Loading...
HomeMy WebLinkAboutResolution 21-050-CCBOARD OF COUNTY COMMISSIONERS Grant County, Washington IN THE MATTER OF AMENDING THE 2021 ANNUAL ROAD PROGRAM Resolution No. - J f _ 615-6 WHEREAS, IT IS HEREBY RESOLVED THAT Road Project Dodson Rod overlay, N -Frontage Rd to 4 -NW, CRP21-07, State Road Log No. 91030 from milepost 15.88 to milepost 18 70, 2021 Annual Road Program Item Number 24 be amended as follows: An appropriation from the 2022 road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE Preliminary Engineering Construction TOTAL PROGRAM SOURCE Local STP(R) AMOUNT OF APPROPIATION, $407000 $6301 000 $67.04000 This project will resurface existing Hot Mix Asphalt (HMA) pavement with HMA overlay, shoulder finishing, guardrail, traffic control and other associated work on Dodson Road. This projects is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.0307 36.80.070) BE IT FURTHER RESOLVED (Check appropriate box) E This project is included in the officially adopted Annual Road Program as item No. 12 ❑ This project is hereby made a part of the officially adopted Annual Road Program in accordance with RCW 36.81.130 BE IT FURTHER RESOLVED: (Check appropriate box) The construction is to be accomplished by contract in accordance with RCW 36.81.130 F-1 The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18 ADOPTED this Day of 02021. �j BOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON Yea Nay Abstain I -z Cindy Ca rt e\4 Chair e - Danny E. tone, vic -Chair RobQoml �jmernber