Re: MJ Neal contract revision
Commissioners,
Gran County
Cen Services''
POBox 37
Ephrata WA 98823
(509) 754-2011 Ext -3276
September 8, 2021
MJ Neal, the architect, performing the design work for the new fairgrounds bathroom and kitchen, was
asked to get pricing for the design and bid/construction documents for a sprinkler system. This work
involves multiple disciplines, including mechanical, electrical, civil, and sprinkler design. These
documents are needed if we decide to go forward with the kitchen area and join the 4-H, Commercial, and
Agriculture buildings. This work would be added to the construction documents already being created for
the bathroom and storage areas.
If we continue with this, it will provide us the bid and construction documents to build a new bathroom
and storage area, a catering kitchen, and with the sprinkling, the ability to connect the 4H, Commercial,
and Agriculture buildings allowing for the passage between the buildings without needing to exit any of
the buildings.
The cost to do this work will add $29,427.50 to the $48,000 contract currently in place. This design work
would be funded from the remaining monies from the MUSCO lighting project.
Respectfully Submitted,
�om &aincf
Tom Gaines
Director, Grant County WA
Central Services Department
FDated this � day of , 20
Board of County Commissioners
Grant County, Washington
,- -,)j7, ove Disapprove Abstain
1.)iSt r 1 Dist # i Dist # 1
Dist #21 Dist # 2 Dist # 2
Dist ##33 Dist # 3 Dist # 3
Tom Gaines
Director of Central Services
tgaines@grantcountywa.gov
4A.
.`.
d � .e
��asax-..w....ro..rwmv���..ewrs•.a:ar�e++*�a.-_.ve.,..-...z....� e++.-�.. :rvevs��.,•�o..e�
"To meet current and future needs, serving together with public and private entities, while fostering a respectful and successful work environment"