Loading...
HomeMy WebLinkAboutAgreements/Contracts - Public WorksAAbk Washington State Department of Transportation Agency Grant County Public Works Address 124 Enterprise Street Ephrata, WA 98823 K21-142 CFDA No. -20.205 (Catalog or Federal Domestic Assistance) Project No. Agreement No. For OSC WSDOT Use Only The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the regulations issued pursuant thereto, (3) 2 CFR Part 200, (4)_2 CFR Part 180 — certifying that the local agency is not excluded from receiving Federal funds by a Federal suspension or debarment, (5) the policies and procedures promulgated by the Washington State Department of Transportation, and (6) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency. Project Description Name U -SE Overlay Termini MP 5.2 to MP 12.59 Description of Work Length 7.39 Miles This project will resurface the existing HMA pavement with an HMA overlay, shoulder finishing, guardrail, traffic control and other work on road U -SE. Project Agreement End Date December 31, 2023 Claiming indirect Cost Rate August, 2021 ❑Yes � No Proposed Advertisement Date Au g �►ge y i ial By Title (,�A4 4 "4,� a., DOT Form C Revised 12/2020 Washington State Department of Transportation By Director, Local Program CVMVwI'S.-5i";Dat:e Executed Page i Estimate of Funding (1) (2) (3) Type of Work Estimated Total Estimated Agency Estimated Federal Project Funds Funds Funds PE a. A enc b. Other Federal Aid c, Other Participation d. State Ratio for PE e. Total PE Cost Estimate a+b+c+d 0.00 0.00 0.00 Right of Way f. Agency .Other Federal Aid h. Other Participation Ratio for RW i, State '. Total R/W Cost Estimate f+ +h+i 0.00 0.00 0.00 Construction k. Contract 2,102, 830.00 283, 882.00 1, 818, 948.00 % 1. Other m. Other Federal Aid n. Other Participation o.Agency 951170.00 127848.00 82,322.00 Ratio for CN , State 2,000.00 270.00 1,730.00 . Total CN Cost Estimate k+i+m+n+o+ 2,20000.00 297,000.00 1,9037000.00 r. Tofia! Project C)§t Estimate e+i+ 2,200,000.00 297,000.00 1,9039000.00 �►ge y i ial By Title (,�A4 4 "4,� a., DOT Form C Revised 12/2020 Washington State Department of Transportation By Director, Local Program CVMVwI'S.-5i";Dat:e Executed Page i