IN THE MATTER OF AMENDING
THE 2021 ANNUAL ROAD PROGRAM
Resolution No.
- J f _ 615-6
WHEREAS, IT IS HEREBY RESOLVED THAT Road Project Dodson Rod overlay, N -Frontage Rd to
4 -NW, CRP21-07, State Road Log No. 91030 from milepost 15.88 to milepost 18 70, 2021 Annual Road
Program Item Number 24 be amended as follows:
An appropriation from the 2022 road fund budget and based on the County Engineer's estimate is
hereby made in the amounts and for the purposes shown:
PURPOSE
Preliminary Engineering
Construction
TOTAL
PROGRAM SOURCE
Local
STP(R)
AMOUNT OF APPROPIATION,
$407000
$6301 000
$67.04000
This project will resurface existing Hot Mix Asphalt (HMA) pavement with HMA overlay, shoulder finishing,
guardrail, traffic control and other associated work on Dodson Road.
This projects is hereby declared to be a public necessity and the County Road Engineer is hereby
ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.0307
36.80.070)
BE IT FURTHER RESOLVED (Check appropriate box)
E This project is included in the officially adopted Annual Road Program as item No. 12
❑ This project is hereby made a part of the officially adopted Annual Road Program in
accordance with RCW 36.81.130
BE IT FURTHER RESOLVED: (Check appropriate box)
The construction is to be accomplished by contract in accordance with RCW 36.81.130
F-1 The construction is to be accomplished by county forces in accordance with RCW
36.77.060 and WAC 136-18
ADOPTED this Day of
02021.
�j
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
Yea Nay Abstain
I -z
Cindy Ca rt e\4 Chair
e -
Danny E. tone, vic -Chair
RobQoml �jmernber