HomeMy WebLinkAboutGrant Related - BOCC (002)3
GRANT COUNTY
BOARD OF COUNTY COMMISSIONERS
To: Board of County Commissioners
From: Janice Flynn, Administrative Services Coordinator
Daft July 19, 2021 ,
Re: Authorization for Release of BOCC Approved Funds, SIP #2018 -08 -
City of Warden, Waterwaste System Lift Station
The City of Warden has certified the requirements for release of funds in the above -
referenced SIP project, which was approved by the BOCC pursuant to Resolution
No. 18 -061 -CC dated June 12, 2018. The proof of requirements is in the form of
a signed Project Certification form from the Port and supporting invoicing of the
project that meets the SIP grant award amount.
To that end, I am requesting the release of funds on this SIP project as follows:
(1) The balance of the grant award in the amount of Three Hundred
Seventy Nine Thousand Thousand Five Hundred Fifty Eight and
79/100 Dollars ($379,558.79) to the City of Warden.
Note: The full grant amount was $419,000 and the first installment payment of
$39,441.21 was made in January 2019
Thank you.
Rated this I day of
Board of County Commissioners
Grant COLInty. Washington
Apprgve Disapprove Abstain
Dist# I D* -t 41 Dist #I
Dist #2' 1st #2 Dist #2
[Ast 9.3 Disl #3 Dist #3
Jul t'M�
L �! 0 2-111n
C #01 .04'r W
509-349-2326 FAX 509-349-2027
121 So; Mrx4�vvStreet
WAIRDEN, WASHINO-rON 98857
June 30, 2021
Board of County Commissioners SENT VIA EMAIL TO Janice Flynn
Attn: Janice Flynn
Administrative Services Coordinator
PO Box 37
Ephrata, WA 98823
RE: Strategic. Infrastructure Project —SIP No. 2018-08
City of Warden, Wastewater Collection System Extension
Dear All,,
The City of Warden is requesting a progress payment for the above referenced funding.
Documentation is provided with the required Project Certification form.
Your consideration for this final progress payment is appreciated.
Sincerely,,
14
Kristine Shuler
Clerk-Treasurer/City Administrator
City of Warden
GRANT COUNTY
STRATEGIC INFRASTRUCTURE PROGRAM
PROJECT CERTIFICATION
This form must be signed and returned, with an invoice, for the approved n ing,
before reimbursement can be approved by Grant County.
SIP Project Proposal Number:
SIP Funding Recipient:
SIP Project Description:
2018-08
City of Warden
Waterwaste System L*ift Station
1, the undersigned, do hereby certify under penalty of perjury, that the materials have
been furnished, the services rendered, and/or the laborperformed as described in the
project proposal for the above -referenced SIP Project and that I am authorize
d to
authenticate and certify to this claim, I also certify that this claim is just and due, and is
an unpaid obligation agaffist Grant County.
Further, according to the SIP Project Funding Policies, I attest that at the next audit of my
entity, this project shall be called to the attention of theWashington State Auditor's
Office and an emphasis audit will - be requested to assure that these funds were expended
toward the project and according to the intent of the proposal.
1/(S-
PAied Name
Date Si ed
� syr . er-�-if�c�
Title
Printed Title
*,Pi2 a
Completed, signed original cerMcation and invoice are to be mailed to:
Administrative Services Coordinator, PO Box 37, Ephrata, WA 98823
ATTACHME,4NT 4
Strategic Infrastructure Program - City of Warden (SIP 2018-08)
Reimbursement Request - Progress Payment #2
Vendor Inv N
Gray & Osborne
Gray & Osborne
Gray & Osborne
Gray & Osborne
Gray & Osborne
Gray & Osborne
Gray & Osborne
Gray & Osborne
Gray & Osborne 114
Gray & Osborne 11
Gray & Osborne .11
Pegram Construction
Pegram Construction
Pegram Construction
SIP Project Award
$ 419,000.00
Amount
14
5
$ 81942.06
14
6
$ 310421.68
t4
7
$ 51787,50
t4
8
$ 19,139.09
14
9
$ 20,217.21
14
10
$ 4;561.66
14
11
$ 2,328.06
4
12
$ .11394.26
14
13
1,83..44
4
14
$ 557.08
Is.
71087.30
1
204.,019.22
2
$ 49.t701.67
3
$ 56,,583.19 >
less overage
$ (5t633.63)
Total
$ 379,558.79
SIP Project Award
$ 419,000.00
Reimb. Request #1
(39,441,21)
Reimb, Request #2
$ (37915-58.79)
Balance Available
$
Invoice
r!O
CONSULTING ENGINEERS
December 17, 2018 4 1
City of Warden Project No: 18044.00
121 South Main Street lnv6ice No.,. 5
Warden, WA 98857
Project 18044,00 Lift Station No. 2 Replacement
Professional So from November 11 2018 to December 08 2018
I OnrQnnnal ��
n
1130 Rainier Avenue S., Suite 300 Seatte, Washington 98144 (206) 284-0860 Fax (206) 283-3206
P(inted on recycled paper
Hours
Rate
Amount
Engineer In Training •
DeVries, Timothy
50.00
93.38
41669.00-
Renteria, Julio
11.50
123.49
11420.14
P. Manager
Tulloch, Donald
1.50
154.56
231.84
Wagner, Stephen
11.00
186.76
21054.36
Surveypr
.
Schulkin, Brian
5.50
103.04
566.72
Totals
79.50
81942.06
Total Labor
81942.06
Billing Limits
Current
Prior
To,Pate
Total Billings
8,942.06
391441.21
481383.127
Limit
108,140.00
Remaining
59175673
Total this
Invoice 942.06
1130 Rainier Avenue S., Suite 300 Seatte, Washington 98144 (206) 284-0860 Fax (206) 283-3206
P(inted on recycled paper
!QQ
V4 4%
,.:t .0
Y:
MUD*
.. ....... ..
LC _X
_S
0
0FIV-,`..G%`E HIG I N E E'A
14.L.
--4'47
It
yL
ya
I 11VO I
January ,I 1 2019
City Of W&de'n*
P.M666bf No; 18044.00
121 South Main Street Invoice
W__-arden, WA 98867 11
Project 18044.00
Lift Station:No. 2 Replacement
Professional Services frolni December 09, 2018 to Jan U, ary 05 2019,
Professional Personnel
Hours
Rate
Almlou nt
Engineer In Training
DeVries, Timothy
9.00
96.60
869.40
Renteria, Julio
5.50
123.49
679.20
P. Manager
Wagner, Stephen
8.00
186.76
11494.08
Totals
A 22.50
3,042,68
Total Labor
3;042.68
Billing Lfmfts
Current
Prior
To -Date
Total Billings
3?042-068
48,383.27
51,425.96
Limit
108,140.00
Remaining
56,714.05
Total this
Invoice ---.$3,042-68.
1130 Rainier Avenue S.., Suite 300 Seattle, Washington 98.144 (206) 284-0860 Fax (206) 283-3206
4
7.�q Printed on recycled paper
Limit 108,140-00
Remaining 501926,55
Total this Invoice X5187.50
ror
1130 Rainier Avenue S., Suite 300 Seattle, Washington 98144 (206) 284-0860 Fax (206) 283-3206
Prided on eMded paper
PIP
Osb"VT14B c4b
CONSULTING ENGINEERS
Invoice
February 12, 2019
City of Warden
Project No:
18044.00
121 South Main Street
Invoice No:
7
Warden, WA 98857
elf
Project 18044.00
Lift Station No. 2 replacement
Professional Serviges from Janua!y
06, 2019 to FebruaU �O2., 2019
Professional Personnel
Hours Rate
Amount
Engineer In Training
Renteria, Julio
11-00- 123.49
1)358.39
P. Manager
Wagner,- Stephen
1.00 186.76
186.76
PLS
Benson, Lawrence
31,00 136.86
41242.35
Totals
43,00
5178.7.5b
Total Labor
61787-50
Billing Limits
Current Prior
To -Date
Total Billings
51787.50 51,425.95 67,213.45
Limit 108,140-00
Remaining 501926,55
Total this Invoice X5187.50
ror
1130 Rainier Avenue S., Suite 300 Seattle, Washington 98144 (206) 284-0860 Fax (206) 283-3206
Prided on eMded paper
OSLOV13_c�v Lace
CONSULTMG ENGINEERS
InvolGe
March 12, 2019
City of Warden
Project No:
18044.00
121 South Main Street
Invoice Na:
8
Warden, WA 98867
Project 18044.00 Lift Station No. 2 Replacement
Professional Services from FebruaLiLO,3, 2019 to March 02 _2019
Professional PersonnGl
Hours
Rate
Amount
Engineer In Training
DeVries, Timothy
19,50
96.60
11883.70
Renteria, Julio
3.00
123.49
370.47
P. Manager
Tulloch, Donald
6.00
154.56
927.36
Wagner, Stephen
16.00
186.76
2X89-16
PLS
Benson, Lawrence
13.00
136.85
11779.05
surveyor
Lovell, Patr 4 ck
10.00
1.04.81
11048.10
Predi'letto, Thomas
10.00
75.67
756.70
Totals
77-50
91753.54
Total Labor
91753-54
• Consultants
Electrical Consultants
3112/2019 Conley Engineering, Inc.
81389.95
Total Consultants
1.1 times
82389.95
9;228.95
Reimbursable Expenses
Mileage
158.0
Total Re'imbursables
11.0 times
156.60
156.60
Billing Limits
Current
Prior
To -Date
Total Billings
19$139.09
57,213.45
763352.54.
Limit
108,1404-00
Remaining
b
31,787.46.
Total this Invoice
$19,139.09
1130 Rainier Avenue S,, Suite 300
Seattle, Washington
98144 (206) 284-0860 Fax (206):283-320B
Printed on racycied paper
:.yy %'--tip^ 1 7 -it vxh.••.i.lr1R�1!-t.�•.-c':-+.-�M...�..�.s7; y_.....-=�?:c'.:-`.•5r '-tiri•:�:.� »L- ra-r. •.. �._ - _ - _ . r- ri _ - �i
�' • ..,zi l..n.v.-i!• r•�.Ots<'4r• S• •J'�J .4 r" _-•}.':. rI� - i:S��_"<_..~'.� ^T---. ... :�� .•z...: TY: ,`��:., �•!si.
'i .i -G�' !�y 1�' i.••x} r �4� .,.r -x �%r, -a �`: - 4c�.. :S:•: :i� :iri r-•- ^'.f'•t' is _ - � x
ri-� � -:tir•
2 -tea •.• -
t
k
I . s
(3�
CONSULTINQ ENG I NEE FIS
.K '•t
r.
• S-
s�'a•i
't
-
_
Invoice
09, 2010
City ofApril
arden
Project No:
18044.00
121 South Main Street.
Invoice No:
9
Warden, VSA 98857
Project 18044.00
Lift Station No. 2 Replacement
Progressional Services from March 03 2019 to March 30 2019.
Professional Personnel
-lours
Rate
Amount
Engineer In Training
'DeVries, Timothy
21.00
90.60
20028.00
Renteria, Julie
2.50
128.49
308.73
P. Manager
Tulloch, Donald
4.50
164.58
095.52
Wagner, Stephen
0.00
180.76
11120.58
.
Civil Engr.
.
eVries, Timothy
8.60
90.60
821.10
PLS
Benso-n, Lawrence
26.00
130.85
31421.25
Surveyor
Bond, Richard
2.50
139..27
348■18
Lovell, Patrick
9.00
104.81
943.29
L redile Lto, Thomas
9.00
75.6
681-03
Totals
88.00
10,368..26
Total Labe
1OP368.26
Consultants
Geotechnical Consultant
4/8l201*9 PanGE''O, Inc.
81837.59
Total tilr AA'nsu pants
1.1 fi VV
8837.59
9F72.1.35
RVfmbursable Expenses
Mileage
127.60
Total, l eimbursable d
1.0times
127-60
12T.60
Billing Limits
Current
Prior
To -Data
Total Billings
201217.21 70,352.54
08,509.75
Lira it
108,140.00
Remaining
11,570.25
Total this Invoice
x
1130 Rainier Avenue S.t Suite 800
Seattle, Washington 08144. (06) 284-0860
Fax 206 288-8206
(� PrINed on recycled papot
1130 Rain* Avenue S., Suite 300 Seattle, Washington 98144 (206) 284-0860 Fax (206) 283-3206
! 0,1
;�, . Printed On recYctOd paper
16,
CONSULTING ENGINEERS
Invoice
City of Warden
May 87, 20• 1
Project No:
18044.0.0
121 South Main Street
Invoice Noo*
10
Warden, WA 98857
P roj ect 18044.00
Lift 8tation No. 2 Repladem'pht-,
7
Professional Services from March 3T, 2019 to Ap
_T11 27,201§'.
Professional Person nel
H6 U Rite
t
A*`
m66nt
P. Manager'
Wagner, Staphe n -
.7.00 .:.186.76
11307.32
Civil Engr.'
DeVries, Timothy
32.50 96.60
31139.50
Totals
39.50
41446.82
Total Labor.
Ir
41446-82
Reimbursable Expenses
Mileage
114.84
Total Reimbursables '1.8 times
114,84 114.84
Billing Limits
Current Prior
To -Date
Total Billings
41561.66 96,569.75
10 1 1131-41
Limit
1083140.00
Remaining
71008.59
Total this Invoice
41561-66
1130 Rain* Avenue S., Suite 300 Seattle, Washington 98144 (206) 284-0860 Fax (206) 283-3206
! 0,1
;�, . Printed On recYctOd paper
Osbovzie� Lac,
CONS U4TING -ENGIN EERS
-Invoi-ce
City of Warden June 03, 2019
Project No:
121 South Main Street Invoice No:
Warden, WA 98857
Project 18044.00 Lift Station No. 2 Replacement
Professional Services from April 28, 2019 to May 25, 2019 -
Professional Personnel
18044.00
11
1130 Rainier Avenue S., Suite 300 Seattle, Washington 98144 (206) 284-0860 Fax (206) 283-3206
4 Printed on recycled paper
Hours
Rate
Amount
P. Manager
Wagner, Stephen
6*400
186.76
11120.56
Civil Engr.
DeVries, Timothy
4.00
96.60
386.40
PLS
Benson, Lawrence
6.00
136.85
821.10
Totals
16.00
21328.06
Total Labor
21328.06
Billing Limits
Current
Prior
To -Date
Total Billings
21328.06
101-1131,41
103,459 . .47
Limit
108,140.00
Remaining
41680.53
Total this
Invoice t22328.06'
1130 Rainier Avenue S., Suite 300 Seattle, Washington 98144 (206) 284-0860 Fax (206) 283-3206
4 Printed on recycled paper
I
1130 Rainier Avenue S., Suite 300 Seattle, Washington 98144 (208) 284-0880 Fax 248 283-3208
Printed on recycled paper
a 1
f
08L
CONSULTING ENGWEEAS
!1
'I Y I Es
y
`
.,4.(\y of Wa rd e n
June 2 t201 9
Project No.,
18044.00
�/-l2-1 South Main Street
' Warden, SVA 93357
Invoice No:
12
tl
Project 18044.00
Lift Station No. 2 Replacement
1'
Professional Services froma{j
-- ti r Isa
r , 2019 to June 2, 2019
r-1
_ -
Professional Personnel
Wosa
H�v/4i rate
Amount
P. Manager
Wagner, Stephen
6.00 136.76
11120.56
PLS
Beason, Lawrence
2.30 136.85
273.70
Totals
3.00
1;394.26
Total Labor
11394.26
Billing Limits
Current Prior
To -Bate
Total
11394.26 103.0459.47
104,353.73
•Billings
Limit
108,140,00
Remaining
31236,27
Total this Invoice $1,394.26
I
1130 Rainier Avenue S., Suite 300 Seattle, Washington 98144 (208) 284-0880 Fax 248 283-3208
Printed on recycled paper
CONSULTING 5NOINEERS
Invoice
July 29, 2019
city of Warden Project No'.
121 South Main Street Invoice No:
Warden, WA 98857
Lift Station. No. 2 Replacement
Project 18044-00 20.2019
Professional Services from June 23, 2019 to JuIV
I
p
9 1 arcnnned
18044.00
1.3
U;n;O
r-JIVwit" Hours Rite Amount
PLS 13-00 140.88 ixi.44
Benson, Lawrence
Totals 13.00 11831.44 11831.44
Total Labor
E3111ing Limits Current Prior To -ate
D
n 42 1-7831.44 104,853.73 106t685.17
Limit
Remaining
1081140.OU
11454.83
Total this Invoice 4
1130 Rainier Avenue S.Suite 300 Seattle, Washington 98144 (206) 284-0860 Fax (206) 283-3206
;
�_�xv printed ort recycled paper
Y&OSL OrX107 IZICO
CONSULTING ENGINEERS
City oarden September 23, 2019
f W
121 South Main Street Project No: 18044.00
Warden, WA 98857 Invoice No: 14
Project 18044.00 Lift Station No, 2 RePlacement
Rrofessional Services from 6y �Ust 18, 2019 to sel)tember 14 2019
RrOfessional Personnel
P. Manager Hours Rate Amoun . t
Ellis, David
Totals 4.00 139.27 557.08
4,00 557.08
Total Labor
Billing Limits 557.08
Total Billings Current Prior To - Date
Limit 557.08 1061685.17 107,242,25
Remaining 108,140,00
897-76
Total this Invoi,ce.,.- A- t5.87 -A
1130 Raider Avenue S., Site 300 Seattle, Washington 98144 (206) 284-0860 Fax (206) 283.3206
4 Printed on recycled paper
Invoice
i i:,inPninipr 4wnni on q qi sito Qnn Ca,-lifln IA10C.'111 n ri f es n 001 .1 A iona\ F10 -i If-1r'%r'%
January 5, 2021
City of W. -a -r -den
Project No:
18044.00
121 South Main Street
Invoice No:
15
Warden, WA 98857
Project 18044-00
Lift Station No. 2 Replacement
Plrofesstonal Services from December 6, 2020 to December 31,
2020
Professional Personnel
Hours
Rate
Amount
P. Manager
Maio Hipp
8.00
173,88
11391.04
Wagner, Stephen
16-00
195.62
31129.92
Civil Engr,
DeVries, Timothy
20,.00
104,65
21093.00
Technician
Foley, Darla
7.00
67.62
473.34
Totals
51,00
71087,30
Total Labor
7l887.30
Billing Limits
Current
Prior
To -Date
Total Billings
71087.30 1,.071.242.25
114,329.55
Limit
293,140.00
Remaining
178,81045
Total this Invoice
71087.30
i i:,inPninipr 4wnni on q qi sito Qnn Ca,-lifln IA10C.'111 n ri f es n 001 .1 A iona\ F10 -i If-1r'%r'%
PROGIRE, SS ESTIMATE I
MARCH 212021
CITY OF WARD,EN
01RJk1qT.00L1NT)( PROGIWSS ESTLE�� �PERJOD
WASMNGT I ON FEB-�,� 1, 2021 TO FFBR-'(:PARy 26.,2021
PROJECT:
CONTRACTOR. -
CITY OF WARDEN PEGRAM CONSTRUC110N, INC.
LIFT STATION 2 AND FORCE MAIN REPLACEMENT
,
P
G&D JOB NUMB13R 418044 P. 0.'130X 419'
OTHELLO, WA 99344
CY
larD ITEMS
NO.
DESCRIPnON-
I
Mobilization aridDemobUization
2
Dinar Cbaflges
3
Trench Excavhtlon Safety. Systems
4
Unsuitable Excavation
5
Project TOMPbri"Y Traffic Control
6
Erosion Control
7
SPCC Plan
AMO
=AMO�S
UNT THIS
'POUOD
0
Locate Existing Utility
9
Controlled Density Fill
10
Fouddagon CTMvej
I I
Bank Run Gravel far Trench Backfill
12
Crushed Surfacing Rasa Course
13
Cement Concrete Curb and Gut -ter
0
Replamrnent
14
Surface Restoration
15
Commercial HMA Pavement Repair
16
Headworks Conaection
17
Lift Station
Is
E-1cotrical, Telemetry, and
I LS
Instwmentn6on
19
Generator
20
PVC Sanitary Sewer Pipe and A tti nga, 8 -
i 0°/a
50%
Inch Diameter, Incl. Bedding
21
Lift Station 2 R)rce Main Rallrwd
9010(rlo
100,00%
Crossing
'I 'I " A AZp
PROJECTC-()S-Tg
TOTAL
NTrr,y uNxT UNIT MCH L
TH11S.
:IpERXOD
TOTAL.
TO DATE
AMO
=AMO�S
UNT THIS
'POUOD
0
A�O
AMOUWTO
PWENT OF
COMMACT
- . - -
I LS
-
$72,650.00 1
5 0. a (P/,
5 -RO-0 Va-
�1
$36,325.00
t)
. t)ATE
--..-J--QUANT
Sj61:325.0fl
%
I CALC
$20,000.00
0
0.
S0400
S0,00
00/0
ILS
so -CY
$5,750.00
$45.00
9 0, V/0'
90.0%
.
$5,175.00
$5,175,00
90%
I LS
$4,250.00
0
50.40°!.050.00%
0
$O.GD
$2,125.04
$0.00
$2,725,00'
i 0°/a
50%
1 LS
I LS
$4,500.00
$1,500.00
90,00v/6
100.00%
9010(rlo
100,00%
$4,050.0(1to
$4,050.00
901/0
2 EA
$400.00
2
2
$1,540.Ifa
$1,500.00
100%
20 CY
$160.00
0
0
$804.00
$800.00
10 We
40 Cy
$30.00
0
0
$0.00
$0.00
$0.00
$0q.00
00/0
130 CY
1 100 TN
$25.00
$9.30
0
0
0
$0,0D
$0.00
NO
0%
0
$0,00
S0.00
0%
17N
I IN
$2,850,00
S9,000,00
0
0
0
$0,00
$0.00
V/0
570 LS
$55.20
0.00%
0
0.00%
$0.00
$O.00
$0,00
$0.00
0%
0%
I LS
I Ls
$9,350.00
$167,895.00
(),004/4
24.00°/a
0. 0 Wo
20.00%
$0.00
$332579.00
$0.00
0%
$33,579,00
20%
1 LS
1 LS
$113,650,00
$49r100.00
5.00%
0,0011/4
5.000/6
0.00%
$5,677.50
$5,677.50
5%
$0.00
$0.00
00/0
24 LIF
$110,25
0
0
-$0.00
$0.00
0%
I LS
$91950.00
1
1
$90950.00
$9,950.00
W/o
Page 1 of 4
PROGRESS ESTIMATE Y
IwA.RCH 2, 2921
CITYC!R WARDEN
PROGRESS ESTIMATE PERIOD
GRANT COUNTY
FEBRUARY 1, 2021 TO FEBRUARY 26, 2021
WASHINGTON
PROJECT:
CONTRACTOR
CITY OF WARDED
PE43R W CONSTRUCTION, INC,
LIFT STATION( 2 AND FORCE MAIN REPLACE NT
P.0, BOX 419
G&O JOB NUUMER #18044
COLO, WA 99344
I3LD ITEMS--
UAS FRO.TECT COSTS
TOTAL
PERCENT a
ESCRIi'T'iON
QUANTITY t7= TJ E PRICE
TATS
PERIOD
TOTAL AMOUNTMS AMOUNT TLS
TO DATE PEU01) DATE
CONTRACTNO.I
22 PVC Force Main Pipe and Fittings, 6 -
OUANTITY
Inch Diameter, Incl. Badding
23 Manhole 48 -Inch Diameter, Type •1
2,$10 LF
1 EA
$33.60
$5,300.00
2660
0
2660 $89,376.00 $89,376.00
35%
24 Abandon ExistingLift Station and Waive
0 $0.00 $0.00
00A
vault
25 Water Service, l -Inch Diameter
1 LS
1 EA
$1,200.00
$3,180.00
0,000/4
0
0,00% $a.0i3 $0.00
0 -
0°/8
2.6 Water Se.rvicc pipe, 1 -Inch Diameter,
$0.00 $0.00
01/4
Inti. Bedding
60 LF
$26.35
0
0 $0.00 $0,00
0%
Page 2 of 4 t�o�aa
PROGRESS ESTIMATE I
MARCH 2,2021
CrTY OF WARDEN
GRANT COUNTY
WASMNOTON
PROJECT:
CITY OF WARDFX
LIFT STATION 2 AND FORCE MAIN REPLACE NT
G&O JOB NUMBER ff 18044
SUBTOTALEARN41) TO DATE
SALES'TAX
MATERIALS ON DANA
TOTAL
LESS 511A RETAINED (BEFORE TAX)
TOTAL EARN -ED TO DATE LESS RETAINAGE
LIESS AMOUNTS PREVIOUSLY PAiD
ORIGIN,AL CONTRACT AMOUNT
CONTRACT PEIRCENT&GE TO DATE
TOTAL YAYAIENT NOW DUE:
PROGRESS ESTIMA.TF, PERIOD
FEBRUARY I, 2021 TO FEBRUARY 26, 2021
CONTRACTOR:
PEGRAM CoNsTRuCnON
INC.
P-0, BOX 419
OTHELLO,WA 99344
Ts
PROJECT cos Fs
AMDONT s 0 To :DATE
PMUOD . 'DATE
s1"0557.S0 5188,557,50
8,201/o $15,461.72 S15,461,72
$0.00 $0.00
$2041 019.22 $204,019.22
$0.00 $0.00
SZ04,019.2Z
$628.962.00
30%
$2ktO19.22
Page 3 of 4
Pf4grisss
PROGRESS ESTIMATE I
MARCH 212021
CITY OF WARDEN
PROGRESS ESTIMATE PERIOD
GRANT COUNTY
FEBRUARY 1, 2021 TO FEBRUARY 26, 2021
WASBaNCITON
PROJECT:
CONTRACTOR:
CITY OF WARDEN
PEGRAM CONSTRUCnON, INC,
LIFT. STATION 2 AND FORCE MAIN REPLACEMENT
P.O. BOX 419
G&O JOB NOWMER #19044-
OTHELLO, WA 99344
I HEREBY MTEY TM ABOVE ESnMATE 19 A
I HEREBY CERTITY THAT TM WAGES HAvF- BEEN' FAiD iN
TRUE AND CORRECT STATEMENT OV TBE
ACCORDANCE -Wl'TH RCW 39.12 (PREVAXING WAGES)
WORD PEUORWD UNDER TMS CGNTRACT.
[AND THE FEDERAL DAVIS-BACON AND RELATED ACTS
0DIBRA)l
GRAY & 0813ORNA INC.
MGRAM CONSTRUCTION, INC,
TUM DEVRIES, P.E.
CONTRACTORS MRESENTATIVE
SUMMARY
AND DISTMU73ON OF PAYMENTS
PAY
TUJ:AL
EST PROGRESS ESTIMATE PERIOD
EARNED PER SAUS TAX TAX MATMALS ON TOTAL
NO. DATES
PEMOD RATE AMOUNT HAND RETAINAGE (5019) PAYMENT
I FEBRUARY 1, 20:21 TO FEBRUAKY 7.6, 2021
$188,557.50 8.20% $15,461-.72 60.00 $0.00 $204,019.22
TOTAL-.
$188)551.50 $0.00 $0.00 $204,019.22
Page 4 of 4 Pinness EBtmatu I
I16.0GRESS ESTIMATE 2
MARCH 25, 2021
CITE' OF WARDEN
RANT COUNTY
WASHINGTON
PROJECT;
CITY OF WARDEN
LIFT STATi*.l.t`r 21,`3.i�l.t..� FORCE MAIN REPLACEMENT
O JOB NUMBER 418044
NO. DESCRUMO1
I
wwmmaiion=a vemon lizauon
2
Mhior Changes
3
Tr=h Exeavation Safety Systems
4
Unwitable. Excavation
5
Projea Temporary Traffic Control
6
Eros,ion.Coutrbi
UNIT PRICE
Plan
¢7
Locate
Locate •yL� rsyrt}ipdig 7..�tUity
{8
a�
ity Fill
10
fCont y� �yl{lR�rd}�A-�M
7.7fmdat on vel
I I
Bank Run Gravel for Trenr.b BackfIff
12
Crushed Surfacing Base Comae
13
C=ent Concrete Ctwb and C4=
90.0(1'%
Replacement
14
Surface Restoration
15
Comtn=iial HMA Pavemem Repair
16
HandwGth Conn or on .
17
7LiStaiion
Lift Station
is
Lect caL TeL=etry, and
(Q
gemtor
20
PVC Sanitmy Sewer Pipe and Fittings,
100.00 o
8 -Itch 1�iameWr,, Incl. Bedding
21
Lift Station 2 Force Maia Iailroa.d
2
Cro5sing
PROGRESS ESTIMATE PERIOD
FEBRUARY 27, 2021 TO MARCH 26, 2021
CONTRACTOR;
'
EGRAM CONSTRUCTION,, INC.
P,O- JjO 419
OTHELLO, WA 99344
AMOUNT TMS
PEMOD
$0.00
$0.00
$x:00
${1.00
$7.00
$0.00
$0?00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$4,675.00
$0.40
$0-00
$2,646.00
$0,00
T COSTS
1..i.�Ms."S
AMOUNTTO
CONTRACT
TOTAL
X36,325.00
50016
TMS
TOTAL
NTITY UNIT
UNIT PRICE
FEMO ]
TO DA.'
1 L9
$72,650.00
0.000.0
50.000/0
I CALC
$20;00#1.0 }
0
0
-1 1,S
$5,750.€10
0.0(r"/a
90.0(1'%
50 CY
$45.00
0
0
1 LS
$4,250.00
0.00'/0
50.00%
1 LS
$4,500.00
0.00%
90_00%
I LS
$10500.00
0.00%
100.00 o
2
$400,00
1f
2
20, CY
$1,670.00
� j
�j
0
40 CY
S30.0
0
0
131 CY
$25.00
.0
0
1,100 Tint
��,30
0
0
I TN
$2,850.00
0
0
1 TN
$8,000-00
0
0
570
$55n.200
0.t wo
0.00%
TLS,r
I L8
S9,350.00
50.00%
50-00e/4
I LS
$167,895.00
20.00%
40.00%
I
$11(3�,155�0j.j4�0
5�.0}(0���fr�
TLS
iJw7
l a 100.�i0
j0./0� f0��,�/�
0.Q01Q d
0,00%
iJ. Vi►�l �
24 LF
$110.25
.24
24
I LS
$9,950.00
0
1
AMOUNT TMS
PEMOD
$0.00
$0.00
$x:00
${1.00
$7.00
$0.00
$0?00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$4,675.00
$0.40
$0-00
$2,646.00
$0,00
T COSTS
PERCENT OF
AMOUNTTO
CONTRACT
�AT'ETJANTITY
X36,325.00
50016
$11.00
0%
$5:175.00
90%
V).00
0T0
$2,125.00
50%
K00�5jjj0-00
$ l+,,.Q.r�7}J(0.00
i90%f
100�1fl
$801.0
100%
- $0.00
._ � 0%
$0.00
ovo
$0,00
0%
$0_�0
tlai�
$0.00
0%
$0.00
0%
$0.00
081,
501/0
�`]}+�/$4,675x.00
S5,677.50
5%
$0.00
0%
$2,646.00
100%
$9,950.00
100%
Fuge I of 4 Frooms* E"mate 2
ID-JR60GRESS ESTDIATE 2
MAR CH255,2021
CITY OF WARDEN
GRANT COUNTY
WASHINGTON
PROJECT:
CITY OF WARDEN
LIFT STATION 2 AND FORCE MAIN REPLACEMENT
G&O JOB NUMBER #19044
PROGRESS ESTIMATE FERIOD'
FEBRUARY 27, 2021 TO MARCH 26,
CONTRACTOR:
PEORAM CONSTRUCTION., INC.
P,0- BOX 419
OTHELLO, WA 99344
Page 2 d 4 ProWua Elftate 2
DID ITEMS
2
ITIES
PROJECT
COSTS
TOTAL
'PERCENT OF
NO
DESCRIMON
TIES
TOTAL
AMOUN-r THIS
AMOUNT TO,
CONTRACT
. Mo
QIJANTITY UNIT
UNIT PRICE
PERIOD
TO DATE
PERIOD
DATE
QUANTITY
22
PVC Form Nfiffi -Pipe and Fittings, 6 -
Inch Diameter, Incl. Baddiri,,o,
4810 LF
.$33.60
0
2,660
SU.00
W,376.00
95%
2.3
Manhole 48 -Inch Diameter,. Type I
I EA
$5,300.00)
0.95
0.95
$5,035.00
$5,035-00
95%
24
Abandon Existing Lift Station and Vdve
Vault
I is
$1,200,00
0.00%
0.000/-a
$0.00
$0.00
0%
25
Water Servicp,,I-Inch Diameter
I EA
$3,180,061
0
if
$0.00
$0.00
26
Water Service Pipe, 1.1=h Diameter,
bei. BWding
60 LF
$26_3�
0
0
$0.001
SO -00
0%
Page 2 d 4 ProWua Elftate 2
PROGRESS ESTIMATE 2
MARCH 25, 2021
CITY OF WARDEN
RANT COI..TNTY
WASHINGTON
PROJECT:
CITY OF. WARDEN
MFT STATION 2 AND FORCE MAIN REPLACEMENT
&D JOB NUMBER. #18044
SUBTOTAL EARNED TO DATE
SALES T.
ATERULS ON HAND
TOTAL
CONTRACTOR kLAS RETAINAGE BOND
TOTAL EARNED TO DA'C'E LESS RETAINAGE
L"S AMOUNTS PRMOUSLY PAID
PROGRESS ESTIMATE 1
ORIGINAL CONTRACT AMOUNT
CONTRACT PERCENTAGE TO DATE
TOTAL PAYMENT NOW DUM
PROGRESS ESTIMATE PERIOD
FEBRUARY 27, 2021 TO MARCH 2-6,2021
CONTRACTOR:
PEGRAM CONSTRUCTION, INC.
P.O. BOX 419
OTHELLO, WA, 9.9344
PROJECT COSH'S
A OUNT S
iv1 UST TC?
PERI
DATE
$45*935.00
$2.34.492.50
Q $3,766.67
$19,228.39
$49,701.67
$253,720.89
5253,720.89
$204,019.22
911)0 .6-7 $49,701.67
$628,962.00
37%
Page 3 of 4 Progress Estmata 2
CITY OF WARDEN
GRANT COUNTY
WASHINGTON
PROGRESS ESTIMATE 2
MARCH 25, 2021
PROGRESS ES-flMATE PERIOD
FEBRUARY 27,, 2021 TO MARCH 26, 2021
PROJECT: CONTRACTOR:
CITY OF WARDEN PEG A.. CONgrRUCTION,, INC_
LIFTSTATION 2 AND FORCE MAIN REPLACEMENT P.0- BOX 419
G JOB NUMBVR #18644 OTHELLO, WA 99344
I BERE13Y CERTIFY TRE ABOVE ESTIMATE IS A I HERE13Y CERTIFY T14AT THE WAGES HAVE BEEN PAID IN
TRUE AND CORRECT STATENTW OF THE ACCORDANCE WIT14 RCW 39.- (PREVAILING WAGES)
17
WORK PFRFORMED UNDEk THIS CONTRACT. [AND TFIE FEDERAL DA BACON AND RELATED ACTS
(DBRA)I.
OKAY & OSBORNE, INC. PEGRAM CONSTRUCTION, INC.
Page 4 of 4
'Progre2m F.Ztlmnt,- 2
X�'
Z t
TIM DWRiEs, P.E. I
isaTTVE
Covk"Toxs RE
m�
Ski MVL4RY AND DISTRIBUTION OF PAYMENTS
PAY
- — ---------
TOTAL SALES
EST
PROGRESS ESTI MATE PERIOD
EARNED PER SALES TAX TAX
MATERIALS ON
TOTAL
NO.
DATES
PERIOD RATE AMOUNT
HAND' RETAINAGE(55/4)
PAYMENT
M RUARY It, 2021 TO FEBRUARY X- 2021
1198,557.50 8.2011/o 5155461.72
$0.0 - 0 $0.00
$204,019.22
2
FEBRUARY 27, 2021 TO MARCH 26,2021
$45,935.00 9.20% $3,766.67
$0.00 $0.00
$49270I.67
TOTAL.- $234,492.50 $19,228.39
$0-00 $0.00
$253,720.89
Page 4 of 4
'Progre2m F.Ztlmnt,- 2
111113 0 JL A11L
GRFSS ESTDIATE 3
"RIL 26, 2021
CI A -�7O F T1� 1 A�T+�FN
t !lY 1 O 1J Y
WASHINGTON
TO
PROJECT:
CITY OF WARDEN
LIF' STATION I AND FORCE MAIN REPLACEMENT
G&O JOB NUNMER #18044
RrD rrFIM
NO-
DMCRUMON
PERCENT OF
2
Minor Cbzmges
3
Tremb Ems' canon Safety Sy.5te 33s
4
Unmit ble Ex0avatien
5
Px0 ea Temporary Tmxlc conA
6
Erosion Conirol
7
SPCC Plan
8
Locate E�disdng Utility .
9
Controlled D=ity.Fill
10
Foundation Gravel
11
13ark Pun GmVe1 for Trench Back - dl
12
Crushed Surfacing Base course
13
Cem t,Cont to Curb and t'.s'tit r
$0.0
Repllla�yttM�yJt-fi� enL t
y? if1
x.ytion
15
CO=n=ial HMA Pavement .repair
16
ljeadwork6 Ccnnectiou
17
Lift Station
1
E1+ecfxici, Telemetry, and
19
Geacrator
20.
YVC Sa.nitwy Sewcr pipe and Fittings,
1 LS
8 -Inch Diameter, Incl. Bedding
21
Lift Station 2 Force Main Railroad
$0_00
Crossing
PROGRESS ESTIMATE PERIOD
MARCH 27, 2021 TO APRIL 261, 2021
CONTRACTOR:
PEGRAM CONSTRUMON, INC.
P.O.13OX 419
OTHELLO, WA 993-44
COSTS
PERCENT OF
AMOUNT I'll -
CO T'iRACT
TOTAL
TA.1�t'I &
$36,325.00
$0.00
THIS
TOTAL
AMOUNT TMS
UA.NI 177 UNIT
LTMT PRICE
PEMOD
TO DATE
P C I}
I LS1.
��(�,f�
D.00ya
50.00��
$0.00
r
I CALC
�
$2070
0
0
$0.0
1 LS
$5,7
0.000/0
90.00%
$0.00
50 CY
$4
0
a
$0.00
1 LS
$4,255]0,00
0.a()°/Q
50.00%
$0.00
1 LS
$4,500.00
O.(0%
90.00%
$0_00
1 1.S
$1,500.00
0.00%
100.00 VID
$0-00
2 EA
$400.00
0
2
$0.00
20 CY
$1.60.00
0
0
$0.00
40 CY
$30.00
0
0
$0.00
130 CY
$25.00
0
0
$0.00
17100 SY
:::i:..::C.:....-..:..-..::.�i.:t:G:.r
$8.30
0
..
0
$0.00
I LS
r::. ..:..:..ti::.._
$Z,S50.{�i1 _
....L.:v«:S:
0
.:._ .. •- �.. s::r:_C.:.S'L....L:.:..,.c.i"_:-..�.i:+aL'.:�
0
$0.00
1 LS
$8,000.00
0
0
$0.00
570 SY
$55.20
450
450
$24p840.00
US LS
$9,350.00
0.()0*.�0
50.00(110
$0.00. '.
1 LS
$167,895.110
0.00%
40.
$0,00
I LS
$113,550.0D
11.00110
5.00'0
$0.0o
1 LS
$49,1.00.00
5.000/
5.00%
$2,455.00
24 LF
$1 I U.25
0
24
$0.110
1 LS
$9,950.00
0
1
$0.00
COSTS
PERCENT OF
AMOUNT I'll -
CO T'iRACT
TE1
TA.1�t'I &
$36,325.00
$0.00
0%
$5,175.00
90%
0rQ
r$0.00
$2,125.00
50%
$4,050.00
90%
$11,504.00
1009/0
$800.00
100%
$0,000%yy
SO.00
0%
$0.00
0%
$0.00
0%
$0.00
0%
$0.00
0%
$24,940.00
79°l
$4,675.00
50%
$67,158.00
40%
$5,677.50
5%
$2,455.00
5%
$,646.00
100%
$9,950.00
100%
Page I of 4
p(bemw Ftft ate 3
PROGRESS ESTMATE 3
"RIL 269,2021
CM OF WARDEN PROGRESS ESTIMAXE PERIOD'
GRANT COUNTY MARCH 27.4 2021 TO APRIL 26, 2021
WASBTNGTON
PROJECT: CONTRACTOR --
CITY OF WARDEN-
PEGRAM CONSTRUCTION, INC.
LIFT STATION 2 AND FoRcE MAIN pLACEMEN ' P.O. BOX 419
N
G&O JOB .7I' BER
OTHELLO, A. X9344
BID ITEMS
-NO. DESCRIPTION,
22 PVC Pom Mab Pipe and Fittings, 6-
In0h-Dimucter, Incl. Bedding
23 Manhole 48 Inch Diameter; Type 1
24 Abandon Rx -d -sting Lift Station Emd VaIve
vault
25 Water Serviee, I -Inch Ds' ter
26 Water Service Pipe, I -Inch Diameter
CHANGE ORDERS:
C01 Item I - Updaft Federal Prev icing Wage I
CO2 Item I - Decommission La goon
Page 2 of 4
QUANTITIFIS
PROJECT COSTS
TOTAL
PERCENT*01
TMS
TOTAL
AMOUNT M5
AMOUNT TO
CONTRACT
MTY UNIT
UNIT PRICE
PMUOD
To DATE
PERIOD
DATErp%r
QUANT1r1 A.
2,810 LF
$33.60
0
2,660
$0.00,
$89,376.00
9Y-113
1 EA
$5,300.00
0
0195
$0.00
$5,035,00
95%
I LS
$1.,,200.00
0.00%
Uolyo
$0.00
$0.00
0%
1EA
0
0
$0.00
$0.00
0%
60 LF
6. 5
0
G
$0.00
$0.00
0%
I LS
MOO[,
0.o0%
MOO
$0.00
0%
I LS
$25,000.00
100.00%
$251000m
100%
Page 2 of 4
PROGRESS STIM.1
AP L :26} 2021
CITY OF WARDEN
GRANT COUNTY
WASHINGTON
PROJECT.
CITY OF WARDEN
LIFT STA*nON 2 AND TORCE MAIN RFpLACEMENT
G&O JOB NUMBED. #18044
SUBTOTAL EARNED TO DATE
SAL.L'tS TA, X
MAT .0 ON HAND
TOTAL
CO TRACTO R RAS R]ZTAL FADE BOND
TOTAL, EARNED To DATE LESS RETAINAGE
LESS AMOUNTS MVIOUSLY PAED
PROGRESSESTEMATEj
PROGRESS ESTBdATE 2
TOTAL PAYMENT NOW Dom.
ORIGINAL CONTRACT AlgOUNT
CONTRACT AMOUNT WITH CHANGpr ORD gRS 1.2
CONT CT pif;RC:;ENTA(;E TO DATE
PROGRESS ESTIMATE PERJOD
MARCH 27, 2021 TO APRIL 26, 2021
CONTRACTOR:
PEGRAM CONSTRUCTION, INC.
P.O. BOX 419
OTELLO. WA 99344
PROJECT COSTS
O ooTV
PPMOD j DATE
$52,295.00 $256,787.50
8.20% S4A8.�19 $$23,516.58f
6�.58
4
$56,583.19 $310,304.08
$0.00 $0.00
0,394.08
.$204,019.22
$49,3701.67
aC, 83.L9 $56,583.19
$628,962.00
$653,962.00
44%
Page 3 of 4
* Ptopresa C�timate 3
APPJL2 ,2021
CITY OF WARDEN
PROGRESS ESTIMATE PERIOD
q�'COUNTYT COUNTY
MARCH 27s 2021 TAPRIL 26, 202
Yip �.����,3�Lsd �!
PROJECT:
CITY OF WARDEN
CONTRACTOR
STATION 2 AND FORCE MAIN PLA CEMENT
PEGRAM CONSTRUCTION, INC.
G&O. JOB NUER 918444
P.O. 13OX 419
0T LL A 99344
1 HEREBY CERTOY THE ABOVE ESTIMATE IS A
I BEVY CER17IFY THAT THE WAGES HAVE 13EEN PArD IN
TRS AND CORRECT STATEMENT OFF THE
ACCORDANCE WITH RCW 39.12 (MEVA.ILING WAGES)
WORK PERFORMED UNDER `M CONTRACT
[AND THE FEDERAL DAVIS-BACON AND RELATED ACTS
fDBRA )I.
GRAY& OSBORNE,INC.
PEGRAM CONSTRUC-noN, INC.
C 7... A ox s -L1t_S 4� t 7 11 Y J:.
SUMMARY
AND DISi'RA.. UTION OF pAyWNTS
PAY
A
E7# PROGRESS ESTIMATE FZMoD
NO, LAM
EARNED PER SALES TAX i YiTEi5S O1
TOTAL
I FEBRUARY 1, 2021 To FEBRUARY 26, 2021
PFMOD RATE AMOUNT .HATS AUA.GE (5Yo)
$,188.,557.5o $.20% $15,461,72$0.00
PAYMENT
2FEBRUARY 27. 2021 TO MARCH 26, 2021
MARCH 27, 2021 TO APRT 2c�, 2Q21
� $$0.00
�FSx��S.i�� �.200 �� $3�,7�.�7 $0.00 $0.00
$204,019.223
$49,701.67
TOTAL:
$286,787.50 .$237516.58 $0.00 $0.00
$310,344_08
Pace $ of 4
Proortss E!Zmats 3