Loading...
HomeMy WebLinkAboutAgreements/Contracts - Public WorksWashington State �` Department of Transportation Agency Grant County Public Works Address 124 Enterprise Street Ephrata, WA 98823 K�21-117 —2A J Local Agency Agreem-e-nt CFDA No. 20.205 (Catalog or Federal Domestic Assistance) Project No. Agreement No. For OSC WSDOT Use Only i ne Local Agency naving compliecl, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the regulations issued pursuant thereto, (3) 2 CFR Part 200, (4) 2 CFR Part 180 — certifying that the local agency is not excluded from receiving Federal funds by a Federal suspension or debarment, (5) the policies and procedures promulgated by the Washington State Department of Transportation, and (6) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency. Project Description Name Westshore Drive Overlay/Sidewalk Termini Fairway Drive To .25 South of 4 -NE Description of Work Length 2.12 Miles This project will provide for the reconstruction of an existing BST roadway and replace it with an HMA surface, cement concrete curb and gutter, sidewalk, drainage, traffic control and other work on Westshore Drive Project Agreement End Date December 31, 2024 Claiming Indirect Cost Rate Proposed Advertisement Date F] Yes Y"" No Estimate of Fundi Type of Work (2) (3) Estimated Total Estimated Agency Estimated Federal Proiect Funds Funds Funds PE a. Agency 150,000.00 23,822.00 126,178.00 % b. Other Federal Aid c. Other Participation Ratio for PE - d. State e. Total PE Cost Estimate (a+b+c+d) 1505,000.00 23.1822.00 126,178.00 Right of Way f. Agency U/0 .Other Federal Aid Participation h. Other Ratio for RW i. State --- '. Total R/W Cost Estimate (f+g4b-H) 0.00 0.00 0.00 Construction k. Contract -1. 0.00 0.00 0.00 % Other Contract (Other Funds) 0.00 0.00 0.00 m. Other Federal Aid n. Other Participation o.Agenc y Ratio for CN - 0.00 0.00 0.00 - .State 0.00 0.00 0.00 q. Total CN Cost Estimate (k-Hiin+nto+pJ 0.00 0.00 0.00 f e=nh r. Total Prqiect Co st Estimate (e�+q) 150 00"0.00 23822.00 126J78.00 'cY Ager,% Official Washington State By Department of Transportation By Director, Local Program f Title Date Executed DOT Form 140-039 Revised 12/2020 Page 1