:EXTENDED
1
0001 ;MOBILIZATION
1
;L.S.
275,66646'"1
$
275,000.00
2
0071 :REMOVING EXISTING BRIDGE
1
;L.S.
$
76,200.00 $
76,200.00
GRADING-
---------------------
------
3 : 0310 ;ROADWAY EXCAVATION INCL. HAUL
------------; ------------ --- --------------- -- -- -- ---- --- --------------------------------------------------------
: 353
C.
: $
45.00:
$
15 885.00
4
...-- ------------------;
0405 :COMMON BORROW INCL. HAUL842
------------------"-----...-----------------------------------""-----------•-----------"--:-"•-----------"--:--=---=--------=---------------45.00
----
-;- -- --
�C Y
- •---
--------- ------ --
, -----------
5
0470 ;EMBANKMENT COMPACTION
20.00
---•------...37,890.00--
; $
16,840.00
DRAINAGE
6
1040 :CHANNEL EXCAVATION INCL. HAUL
'
---"-----•-•-----
3100
; C.Y.
C.Y.
i
45.60 ""'----
$ 139,500.00
7
1085 ;QUARRY SPALLS
------76------;---------------,-
C.Y.
-
; $
------------------------,
90.00
--------------------------------
; $
6,840.00
-----....-
STORM SEWER
-3091'
;
---------------
_ _
:CATCH BASIN -TYPE 1------------------------------------------•--•-----.--
------------------------------------------------------------------------------------------------------:-
----- --.•-
--,-- -2-
-;-----------
EAC
:--
----•.-------------------------•--r-$---•-----------------
3,700.00
-
7,400.00
9
3541 ;SCHEDULE A STORM SEWER PIPE 12 IN. DIAM.
---- - - ----
80
- --H-
L. F.
---- --$
---- ---
150.00
_; ._
; $
___ ___
12,000.00
STRUCTURE
1
-10
-= - --- -----•-- ----- - ---- -- - ----- -- ----------------------------------------------------
4001 ;TEMPORARY BRIDGE
------- ---------=
0
---------------
: L.S.
----
; $
--------- ---- ----
-
--:-------------------------------
:$
11
: 4006 :STRUCTURAL EXCAVATION CLASS A INCL. HAUL
145
C.Y.
: $
120.00_
$
17 400.00
12
-- ------
: 4013 ;SHORING OR EXTRA EXCAVATION CL. A
-- ---- -- -- • ----------- -- - -- - - ---- ---------------- --- --- ---
1
:L.S.
5,000.00
$__
5000.00
-- - ---------------------------=--
13 : 4063 :PREBORING FORST. PILE
;
: 450
-------------:-
L.F.
-
: $
----------------- -_�
160.00
$ -------------
___ __
14 4085 ;FURNISHING AND DRIVING STEEL TEST PILE
-----------------
------------- ---- - --------- --- ---- -- - -- --- - - --------------- --- --- ---- - ----
-- 2
;EACH
: $
34_,_000.00 ; $
68,000.00
15
------------
: 4090 FURNISHING ST. PILE
.1 ............. 4.._
-------------------"-----------•-------"------------------"------------------------------
---•-------------•----
336
---------=---------
:L.F.
$
-
•
150 00
---
------------
; $
----------------
"
50, 400.00
16
4095 :DRIVING ST. PILE
-----.......................................................................................
16
_
"""'" '"
EACH
•"� _ _
$
_
"-""' 9,000.00
_ _ --------
$
-144 000.00
174025 GRAVEL BACKFILL FOR WALL
-- -- -----• -- ---- = -- --- - - - -- ------ ------------------------ ------
79
------•
C.Y.
-------------'----�----------------'
$
9-O--.-O-,6--r:-$-
----------
7 110.00
18
--------------•-----------------',
: 4149 :ST.REINF. BAR FOR BRIDGE
-----------------------•---------------------------------•----------......----•----------------•--•---.----•--------------------•--'
8565
•""" """"-"""'--"
: LB.
- ---
"-"- -- �" - --3.-
- ----------
29,977.50
19
---- ----
4300 :SUPERSTRUCTURE
-- --- ---- - • -- -- - -- - --- -- ----------- ------------------- ---- - --- - -- --- --
1 : L.S.
-----,------------
.............................................................
1,408,438.00-_;
' $
1,408,438.00
20----------------------_
4322 :CONC. CLASS 4000 FOR BRIDGE
....---------
54
------._.._
:C.Y.
$
1,600.00:
$
86,400.00
21
--
`OREGON 2 -TUBE BRIDGE RAILING
- -------------------------------------------------------------
: 282
------- ---- -- ------
:L.F.
------------
: $
410.00
$
115 620.00
SURFACING
;----------------------------;
----
------ --- --- ----- --
--•-22--
- _ 5100 ;CRUSHED SURFACING BASE COURSE
:TON-
50.00
$-_"-
33,95000
23
_ -"---- --" "-"--
5120 ;CRUSHED SURFACING TOP COURSE
-- -"_--679- "_-
750
--"-
;TON
_ _$"-
-----_"_ _
-- ---
HOT MIX ASPHALT
-rFiIVIA'CL:
,
---24
--------------
__ _ _57671/2•IN. PG -64-28'-----------••----• ............."-------•-------•-
1 _ .y.________________________________________________________________________________
.................
.................--
------.....250.UU
-..-------•---------....._----
_
EROSION CONTROL AND PLANTING-"'---'-"-----'---"--
EROSION
__ __,__....._._____..___....__.._...___,--------------------------
______.
_. _....__..___.____.1
--------------------------------
-'--"- -
25 6373 :SILT FENCE
--- ------•-------------------- -- -- - ---- - -------------------------------------------------------------
1240
L.F.--------
$
8.00
$
2
26
----•-•------
: 6403 :ESC LEAD
'
-----•-------y-------------•"--------.......---"---------------------------------------------------------------------------------•-----......------•----•---•--------.--�
•---------------•
-'
25
-- - ----
:DAY
- = ------------------------
' $
150.00
------------
'
' $
3,750.00
TRAFFIC
------------"---------•------
27
-- --
825
6727 :EXTRUDED CURB 96 ;L.F.
---•----------- - --------------------- ---- - -- -------------------------------------------------'
6757 '--"---"-----' "-"""""'""
:$
"-- ---------------------------
60.00
, $
5,760.00----
-------------1.....---•-•--'
BEAM GUARDRAIL TYPE 31
--------------------------------------------------;
L.F.
$
100.00
..-----------
$..............2,500:00.
-- -_29
30
6759 :BEAM GUARDRAIL TYPE 10
--- - --- -, -- --------------- --- --- --- ---- - ---- ----- -- ---- - ---------------
6760 :BEAM
-----------...---.----------------•-----------------------...._�
28
-------- - --=-
: L.F.
-- -- --
;$
----- --
120.00
--- -----------
'$-
,
3 360.00
,
___
GUARDRAIL TRANSITION SECTION TYPE 21
'
' 2
: EACH
: $
--
6,500.00
r--- _
:$
__ __ -----------------
13,000.00
31
6766 ;BEAM GUARDRAIL ANCHOR TYPE 10
: 4
:EACH
$
2,000.00:
$
8,000.00
-- -
---32 --6806 ;PAINT LINE (PAVED ROADS)---- ------ - --- -- -- - -- --
-- - ------ Q - - -
F' -- --
L-----------------------------
---: $
3.00
$
_
33
6971 ;PROJECT TEMPORARY TRAFFIC CONTROL
1
L.S.
L S
:"-"--
.____._..._r.$
-3--"-
35,000.00
_
----.._-_
'
..__...___
35,000.00
OTHERITEMS
-----------------------------------•-
34 : 7018 :,WATER
---35----;- -7037 -:STRUCTURE
200
: mG_al
20.00
----------;
SURVEYING----------------------------•--................-
---- --- -� --------- -- ------ -- ----- -- -------------------- ----- -- ---- ----------
_ -,•--••---� --"--
_ ;- •----.....-$
LS
' ..
•--
$
-•------...............................4,000.00
-
$,000:00-;
-
36
7038 ROADWAY SURVEYING
------------------------------
L.S.
-------------------------------------------------------oo.00-
$
81000.00
; $
81000.00
37 7490 ;TRIMMING AND CLEANUP
-------------;---""--------...-----"----------"------------•--..........--------------------•--------••--------•---•--=•---•"--•
: 1
:L.S.
. $
6,000.00:
$
6,000.00
38
-- ----;
7736 SPCC PLAN..--••--•,---------"--........--•"--------"---"--------�
----- -- -- �- -- -- - - -- - --- --- -------------------------------- ---- ------ ----------- 1
L.S.
: $
2,000.00
---•--•----
00.00
39$
;UTILITY WORK
------------------'---------------
: 1
L.S.'-----"--$------
_
--3,000.00
_2,0
- 3,000.00
'
------------------------
,
'
Construction Cost ; $
2,775,640.50
---------------------------
---- - ---- ------ --- - - -- ----------------------------------------------
'
CONSTR. ; 10%
-- -
:
- ---------------------------•--------------------------------
Contingency
g Y
, $
277,565.00
'
Total Construction ;
' $ 3,053,205.50
ENGR.
15%
Preliminary Eng. ; $
416,347.00
14%
; Construction Eng.: $
388,590.00
---------------------------
------------------------------------------------------------------------------------------
'
TOTALS
2023 TOTAL
$
3,858,142.50
'
'
2024 TOTAL
$
41166,794.00
............................
Inflation
Inflation
8%
2025 TOTAL
$
4,860,149.00
'
TOTAL COST PERS FT.
Q
$
721.00
-.•--..
----- -----
SUPERSTRUCTURE
;
,
-- -- -- PRESTRESSED CONCRETE b ------------------------------
-----1-1-- - ----
L.F.----------
-$-
-------1,120.00
-$
--1,243,200.00
' CONC. CLASS 4000 FOR BRIDGE
............. -------------------"---...---------•------
: 41
;
. $
1,800.00
73,800.00
-------------
' ST.REINF. AND EPDXY BAR FOR BRIDGE
----------------------------------------------------------------------------------------------------•--.----------------
10518
; LB.
'
---------------
3.50 ; $ 36,813.00
KEYWAY GROUT
: 972
- ------
: L. F.
-$ -
--- -------25.OU
; $ -
--
PRESTRESSED GIRDER WELD TIES
196
:EACH
; $
40.00
$
7,840.00
NOSINGANGLE
' __
-------------- -""_ • ""- - - -- --- -"-
----------------;----------------•-------------------------
-"--;--- 76
;L.F.
: $
----------------------------------
15.60_;
$ 1,140.00
LAMINATED ELASTOMERIC BEARING PADS
---1-6 - "-;EACH
"""-•
-$ --
----•" 1,100,00
$ -"---"
-17,600.00
-------------------------------
BUTYL RUBBER STRIP
------ -- - -- - ---- -- - - - - -------...--------- ---
: 79
:L.F.
$
15.00
' $
------
1 185 00
-- ---
GIRDER STOP PADS
------------- ;-----------------------"-------------------------•---------------------------•-----.....----------
_---
1
------ -----
32
•....---•---•--•--•----------------..--•-•-•-•-----••----...---
---------•-------------------------
; EACH
$
-
80.00
=-----------
; $
------------------------.--
-- -'----=--- -
2,560.00 ..
--------
__"_"_-.__"_"____-_-_____"
1
------------------- -- ------ ------------ I -------------- ------
Total Superstructure : $ 1,408,438.00
,
NICHOLLS KOVICH ENGINEERING, PLLC 247-2
Bridge Number: 248
Owner: Grant County
Bridge Name: 11 SE @ East Low Canal
Route Carried: 11 SE Road
Year Built: 1952
Average Daily Traffic (ADT) = 20
Existing Bridge Size and Configuration
• 80 -ft long x 25 -ft wide bridge
• Structure Depth = 24 -inches
• Gravel roadway
• 3 -Spans of timber girders supported by
concrete spread footing abutments and
concrete piers.
PROPOSED SIZE AND CONSTRUCTION TYPE
s WOWS KOVICh
meet c
Photo 1: Bridge 248 Elevation
Geotechnical Data Summary
• Estimated depth to basalt rock = 15 ft below ground surface.
• Driven piles feasible if lateral fixity can be achieved. Pre -drilling may be an option using air rotary
methods to drive and socket the piles into basalt.
Photo 2: Aerial View of 248 (Google Earth)
Special Features to Consider during Design
1. No detour available. Roadway dead ends at
private property. Assume temporary
bridge/temporary easement is necessary.
2. Utilities on north side - 12" water line and 2"
telephone.
3. Pump station and pit at northwest corner.
Grant County Bridges — Odessa Groundwater Replacement Program 248-1
OGWRP-COUNTY BRIDGES SUMMARY OF ESTIMATED QUANTITIES 11SEROAD
BRIDGE 248 - 38'x 132' GRANT COUNTY
Item .........
STD ....................... .........................................................................
..............................
.............................
..................................
--------
...... -----------------------------------------------------------------------
.... PREPARATION
-------------------------------------------------------------------
:.QUANT
UNITS
:,UNIT
PR
---------------
---.....
...... ----------
....... -------------------------------------------------------------------
-------------------------------- ---------------
...................................
1
-2 -------
L.S.
------------------------
2852-0-00-.00
----------------------------------
$
285,000.00
.............................
0071 REMOVING EXISTING BRIDGE
.............................................................................................
----------
1
......................................................
-----------------
L.S.
- $
-------- 70 OOO.Ob
-------------------------------------
'- $
70,000.00
....................•---------------------------------------------------------------------------------
GRADING
...........
..................................
....... -----------------
0310 :ROADWAY EXCAVATION INCL. HAUL ----------------
i ------------------------------------------------------------------------------------------------
------------------------------------
- 565
C.Y.
-------------------------------
:$
45.00
-----------------------------------
: $
25,425.00
--------------...............
1
0405 :COMMON BORROW INCL. HAUL
I ................................................................................................
"EMBANKMENT
_r ------------------
1566
----___
------------------
C.Y.
-----------------------------------------------------------------
$
45.00
$
70,470.00
------------------
0470 .... : ------ COMPACTION
---------------------------------------------------------------------------------------------------------------------
1566 .......
............
F �
-------
-------
------66
--------------
DRAINAGE
----------
----------------
j ----------------------
2 ------
-------- 7 -----------
..... ib�b .... ------------- -------_--------__-
1-b-8- --- L ------------------------------------------------------------------
L ....................................
2980
----- ------------------------------------
C.Y.
...............................
i $
: -----------------------------------------------------------------
45.00
.................................
:. $
134,100.00
SPALLS
69
C.Y.
$
90.00
$
6,210.00
STORM SEWER
8 ......
... 3�dg ..... ................................................................................................
1 :CATCH BASIN TYPE 1
---- ---
..............................
2
EACH
...........................
...... $
3,700.06_"'-•------------------------------
9
.............
3.541 :SCHEDULE A STORM SEWER PIPE 12 IN. DIAM.
.... ....... ................................................ .......... ..............................
80
...............................
L.F.
$
150.00
$
,
-2, 0-0 0. 0 0
-----------
L STRUi�fbi�ff
.............................................
0-
-----
;TEMPORARY - - --------------------------------------
--- 4-0-0-1- ---- :.TEMPORARY BRIDGE
--------------------------
1
L.S. --------
---------
2
:1 ------------
------- -
:�6� 0 13.2
y
466C.,,".�TRUCTURAL EXCAVATION CLASS A INCL. HAUL
-------------------------------
137
C.Y.
120.00
-----------
---
16,440.00
12
_40'13,'-SHORING
OR EXTRA EXCAVATION CL. A
J 1
L.S.
$
5,000.OV..
$
5,000.00
1 ---------
REBORING FOR ST. PILE
----- -72
------------------
- 456
r ------------------
----------------
------------------------------------------------
------------------------------
160.00
$
--------
000.00
o ------------"66d.
..............
................................. ................................................ ....................
:.FURNISHING
2
---- 0 ......................
EACH
$
34,000.00
$
68 -b-6-
15 ---------
4090 ... ST. PILE
----------------------------------------------------------- 0 -------------------------------------------------------------
343
L.F .
........ ------------
...........................
0
$
2 .......
51,450.00
16
469� :DRIVING ST. PILE
J 16
0 -------
EACH
-------
:$
------------1-400-6.00
...... 17 ................
4025 :GRAVEL BACKFILL FOR WALL
0 .......... m ................. 0 ................................................ 0 ......................
',ST.REINF.
79
C.Y.
$
90.0 0-;
$
7,110.00
i.��
------------------
4149 I BAR FOR BRIDGE
----- ------------------------------- m -------------------- 0 ------------------------------------------- ---------
--------
:
....
------------..................................
3.50
$
29 977.50
1
.............
i� 00 :SUPERSTRUCTURE
o ............. ...............................................................................................
I -----------------------
1
................................
....
L.S. ............
:
----- fib� ---- 0 --------
1 587.00j"$
•-------------
-------- 1 ------------
1,162,587.00
20
------ - --------------
4322 :CONC. CLASS 4000 FOR BRIDGE
-------------------------------------------------------------------------------------------------54
r------------------
C.Y.
- -
.............................
: $
1,600.00
. ----------------------------------
$
86,400.00
21
.............................
:OREGON 2 -TUBE BRIDGE RAILING
.............................................................. 0 ...... 0 ...........................
264
L.F. -----------
-----------
$
0 ------------------
410.00
----------------------------------
$
108,240.00
SURFACING
.1 ---------------
* -----------
..
....................................................................
22 .........
5100 CRUSHED SURFACING BASE COURSE
................................. 0 ............................. 0 ................ ..............
1109 ---TON
:$
50.00
$
-
--------------
............
:.CRUSHED SURFACING TOP COURSE ........
1225
--------------- --------------------------------------------- m ------------------ 0 ----------------- 0 -------------- I ------ --------
fb Kf .....$
.....-----------------------------=-----------------55,450:00
50.0
61 250.00
HOT MIX ASPHALT
11
----------
-----------
-----------------
---,---------------------'------------
1
24
...............--•---------
5767 :,HMA CL. 1/2 IN. PG -------------------------------------------------------
.. ............... 0 ................... 0 ................................... m ............
...------------------
0
-----------------
TON
---------------------------
250.0 0
----------------------
:
0----'
-----------
m .............
........ EROSION CONTROL AND PLANTING
e ..................
................
. . . .
. . .
. . . . . . . . . . . . . 0 . . . . . . . -----;---------------------------------
. . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . .
25
5
...........
-----------------------------------------------------------------------------
...................... ------------- 0 .........................
------------------
1880
..................
----------------
L.F.
----------------------------J-----------------------
26
.............................
...................................................................................... 0 ..........
25
L ..................
......................
DAY
$
0 ................... --------------__-- 2 ......
6b]
150. $ 3,750.00
-------------------
TRAFFIC
-------------------------------------------------------------------------------------------------
.............
...
....................
..................................
27
..--•-------•-...............
6727 EXTRUDED CURB
'
L .................................. I ................................... ................... 0 ......
:.BEAM
------- 0_�6 --------
----------
-----------------
1 $
---------•--------------------------------
0.00
$
--
5,760.00
28 --------
6757 GUARDRAIL TYPE 31
--- ---------------- 0 ----------------------------------------------------------------------------------------
---------
EF. ............
1 ..............................
$
100.00
I ..................................
.$
2,500.00
:BEAM GUARDRAIL TYPE 10
---------
L.F. ------------
$ -----------
1 --------------3-,-3bb.00-
30
.............................
6760 :BEAM GUARDRAIL TRANSITION SECTION TYPE 21
4 ............. m ..........................................................................
2
--------------------------------
EACH
$
-------------------------------
6,500.00
$
13,000.00-
------ 31 0 --------
6766 :BEAM GUARDRAIL ANCHOR TYPE 10 0 ........
--- 1:_F5ANT__-E1-N-E ---------------------------------------- 0 ------------------ ...........
I 4
EACH
..... I.
:$
2,000.00
................
$
0 .................
8,000.00
�f .........
Mb6 (PAVED ROADS)
.... %.
-------------------
0
----------------
L.F.
11
F$ --------------
0 ----------
3.00
----------------------------------
$
-----------------------------33
PROJECT TEMPORARY TRAFFIC CONTROL
6971 ------------------------------------- 0 ----------------------------------------------------------
--------------_-
-----------
-----_----------
L.S.
$
-----------
�0'1000.00
11 .............................
$
30,00066"
OTHER ITEMS
------------------------------------------------------------------------------------------------
0 ------------------------
-----------
----------------
----------------
------------------
-
7018 :WATER ---------------
- --------
300
---- ------------
meal
I ------------------
b ----------------------------------------
.00
$
-
6,000.00
35 -----------------
36
7037 :STRUCTURE SURVEYING
I -------------------------------- 0 ----------------------------------------------------------------
:ROADWAY
---------------_---------_-
L.S.
$
---- --------
8,000. 00
0 ----------------------------------------------
$
8,000.00
------
--- 7038 SURVEYING ------------------------------------------------------
1
L.S.
8,000.00
$
8,000.00
...... ..........
............................................................... ...............
----------------------------------------------------
L.S.
$
6,000.00
---------------- 6-,bbb ------
"
------ §9 ----------------
.................. .................00
�EA�---------------
1
-------------------------------------------------------------------------------------------------L.S.
--------
$ --------
f-----.--------:---------------.-.-..-..---------
400.00
... -----------------------------------------
:
2,000.00 -
.............................
:UTILITY WORK
............. M ----------------------------------------------------------------------------------
---------------------------....------------------•-----....
14,000.00
$
.................................
14,000.00
-----------------------------
-.--.-----------------------------------------------------
----------------------------------------------------- 0
-
-------
----- :Construction
--------Contingency
0--3--,,-2--52--.-7--5
.....................
..........................0...............m.....................................................CONSTR.
....16i.....--------
. 0...................
-C---o-s--t -
-:---$ -- -----2,9--
$...-----290,326.00
- -
------------------------------------------------------------------------------------------------------------------------------
.
....................-j--------Total Construction $ 3,193578.75-
-----------------------------
------------------------------------------------------------------------------------- ------------
FAIGR.
A
1. --- ------------------------------------
15%
: Prelimin Eng. $
435,488.00
------------................
------------------------ 0 .................................................... 0 .................
4%
-------- ----------------------------------
Construction Eng.: $
406,456.00
-----------------------------
......................
------------------------------- m --------------------------------------------------------------- TOTALS
m ...... ................................... 0 .............................................................
2023 TOTAL
$
4,035,522.75
-----------------------
: --------------- 0 ---------------------------------------------------------------------------------
2024 TOTAL
$
4,358,365.00
.............................
------------------------------------------------------------- 0 ---------- 0 .......................
Inflation
8%
2025 TOTAL
$.
5,083,597.00
-----------------------
---- ---------------------------------------------------------------------------------- --------------
2023
TOTAL
COST
PER SQ. FT.
$
805.00
.....................
----------------------------
SUPERSTRUCTURE
•--__---
--
-_- -_ ___
----------------------------------------------------------------
PRESTRESSED CONCRETE GIRDERS
--------------------------------------------------------------------------------- ------------
-------------------------------------
909
------------------
L.F.
$ ----
-------------------
1,110.0d
--
FV
-------- - ----- - ----
1,008,9 96. 0
.............................
CONC. CLASS 4000 FOR BRIDGE
..... 0 .......... 0 .......................................... m ......................................
40
-----------------
C.Y.
----------------------------
$
1,800.00--:
; --------------
$
--------------------
72,000.00
-----------------------------
ST.REINF. AND EPDXY BAR FOR BRIDGE
-----------------------------------------------------------------------------------------------
...... T5�6Z
.....
..............................
$
3.50
....................
$
__�i
35,917.00
---------------------------
-------------------------------------------------------------
KEYWAY GROUT ----------------------- -----------------------------------------------------------------------------------
------- �_
L.F.
: _�
--i
� -0
-------
$
---------------------------
19,475.00
................
0 ...............................................................................................
PRESTRESSED GIRDER WELD TIES ..............
.1 156
....................................
EACH
$
40.00
1.----------------------------------
$
6,240.00
----------------
--------
NOSING ANGLE
76
L.F.
........
------
.............................
LAMINATED ELASTOMERIC BEARING PADS
..........................................
14
.............
EACH
$
.00
$
15,400.00
------ 0 -------------------
BUTYL RUBBER STRIP:$-
- - - - - ------------------------------------------------------------
79 m .....
-------------------------
--------------------------•-----1,100
L.F.15.00
..................................
$
1,185.00
--------------------------------------------
GIRDER STOP PADS
0 ------------------------•------------------
28 ------------------
; - --------
EACH
:_$ -----------------
1 -----------------------------
8_0__._0__0_
- ---- ---------------
$
-1 -----------------------------------
--------
2,240.-66-'
..............
-------------- ------------
..............................................................................
m .............. m ...........
..............................
..........................
Total Superstructure
NICHOLLS KOVICH ENGINEERING, PLLC 248-2