HomeMy WebLinkAboutRequest to Purchase - Public WorksMemo
Grant County
Department of Public Works
IL24 Enterprise St. S.E.
Ephrata, WA 98823
To: Honorable Board Of County Commissioners
Grant County
From:
Brian R. Murray
Grant County Public Works Facility Maintenance
Date, July 19, 2021
Serial No. 21.111
Re: Authorization to purchase a waste -oil unit for the Grant Cou
Central Shop. y U ic Works
Authorization to purchase:
Grant County Public Works:
Purchase a waste oil heater due to the failure of the Central Shops current waste -oil heater. The
replacement cost will be in the amount of $12,1758.45, not including sales- tax, and will be
purchased from North Star Clean Concepts. This unit bums our used oil and
our shop. provides heat for
This amount was included in the 2021 budget for Facilities •Maintenance.
Dated this day of'
2021
Board of County or
Co0 ;r
: i, sioners
Approve Grant County., Washi - on
Disapprove Abstain
Dist #1
Dist #1 Dist #1
Dist #
Dist 2" Dist. Dist #2�
Dist #3)9 Dist #3 Dist #3—
Ic
-7
C E'
i V E D
JL,IY 2 P
C
"To meet current and future needs, serving together with public andprivate entities, while fostering a respectful and successful
work environment."
FAXInformation .................................................(509) 754-6082 Keith Elefson, County Road Engineer...................Ext. Ext. 3502
............................................................... (509) 754-6087 Ed Lowry, Supervisor -Dist. No. I ................................ Ext. 3540
Bob Bersanti, Construction Engineer .................... Ext. 3503 Mike DeTrollo, Supervisor -Dist. No. 2 ........................ Ext. 359:1
E-mail ............................. publicworks@grantcountywa.gov Loc Ohl, Accountant Lead.... ................................... Ext. 3555 John Brissey, Supervisor -Dist. No. 3 ........................... Ext. 354:1
Sam Castro, Public Works Director .................. Ext. 3504 Rod Follett, Foreman -Sign Shop ............................ Ext. 3579 John Spiess, Supervisor -Central Shop ............. (509) 754-6086
Samuel Dart, Assistant Directorto
.... Ext. 3519 Jason Collings, Solid Waste ......................... (509) 754-4319 Andy Booth, Bridge Supervisor .............................
.. Ext. 3535
P
Northwest Industrial Equipment Inc
22020 68th Ave S
Kent WA 98032
Telephone 253-872-6060
Fax 253-872-6059
Estimate
DATE ESTIMATE #
6/25/2021 202106022
P.O, NO. I PROJECT
ITEM
190135
DESCRIPTION
QTY
CB -2501 -MP
COST
TOTAL
CB92501
Recycling Center: Includes Tank 215 Gallon,
1 8,121.00
8,121.00T
Rails
Furnace Mount A, Furnace Mount Kit, Drain Pan Kit,
1 39080.00
3,080.00T
Filter Drain Kit (CB -140/1750/2501/3250 metering pup
only)
CB 14225
Support Pack MP Recycling Center
S and H
Shipping and Handling Charges -Freight is A
1 432.00
432.00T
an rox.
Actual freight at time of shipment will be charged.
1 522.15
522.15T
Freight quote good for 5 days from date on Estimate.
Shipping from Janesville WI to Grant County WA.
50% DUE AT TIME OF ORDER, REMAINING 50%
DUE AT TIME OF SHIPMENT.
Estimate
Please date and sign as acceptance of this Estimate
0.00
Signature
Title
PO#
Dated
Sales Tax 1300 - Grant County Unincorp. Areas
8.20%
996.72
Estimate is guaranteed for 30 days from date above, due to periodic price increases from om the
TOTAL
$13,151.87
See our Website vwwv.oilbumers.com
LEAN # euRAIo
The #1 Waste Oil Furnace
In Customer Satisfaction TM
a. Al A
AF ne uonvenienr' inst*affatjon <e%to
Zi rage ziolution
Used=0101 Rec clo
Y ing Center
Storage and Heating Sx/ct
.y... em
The Clean Burn Recycling Center is a CaAMIOSURN
self-contained, on-site recycling and heating
system that lets you store and burn used oil
conveniently and efficiently.
The Recycling Center works in tandem
with a range of Clean Burn used -oil furnaces,
from the CB -140 through the CB -3250.*
The storage tank holds 215gallons to supply
the furnace mounted just above.
Your Clean Burn Distributor is an expert at system
selection and installation planning. Don't settle for
less than Clean Burn, the industry gold standard.
(Chimney pipe not included. 115 -volt, 15 -amp electrical line required.)
*NOTE: Furnace is not included with the Recycling Center and must be ordered separately.
Clean Burn is a strong advocate of
environmental protection and energy
conservation. Our multi -oil heating systems,
storage tanks and recycling centers eliminate
extra handling and transportation of used oils
and, consequently, help avoid the Possibility of
used oils entering our water supplies.
When, used in combination with a Clean Burn furnace,
a state-of-the-art Clean Burn Recycling Center is the ideal
system for collecting, storing and generating heat recovered
from used oils. The Clean Burn Recycling Center works with
Clean Burn Furnace
The Clean Burn Recycling Center accommodates a CB -140, CB -1750,
CB -2500 or CB -3250 furnace (sold separately) to become a complete system.
(it
swivel,
to
A into
in Kit.
CLEAN 0 BURN
The #1 Waste Oil Furnace
In Customer SatisfactionrM
4109 Capital Circle
Janesville, WI USA 53546
1-800-331-0183 Fax: 717-656-0952
WWW.CleanBurn.com
CB RECYCLE SEP12
ON YOUR ANNUAL BURNER
MAINTENANCE!!!
Send your complete Clean Burn burner to
Northwest Industrial Equipment (NWIE) by July 31, 2021
and take advantage of our $399,,00* annual burner 0Burners received between Jul 31 and main enance special.
July September 30, 2021 - $449.00*.
Burners received after September 30., 2021 serviced at regular price - 549.00*.
Don't Be Late! ACT NOW for your $150.00 savings on labor costs.
Terms of special based on burners serviced on a regular basis by NWIE. Burners that are receive
disassembled or not maintained to factory specifications may be charged standard shop
hourly rate of
$135-00/hour for labor, to be determined upon arrival of the burner at NWIE.
*NOTE -These prices do not include parts, shipping, and Washington State tax for instate business which will
be added to the total billing. Contact us with any questions.
Northwest Industrial Equipment's Annual Burner Maintenance
Phone: (253) 872-6060 Fax: (253) 872-6059
Visit Our Web Site At: www.oilburners.com
-------------- cut here Shipping Label.-
cut here -------------------
NORTHWEST INDUSTRIAL EQUIPMENT, INC.
2202068th AVENUE SOUTH
KENT, WA 98032
CLEAN#OBURNO
The #1 Waste Oil Furnace
In Customer Satisfaction°
- --- - .,�Ufjply Nullip . LnecK valve
system ■ In-line washable oil filter ■ Tank filter
includes: ■ Vacuum gauge for filter ■ Oil line fittings package
om
7L
too FY
10
�n
'Maximum BTU/hour
__...........
140,000 (41 kW)
175 00 0 (51.25 kW)
250,000 (73 kW)
1
*Maximum oil consumption
p
.....................................................................
1.0 GPH 3.8 L/h
( )
...............................................................................................
1.2 GPH 4.54 Uh
( )
..................................................................................................................
325,000 95.3 kW
( )
.
350,000 102 kW)
...................................._.........
500,000 (146 kW
_
Fuels
....... .......
1.7 GPH 6.4 Uh
( )
2.1 GPH (7.91 L/h)
....
2.3 GPH (8.7 L/h)
3.3 GPH (12.5 L/h)
............................... .
Used oils. Crankcase,
ATF hydraulic Fuel oils: #2, #4,
and #5 fuel oil
Air flow output CFM
p )
Unit heater 2000
Axial fan
....................
Unit heater 1700
- -.........................................................
Unit heater 2700
......................
Unit heater 3300
........... - -- -........................................................
. ............ ............................ .
Furnace cannot be ducted
Central furnace ducted
( )
0.25 SPWC (in.) 1500
Central furnace (ducted)
0.25 SPWC (in.) 2500
Central furnace (ducted)
0.25
Unit heater 4200
Central furnace ducted
(ducted)
Unit heater 5500
Central furnace (ducted)
_ _ ................. ...........
0.30 SPWC (in.) 1400
0.40 SPWC (in.) 2400
SPWC (in.) 3150
0.40 SPWC (in.) 2900
25 SPWC (in.) 4000
0.25 SPWC (in.) 5200
*Air compressor required
....................
2.0 CFM @ 20 PSI
....... .................
2.0 CFM @ 25 PSI
-
2.5 CFM 25 PSI
_...... .................... _.... ..... .. _....
0.40 SPWC (in.) 3900
_....... .... .. ................
0.40 SPWC (in.) 5100
(3.4 m3 /h @ 1.4 bar)
ml/h
(3.4 m /h @ 1.7 bar)
3 @ )
4 25 m /h 1 7 bar
2 5 CFM 25 PSI
(4.25 m /h @ 1.7 bar)
2.0 CFM 25 PSI
2.5 CFM @ 25 PSI
.tack size
6 inch dia. (15cm dia.)
8 inch dia. 20 cm dia.
__..... ..._.._ .... ......
8 inch dia. (20 cm dia.)
_.....�_ .....................................
(4.25 m3/h@ 1.7 bar
@ )
. .._...... _.. _...._
(4.25 m /h @ 1.7 bar)
......._.. _,.... _........... . .
........
Furnace dimensions, assembled
.... ...... _...... ....
............................................................................
.
...............................................
-- - -
8 Inch dia. (20 cm dia.)
inc is
8 inch dia. (20 cm dia.)
10 inch dia. (25 cm dia.)
x W x (inches)
(millimeters)
61" L x 32" W x 32" H
(155 cm x 81 cm x 81 cm)
83.25" L x 29.5" W x 31.5" H
(219 cm x 74 cm x 79 cm)
103.25" L x 29.25" W x 31.5" H
(262 cm x 74 cm x 79 cm
121"Lx 31.25"Wx35"H
74"Lx �°
35 W x 61 H
................................................
78" L x 38" W x 73" H
__ _
A rox. weight
pp 9
220 pounds 99.8 k
p (
406
__ ..
0 cm x 8 cm x c
7 0 $9 m)
g 89
(18 cm x cm x 155 cm)
(198 cm x 97 cm x 185 cm)
ncrated furnace system)
g)
pounds 182.7 k
p g)
509 pounds 229.1 k
p 9
641 pounds (288.7 kg)
.......................
836 pounds (376.2 kg)
1036 pounds (466.2 kg)
Electrical requirements
115 VAC 60 Hz, single phase
...... _...... ................................. .................
115 VAC 60 Hz, single phase
.. .......................................................................................
15 VAC 60 Hz, single phase
.
30 A circuit breaker
30 A circuit breaker
30 A circuit breaker
230 UAC 60 Hz, single phase
30 A circuit breaker
230 VAC 60 Hz, single phase
230 VAC 60 Hz, single phase
30 A circuit breaker
30 A circuit breaker
* Values indicated above are nominal. Actual values
will vary depending on fuel and installation.
Clean Burn, LLC. 4109 Capital Circle, Janesville, WI USA 53546 1-800-331-0183 Fax: 717-656-0952 www.CleanBurn.com
To: Board Of County Commissioners
Grant County
From: Brian R. Murray
Grant County Public Works Facility Maintenance
Date: July 29, 2021
Re: Authorization to purchase a waste -oil heating unit for your Central Shop.
p
Authorization to purchase:
Waste -oil Heater:
Due to the failure of the Central Shops current waste -oil heater, I would like tourchase a r
of $12,758.45. p replacement in the amount
This amount was included in the 2021 budget for facilities maintenance.
This unit burns our used oil and provides heat for our shop.
,IRS
PONCET
F Z
-Northstar Clean Concepts
633 N Helena St
Spokane, WA 99202
509-535-1555
info@northstardirect.com
northstardirect.com
x%%W%0UU11y_1 _rir_r GSR
Chris Open
- 1 05 WO -H
DISCOUNT PROMO TRADE-IN / CLEAN ENERGY UPGRADE
1 CET2-50
TANK, 250 GAL BLACK WASTE OIL, SAFETY CERTIFIED UL142
1 CIET2-50S
STAND, FOR 250G BLACK WASTE OIL TANK
1 CET -50182
FILTER DRAIN RACK KIT, FIXED MOUNT BETWEEN LEGS
1 0IE60024 ----- -_ ____ .___ 4.. ___.____. __ �___ ____k_.__._ _
HEATING CENTER INSTALL PACK YL -006 0124 Includes:
20168 Pump Mounting Bracket, 60025 Hardware Kit, 80004 Copper Tube -1 /411 x 6 Ft,
80002 Copper Tube -l'/211 x 7 Ft, 80003 Copper Tube -3/811 x 10 Ft, 50179 Tank
Emergency Vent -411 Male, 50187 Vent -2" Weather Resistant Breather
1 V901 96
6" STAINLESS STEEL STACK KIT INCLUDES:
(2) 90018 6X36 SS STACK, (1) 90006 ADJ 611 ROOF SUPPORT, (1) 90007 6" SINGLE
WALL ADAPTER, (1) 90009 6" CAP/SPARK ARRESTOR(1) 90010 6" STORM
COLLAR, (3) 90174 6"X24"SS IN SS 24 , GA. PIPE, (1) 90177 61190 DEG. SS
SINGLE-WALL 24 GA. ELBOW, (1) 90178 6" SSI SINGLE-WALL 24
DEKTITE BOOT #7 GA. TEE, (1) 90155
N WO -H
DISCOUNT PROMO STACK KIT
81900.00
500.00
-500.00
1,763.00
1 y763.00
469.00
469.00
312.00
312.00
489-86
489-86
17224.59
1,224.59
500.00 -500'.00
Sales tax if applicable will be added to invoice. Pricing subj12758-4
osit
ect to SUBTOTAL ,
change without notice. Deprequired to reserve pricing. 5
4
8%)
TAX (.
Returns, if allowed are subject to minimum 25% restocking fee. 0.00
Unless specified in writing, price does not include freight,
installation, electrical, plumbing and permits.
Accepted By
Accepted Date
T�EFFECTIVE
W
.�HEATFOR
LARGER
SPACES
INNOVATIVE FEATURES:
o Stainless steel heat exchanger for long-lasting durability
>> High -velocity, air -swept heat exchanger for more
heating power
>> Vertical flue tubes resist deterioration & last longer
0' Easily opens for service & cleaning without tools
>> Unique design for longer interval between cleanings
>> Electronic burner control that starts every time
0 Fast ROI from reduced or eliminated heating bills
Acceptable fuel: used crankcase oil, transmission fluids, hydraulic oil, #2
heating oil, diesel fuel, most synthetic oils, or any mixture of these fuels
SPECI FI CA TIONS:
>> 245,000 BTU/hour input
>> 1.7 GPH max fuel consumption
>>
2,400/85° F air flow output CFM/heat rise
X> 115 VAC, 60 Hz, single phase,
30 -amp breaker
>> UL and cUL Listed
>> Left or right side chimney outlets
* 6" diameter stack outlet
>> Tank, wall or ceiling mountable
* Hanging weight 515 lbs.
>> 1000+ hour cleaning interval
>> Over -center latches on clean-out doors
>>
10 -year warranty on heat exchanger
with completed
>> 2 -year warranty on parts (warranty registration)
* Made in the USA
INCLUDED IN PACKAGE:
>> Complete waste oil furnace
X> Electronic waste oil furnace burner
>> Pre -assembled, tested metering pump
Direct drive blower w/ 3/4hp motor
Inline oil filter w/gauge
>> Barometric damper
i>- Digital wall thermostat
633 N Helena St. Spokane WA
509.535.1555 1800-727.9128
northstardirect.com
info @ northstardirect.com
Stainless steel components resist
deterioration and last years longer
than the competition.
Over -center latches and smart design
High -velocity, air -swept heat
allow fast access for cleaning and exchanger provides far better heating
service, without tools. power and efficiency.
e71
60J
TOP VIEW SIDE VIEW
virreI Cage Wer for Qui:dt
-0
perat ion
_ECleanAccessss ,0'u
t DoorL
Ry.
3 ver ent-e..- or:
:
,
Easy Access4 "
.
Precision ledt nro Bdrner,
id�
. . . . . . . .
Qn ro
. .
ouvers: -an
P. C BePositioned
,;.:Re' ht
iq b&r-B
igho-Quality os�>
-
eat ar ger.
ow,
1C
-jh"Air-_ 66
V-'16c1tyat
r
�C _ _
.=-
e. hanExcer; .1w
-les Steel t V fti_`� AFFI ud:
TU e.s:.or.,,,. C
Ea aning:
e71
60J
TOP VIEW SIDE VIEW
A
A
E
m -now a W N JF v %*I
i aymvt
'-f-
SMALL FOO
T
114
11"A
PAR
633 N Helena St. Spokane WA
i a � 509.535.1555 1800.727.9128
northstardirect.com
info@northstardirect.com
a
INCLUDED WITH HEATING CENTER.,
1. Furnace stand d legs
2.250 -gallon tank
3c. Large filter drain pan
4., PUMP mount bracket
.S., 4" tank emergency ve-ni
Vent,"weathe-r resistan
breather I
Includes Copper tubing and
fittings to connect furnace
andtank
e
Ond PUMP nOt included with heating center
I Low of j I CUt off switch
2. AirCompressor
3. Air filter/regulator with drairi
and pressure gouge
MorrCo, LLC.
12009 E Empire Ave
Bldg A
Spokane Valley, WA 99206
United States
Voice: 509-381-5748
Fax: 509-381-5747
� Quoted To
Grant County Public Works
124 Enterprise St.
Ephrata, WA 98823
U-S.A
Quote Number: 15245
Quote Date: Jul 13, 2021
Page: 1
Customer'ID Good SalesRep �' hiv -Payment
.,T76
rrit
.. .. . . ....
GCPW
8/12/21 Due After Corn pi
etetion & Start Up MORRISON
s,
���
_ Lt>
i
dz
'f �- �— _7: fns• R. ra s' r
1 ENE
... :: .: �• Vin„ ... •% gla
1
�,r�' �' - x` fL `+• `.� r.. � }f'1�• .. �'i f[4 -.i �..'s:• Z-� 1 4' i
i�.a ,3rd
'f' f Mimi
- V
"-' M. .4
•
Ll -
E AT
u
' : - � , -••. y :- . .:. F_. 1 . S't: ii � jjY X[L" Tom. Y � �`Y'i'
f
�4
J-
AM �
ic -uil rI ruimLnri,
IwAalwc uNlw' NI
Important Information
Page 3
Burner & Pump Specs.
Page 5
Venting Installation
Page 6
Fuel Supply Lines
Page 7
Wiring
Pa. e 9
Schematics
Page 10
Oil Burner Technology
Page 12
Oil Burner Components
Page 13
Initial Start Procedure
Page 15
Suggested Maintenance
Page 16
References (Nozzle I Electrode Burner & Pump)
Page 17
Troubleshooting
Page 19
Warranty Information
Page 21
Warranty Card
Page 22
What is Included
Page 23
MorrHeat -Most Heat In The Industry -Rev 6/11/21 Page 2
IMpurZl'AN1" INF'uRM�I"IuN
Waste oil contains various unknown materials and may also contain random amounts
of gasoline or other volatile fuels. Specific safety and handling precautions should be
considered when cleaning, maintaining and operating waste oil heaters.
It is recommended to use a filter or some kind of strainer when Pouring waste oils into the storage tank[s].
This will increase chances of catching any particulates prior to thePump filter[ sI tonsure a cleaner fuel
source,
WARNING:
Waste oil heaters should not be used in any, hazardous areas that may contain flammable or
volatile vapors or even combustible dusts. Itis not recommended to use a waste oil heater in
any areas that may have chlorinated or similar chemical vapors. This will cause deterioration
& corrosion of the metals the equipment is constructed of(this would void the warranty).
Antifreeze does not burn and will interrupt the performance of the unit and potentially shut
down completely until re -primed and restarted. If too much antifreeze is present just like
water, the unit will not fire. Do not expose units to water, moisture or rain. This is an inside
unit, not designed for outdoor use.
Oils and different Viscosities that can be burnt but not limited to:
*Used Motor Oils ATransmission Fluid --Hydraulic Fluids *Diesel Fuels
Do not use old contaminated oils or fuels and keep in mind underground tanks and outdoor
oil storage could have unknown amounts of water and moisture. Outside barrels will leak
water and moistures through the bunghole.
IMPORI'AN11w:
The instructions and information within this manual are provided to inform you of any
warnings and to assure you have properly and successfully setup the equipment purchased.
The information is also intended to help the end user installer be aware of the operations
and service required for optimal performance. These heaters are recommended for primary
or an auxiliary source of heat but are not recommended for use as the sole source of heat
in case of any expected or unexpected downtime with the unit. If a steady supply of fuel is
not present or interrupted at the burner unit, the burner unit will shut down. Beprepared
with an alternate source of heat to insure the building and all pipes are not at risk of freezing
temperatures.
U
y �Cqmcont:
111cing Meflivemaof uip
When taking delivery of your equipment, please be sure to check the shipment for any
potential damages (MorrHeat is not responsible for any damaged shipments if signed for
non -damaged). If any damage is identified upon delivery, either sign for as damaged goods
specifically noting in detail the apparent damage / or / refuse the shipment completely and
be sure to file a claim with the shipping company immediately regardless of the damage.
MorrHeat -Most Heat In The Industry -Rev 6/11/21 Page 3
Nut"IAC
To insure the best performance, optimal efficiencies and heat output of the heating unit, it is
recommended and necessary to become familiar withyour unit and the procedures needed
with initially starting, running, cleaning and maintaining the heating unit.
Improper installation and or neglected maintenance will void the warranty. Avoiding
maintenance of the unit can cause over fire or over heating of the unit and potentially create
cracks in random welded areas of the heating unit.
It is important to remember when burning used or dirty oils that contaminants could be
present. Because of various contaminates, beprepared to change filters when needed. Keep
the chamber and heat exchanger(s)passageways clean. •Make sure the fuel Pump is primed
and lines are free of any debris, air bubbles or interuptions.
Draft is just as important as the rest; bad draft can cause serious problems and not allow the
gasses within the unit to correctly leave the heating unit. Correct draft is needed for optimal
performance. Bad draft will cause over -fire or overheating due to bottling up the heat or
creating back pressure back in to the heating unit. If black smoke is present, bad draft, bad
combustion or both is occuring (Reference.pg9).
MorrHeat -Most Heat In The Industry -Rev 6/11/21 Page 4
allRNER � PUMPSPC�S.
BURNER ASSEMBLY 1201.1
PUMP ASSEMBLY 120u
BURNER ASSEMBLY 240v
PUMP ASSEMBLY 240u
MorrHeat -Most Heat In The Industry -Rev 6/11/21 Page 5
VCN7"INS INS7'.41_I_A1"I'uN
1. When installing the vent pipe, be sure all connections are fastened correctly to insure �no
leaks and proper draft is achieved. Minimum draft through the unit is, -.02- with draft
meter. Draft up the stack must be -.04 to -.06 inches of water column when checking a
draft meter for proper draft readings.
2. If proper or desired draft isn't easily achieved, a third party draft inducer or power vent
may be needed to prevent back draft from occurring (NOTPROYIDED).
3. Install a barometric damper (NOT INCLUDED) in the stack only if the draft up the stack exceeds
W.08. Draft up the stack must be .04 to .06 inches of water column. Check with draft meter
between the top of the heater and damper. The draft should be a minimum of -.02-
checked through flame inspection port.
4. Keep the draft moving. If draft is too slow or bottles up, this could create a back draft and
over -fire or over heat the unit. If a damper is present, removing the damper will increase
draft making sure passageways are clean and clear.
MorrHeat -Most Heat In The Industry -Rev 6/11/21 Page 6
• It is required to use 3/8" inch Copper Tubing fuel line with same flare fittings from the
fuel supply tank to the fuel filter inlet and 3/8" Copper Tubing fuel line from the fuel
pump assembly to the burner or heating unit. When using copper, be sure to use flare
fittings to stay away from vacuum leaks in the line(s). Ferrule fittings are not recommend-
ed and Teflon tape is not necessary. Using Teflon to on the threads could potentially
increase the chance of creating a piece or flake of the material that could block fuel lines
and passageways.
• Always keep the fuel suction line at least six to eight inches (6" - 8") from the bottom of
the oil storage tank to prevent sucking water and sludge from the bottom of the tank.
Drain water and sludge from the bottom of the storage tank when needed.
• It is recommended to use an inside supply tank vs. an outside or underground tank. If
pulling from an underground tank (blot Recommended), it ispossible a secondary trans-
fer pump would be needed (el ftv[ded). Outside storage tanks or barrels can have water
mixed in with the fuel supply. This will create issues.
• The fuel pump assembly that comes standard with every unit needs to be mounted at
tank level or below. Setting the fuel pump assembly at ground level will function prop-
erly. The fuel pump will push oil up to 100ft horizontal &_up to 25 ft vertica I _. Suction is
limited to 5ft. Keep the fuel pump close to the fuel supply. Gravity feed is possible.
Be sure when .priming or bleeding the fuel pump that you allow enough time to completely
burp any and all air within the system out of the fuel pump and fuel lines. If any skips or
slight interruptions are still present in the system, it is likely the unit will not properly ignite
or run without a steady and consistent fuel supply. The flame sensor needs to recognize
flame in the chamber or it will not ignite.
6 Fuel supply lines continued on page 8...
MorrHeat -Most Heat In The Industry -Rev 6/11/21 Page 7
It is recommend to connect a 3/8" inch Copper Tubing fuel line with same flare fittings
from the tank to the filter housing inlet that is located on the same side as the bleeder
valve on the fuel pump. Once connections are secure, continue the fuel line from the fuel
Pump up to the burner or heating unit. When installing the fuel line to the burner or heating
unit always come up to the burner and never drop down. Dropping down to the burner or
heating unit could create an air pocket that would make it hard to prime or pressurize the
fuel lines. Keep in mind, air pockets can force the primary to lockout.
Standard
Option 1- Fuel Pump Assembly
3/8" Copper Fuel Line
,el Pressure Gauge
1/8'° I.B. Fuel Line
Copper Recommendedl
Reeder Valve
MorrHeat -Most Heat In The Industry -Rev 6/11/21 Page 8
WIRINv
• You will need to wire 120v or 240v power depending on how the unit was ordered into the main
electrical panel mounted directly on the backside of the heating unit with separate 15/20
amp circuit protection using 12 -gauge wire.
• Make sure to connect the power line to the black wire and all white wires which are neutral
or common together. It's very important that the ground wire gets connected to a mounting
point within the main junction box or at least grounded.
• Wires from the main junction box need to be connected to the fuelpump assembly power.
Yellow connects to yellow and the neutral or common connect together, which is white to
white.
• The low voltage thermostat needs to be wired to the "T" terminals on the oilprimary, located
on the top of the burner assembly. (wire diagram pg. 13-14)
Nut"ILC
Installation and use of this product shall be in accordance with the standard for oil burning
equipment ANSI/NEPA 31-2016 along with the national electric code ANSI/NEPA 70-2017, the
requirements of the inspection authorities having jurisdiction.
MorrHeat -Most Heat In The Industry -Rev 6/11/21 Page 9
AsAMMAI'li'L
Nut' Duel VoH'age
E
OILPRENEATER
I�
..........
mo
Y Y U
TIMM1
t 1 i
1.' I.
OILPRIMARY
W
a
(OPTIONAL)
DRAFTINDUCER MOTOR
MorrHeat -Most Heat In The Industry -Rev 6/11/21
Page 10
Z4
NV SLliEMAI'Fl�
Not bumUl vaftggs -
1RED
OIL
J
' •-
PREHEATERBLOCK
1
iiia■■ 'i.
�1.
1,
HIGH
6 r
THERMOSTAT
TRANS- CONNECTION
PRIMARYVOLTAGE
OIL CONTROL 1I
FORMER . •
•
1 G,
"n"" HIGH LIMIT & FAN SWITCH
RELAY
CABINET
(OPTIONAL)
URAFiINDUCER MOTOR
MorrHeat -Most Heat In The Industry -Rev 6/11/21
Page 11