Loading...
HomeMy WebLinkAboutPolicies - BOCC (002)Grant County Personnel Policy 1602.01 Procurement of materials, supplies, equipment, goods, and senq*ces (public Nvorks) Processes 41 - The follo�ving guide created to help those in the County who perform procurement of any through the various processes the County has adopted to procure materials goods, and services. While following these guidelines one should go back, to the general procurement section of this policy to help 'in the decision-making process and the public worlc-s contracting process. This guide is not meant to be the absolute authori" ty for procurement. It is a living document that may change based on legislative changes, policy changes, and input from those that perform procurement of any kind for the County, Changes to this police should be reNdewed by the Directors of Central. Services and/or Public Works, then sent to the BOCC and Human Resources for approval and publication. Anyone performing procurement should always research the Revised Code of Washington (R W), the Washington Administrative Code (WAC) and other official publications directing the work of procurement by Counties in Washington State. This policy may be updated from time to time. If you perform procurement for Grant County, your engagement in this process is valued, and important. Share changes andi.deas With others thatperform these same tasks to ensure all of Grant County isfolloNYing the procurement guidelines as established while building efficiency and ' steward they can be With the public funds. performas the best ing 1602.02 Before you start Grant County Personnel Policy Page 1 Of 23 Grant County Personnel Policy All public iemrks protects in Grant County require the selected contractor to oJ pay at least the "pre -\,railing wage." If performing a. formal bid process and by formal, the intent is that your department is publishing a bid to the MRSC roster for a public work or in the paper of record or regardless of publication i,Nrill hold a bid opening, and subject to that bid opening, award a public works project to a responsible bidder, you should at a minimum have the follo�1�ring. the time and place where. bids will be opened. 00 the time after which bids will not be received. the materials,, equ* me t, or supplies, to be purchased.; and ip __ I that the specifications. maybeseei -1 atthe office of the clerk of the county legislative authority (or a location as specified by your department) There are two different. that that speak- to the time a bid must be pub! shed 1 one Is 13 days and the other 15. 15 days is the -amount of time Central Services typically utilizes, ensure you understand the RCWs for your procurement, 1602.03 Requests Requests and approvals are performed through the established "consent" process and are not immediate. Departments requesting purcbases above $5000.0o, and/or approval of public works or any purchase not previously approved shall perform the fol.lo * ng. a) During the budget process, ascertain all projects you believe to be require- d - for the upcoming year. Attempt to be as accurate as s possible with the expected costs of purchases and projects and add them to the cap* it al Outlay requests as required through 'instructions during the budget process and submitting them for approval, 1) Simultaneously cheek to see if the capital purchases or projects need to be includedi in the Capital Facilities Plan, while doing so, nspect that list for anything I no longer required or that has been completed and 'notify the Development Services designee so it may be corrected on the CFP. 2) After the budge- has been approved, verify all projects/purchases were included and prepare "Requests for Bids/Proposal /Qu lifcations/ Quotes' as needed. If your purchases require the coordination of other departments, coordinate their purchase or installation pith them directly. (a) No department is authorized to purchase or procure technology related items or software without first conferring with Central Serv` ices and the technology services 0. department. Departmeni ts must keeT) n mind that many software vendors require ongoing licensing that must be accounted for in each year's budget. Grant County Personnel Policy Page 2 Of 23 Grant County Personnel Policy (b) If making any purchase that requires secondary approval from the Board of County Commissioners {Bo ) the EO/DH should submit a letter on department letterhead to the Clerk of the Board with the folio fin for submission on the next weelrs BOCC Consent Agenda. The deadline for adding items to the BOCC Consent Agendais any Thursday 10 by1:2pM (noon) or as otherwise directed by the Clerk of the Board. Reason for request and type of purchase (2)Whether it is or i's not a public wort (3) Whether it is a service or a lease (Information may not need to be included) (4) Which method ofprocurement is intended to be used from15- 04-06 (2) (5) Whether you.are performing an RFB/RFP/RFQ/ or informal nformal quotes (6) ldentifyy the ftinding source-. dur" approved in (C) If g the Consent Agenda, perform the purchase if nothing else is required. If any, advertisement for bid or roster process is re . quired., after complet 'Ing the process another letter shall be -provided through the same consent process )A4th the following information., W Describe the type of process that -was performed and if it Nvas or Navas not successful. (2)The number of responsive submissions that meet all 0 1 requirements, of bidder responsibility as per RCW 39-04-350. (3) The names and. nd amounts for each responsive submission. (4) The recommendation to, or not to award the worlz, or purchase,, (d) Departments should be ready at this time toprovide a contract to the Contractor or a purchase order to the vendor if required. If providing a contract, have the contract signed by the contractor first, then pro -Ode to the civil -prosecutor for approval where it will then be forvarded to the BOC C for signature. (e) Complete your purchase or project, RCWs, regarding the process of completing a Public Work are specific and will be discussed 'in further detail later in thispolicy. 1602.04 Purchases from Amazon Grant County enjoys the use of a County wide Amazon account maintained by Central Services. Each department has their own departmental logon and can make purchases and have them delivered to the Courthouse or where your Grant County Personnel Policy Page 3 Of 23 Grant County Personnel Policy 6 , a county business requires it. It is not a membership for movies, music, or for personal use. No Countyemployee should ani - ny personal items shipped to the County or use the County Amazon account for personal purchases. There is the possibility of disciplinary action if the Amazon account is being used for personal. use. If you need to utilize this account, your EO/DH should have the information needed as they administer the accounts for their departments. 1602.05 Purchases from the Vendor Roster RCW 36.3 2.245 and 39.04.190 sets out advertising requirements for the purchase of materials, equipment, or supplies in all counties. Grant County includes, the minimum as per RCW but also adds requirements. If the purchase is between $io,000 and $50,000 A request to at least 3 vendors on the vendor roster at least once, 13 days prior to the final date for receiving bids and must state, 0 the time and, place where bids will be opened. o the time after which bids will not be receiVed. a the materials, equipinent, or supplies, to be purchased; and o that the specifications may be seen at the office of the clerk of the county legislative authority or a location as specified by your department) 0 if the purchase is over $50,000, you must publish it in the -paper of record, you can still use the vendor roster, but you must take this extra step. 1) Quotes should be inclus f all costs including tax and be a lump IV e o SUM. 2) Departments or representatives. will not inform a vendor of other vendors quote, 3) A written record shall be made by the County representative of each vendor's quote on the materials, supplies, or equipment, and of any conditions imposed on the quote by such vendor. It 4) All the quotes shall be collected and presented at the same time to the appropriate designee as appropriate for consideration, determination of the lowest responsible vendor and award ofpurchase. believe * 5) Whenever there is a reason to Detieve that the lowest acceptable quote is not the best price obtainable, all quotes may be rejected, and the County may obtain new quotes or enter direct negotiations to achieve the best possible price. In this case, the department shall document, in writing, the basis upon which the determinat * ion was made for the award, 1602.o6 To r if you are going to make a purchase between $10,000450,000. Write an invitation to submit a price for your intended purchase on your department letterhead, include the information as stated above as needed, select the appropriate vendors, and publish your request. If you do not have Grant County Personnel Policy Page 4 Of 23 r-4 urant County Personnel Policy any vendors on the list that can supply your need, mail it to all vendors. Do your best to try and get 3 quotes. Try to use local companies. When the date and time arrives for opening any submitted -proposals, see if they are wi'thin VoUr budgeted expectations, if secondary BO -CC approval 1 0 red it should 9 s re have been provided prior to the advertisement. If it is above your budgeted expectation,, ascertain why, is it $1o.0o or $i0000 above your expectation? a) If it is well above' expected amount, decide on the possibility of rejecting all bids be realistic n th your budget amount, your department. should have a good idea of the cost -prior to requesting submittals, b) If the price is in keeping with industry standards, is competitive and a department was mistaken on its estimate? Try to ensure itisa good and fair price for the project orpurchase, if "t is found to be a good rice and it p is above your budgeted amount.? Submit a request to the BOCC through the consent process,, explain the discrepancy and the. cost, identify where you. plan on procuring funds from your budget or request a budget extension and request BOCC approval for thebase. purc c) If no vendors provide a submission, you may directly negotiate -vvi -le th tl vendor of your choice however, you must perform your due diligence and ensure the County i's receiving this purchase at a fair price, compet♦ itive with mark et conditions. rote efforts and keep in a file with. tIhe purchase documents. 1602.07 Determining the Lowest Responsible Vendor IF The following factors, in. addition to price, may be taken into consideration by 4 the Countyin determining the lowest responsible vendor. These criteria shall also apply in selecting products or services either offered "th, or associated wi indirectly with, Countyprograms or facilities. a) Any preferences pro vi ded. by la to localproducts or vendors. b) The ability, capability, and skill of the vendor top erform the contract. c) The character, Tnte,rity, reputation, judgment, experience, and efficiencv of the vendor d) Whether the vendor can perform the contract within the time specified e) The quality or performance of previous contracts or services f) The previous and existing compliance by the vendor With laws relating to the contract. g) Life Cycle Costing-. in considering the purchase of materials, equipment, Supplies whenever there is a reason to believe that applying the "life cycle costing" method of quote evaluation would result 'in the lowest total cost to the Countv, first consideration shall begiven to purchases with the to V life cycle cost which complies-M*th the specifications. b) Recycled Products.- The Count shall also seek to maximize the purchase of products using recycled. materials and products suitable for recycling Grant County Personnel Policy Page 5 Of 23 *Iffra,nt County Personnel Policy It i unless the purchase ,All result in an unreasonable increase n price or degradation of quality or performance over comparable products, 16O2.o8 Informal Competitive quotes.- up to $io,000 a) A County representative shall try to contact at least three vendors. The -number of vendors contacted maybe reduced If the 'item being sought is only available from a smaller number of vendors. When fewer than three quotes are requested or if there are fewer than three replies, an explanation shall be placed in the procurement file, b) Whenever possible, quotes will be solicited on a lump sum or fixed unit price basis, c) At the time quotes are solicited, the County representativeshall not inform a vendor of any other vendor's quote. d) A written. record shall be made by the County representative of each vendor's quote on the materials, supplies, or equipment, and of an s y conditio * I I P." n imposed on the quote by such vendor. e) All the quotes shall be collected and presented at the same time to the 0, appropriate designee as appropriate for consideration, determination of the lowest responsible vendor and award of purchase. f) Whenever there is a reason to believe that the lowest acceptableqnote is not. the best price obtainable, all quotes may be rejected, and the County may obtain new quotes or enter 'Into direct negotiations to achieve the best possible price, In this case, the department shall document, in writing, the I # I basis upon wnien the determination was made for the award. 1602.09 Public World: RCW 36,32.250 sets out the advertising requirements for the 0 i p-Liblic works bidding process n our County. Advertisements for bids should contain speciffications and procedures for bidders to use in estimating their b ids. At a minimum, a bid -notice for a public NN;rorR should include the 4 following items, * the time and place where bids will be opened. o the time after which bids Will not be received. 0 the character of the work to be done., 9 the materials and equipment to be furnished: and e that specifications for the project may be seen at the office of the clerk of the county legislative authority (or at a place that is specified). o A statement that a public agency cannot accept a bid as responsive without a bid bond. A copy of the prevailing wage rates with the date key code the same as the date the bid Is published. Grant County Personnel Policy Page 6 Of 23 Grant County Personnel Policy There are many facets to procuringa public Nivork not outlined here. The process ofit�Tritin a bid., im4ting the public to rov"de a submittal for goods or services, and the processes behind these documents can involve a great amount of risk. to the County. one performi� this process should be aware of the requirements for bonds, (performance, payment, bid), for the insurance requirements of the County, of hold harmless agreements, and other issues that are important to include in documents that are beim published. There � are many examples of these on the County website. Do not imply eat end paste into your own document and expect that it 'is correct. Anyone performing this process should u.nd.erstand each line in the documents the publish to the public and the risks involved 'in not perform Iin this In a correct manner., The following processes were compiled. by the Central Services Director and reviewed by the .public Works Director. There are differences between the �tpublic works" performed through Central services and f� public Arorlrsx' performed through the Public Works department including some state laws. The follow ing process'"chile detailed are not exact. If one has questions or concerns, they should reach out to either of the Directors of those departments or the Civil Prosecuting .ttorne for Grant County. For the following dollar thresholds, there are differences in how and where you report them, how the projects are maria ed and how our agency is required to communicate with the public. The following thresholds assume the use of the: MRSC roster. Grant Count,r i's statutorily authorized to dispense with public bidding, what does this near, It means we utilize the MRSC roster to advertise for p ublic works and that under the conditions In 1504.34 eve do not advertise to the public unless a public work is valued over $350,000. what is required is that after a bid opening of a project published to the roster, the opening log sheet is open to public inspection.. a) after the bid opening, copy the bid opening log sheet and send (through a Spice -works request, along with the original bid document (RIFB/P/Q) to GOTS and ask that it be posted under the correct header on the County web site. (header being request for bids, proposals, or qualifications) 1602.10 $350,000 value or greater For any public work expected to be above this amount, an advertisement i s required in the paper of record. If you are unsure whicha er that is you may p p �y y ask the staff of the BOCC office. You should also past it on the County website. You may also publish your bid to members of the MRSC roster. Remember we desire to have numerous contractors roe 'ding submissions so we may y evaluate the best value or lowest responsible bidder for the. project. Except in rare instances, we are required by law to accept the bid from the lowest responsible bidder, not the best 'value". dor those instances lease con p salt with either the Director of Central Services or the Director of Public Works. As Grant County Personnel Police Page 7 of 23 0 %arant County Personnel Policy practice for proects i size yogi also elect to publish your bid to a jof phis siu m statewide "plan centers" for the Widest possible distribution. Your bid document should be very complete, Nvith a detailed. scope, an An engineer's estimate of the cost of the project, and all the folloJ*ng items should be placed in your document. at a mini IMUM (This list is not in. a specific order) 0 Who is requesting the bid? a Time and Date of the Public bid opening e A statement providing the obj ective of the bid. a A statement regarding the requirement or lack thereof of a site wall, -,through or meeting'"rith the County. e Instructions for Bonds and *insurance with the statement of the required timing of these document S. Instructions for the cover letter that is required and. the exPectations of how the, bid form shall be filled Out. 0 Checklist of those items required for a proper bid submittal, a The process for Bid protests, Bid wi'thdrawal, Responsive or non- responsive bids. A statement as to how the bids will be evaluated, that mathematical corrections rn-ay be made and that we NNTIRI award to the lowest responsible bidder. A statement that the bid. opening is an initial opening, and the award wi11 not be made until. the bids have been full yevabated and vN Then that will be completed, e A detailed scope of work with clear expectations 0 A deadline for when any technical questions can be received and when all questions Will be answered., 0 Hold harmless statement. A statement that Grant County re erns the right to reject any and all bids for any reason. * A copy of the proposed contract 0 Statement explaining how the County lArill pay the contract. o Any engineering data that has been prepared for the bid. o Any supplemental information such as maps, locations, specifications for equipment or other se. 0 Statement inviting minority, veteran, women owned businesses. Grant County Personnel Policy Page 8 Of 23 0 Grant County Personnel Policy Any security requirements or special conditions that may be present for a contractor to perform their work. Timing of the work, if it Will require weekends, holidays, nights, or expected overtime, A copy of the prevailing wage rates with a date keycode equal to the day of .k your bid publication. 1) In the spirit of attemting to receive the best price select as many p appropriate contractors as possible (or all in a category) on the MRSC roster and publish via email to those contractors- as well as thepaper of record. The advert" se dent in. the paper of record should be kept short and direct anyone reading it to the place where they can download the documents. (Example), "Grant County is inviting all 41 interested, appropriate and. le firms to ubm it b * d for n responsib s I s contract. #XXXXV the building of aWi idget factory in Ephrata WA. To download all bid documents and ask questions please visit, wv"v. grantcountywa. gov/ request for bids, or proposals, or qualifications (Whatever it may be) These bids must run for a minimum Of 13 days (not including the bid publication date-) prior to opening. In the paper of record this advertisement must run at least once 13 days prior to the bid openincr date, not including the publication date. 2) Departments should keep a detailed "questions and answers" log during the bid process. Stipulate in your did. document how these'"411 be handled. Typically, there is a deadline for when these questions can be received and a stated date when all will be answered, Central Services as an example, anon ymizes the questions and responds to these questions as quickly as possible and sends them out to all who received the original bid. Unless a contractor specifically states they do not wish to receive them, you must send it to all contractors on your list. At the deadline for submitting questions one last log is sent t en out with the notice that the questionperiod has ended and no further questions regarding, a project or a purchase will be answered, you may always answer questions regarding the bid process itself. You. cannot answer any question that would provide an advantage to any one contractor over another. 3) Keep a file of the Bid, the advertisement in the paper of record, the list of contractors selected, if narrowed, also keep the narrowed list of contractors, the question -and -answer log, and all pertinent communications with any contractor regarding your bid. All pertinent project inform'ation such as the contract, bid bond, insurance certificate, P&P bonds if required. Remember, there are differing retention schedules for documents of winning and losing bidders. 4) :fold your bid opening at the appointed time and place, record the bid opening on a bid. opening log sheet your department creates. Grant County Personnel Policy Page 9 Of 23 ,3rant County Personnel Policy somewhere on your log sheet you may. wrIite "Apparent loNv bidder" based on the initial bid opening. The bid opening shall be immediately available by phone or electronic request and the log sheet sent to GCTs (through a Spiceworks request) for publication on. the County website ,vNith1*1124 hours of the opening. 5) Fully evaluate your bids, ensure all your contractors are responsive. Dict they meet the responsible bidder criteria and supplemental criteria as laid out in RCW 39.04-350? Did they include all documents as required? If you are insure as to material orIm aterial irregularities, consult the civil prosecuting attorney. If all bids are in order, select the lowest responsive bidder and submit a letter to the BOCC iA4th your departments recommendation to award the project to said contractor. Simultaneously, inform all bidders of the intent to award to said. contr ctor by email or phone or by direct communication., also In the sane notice if sent electronically, state the names of any contractor that was non-responsive, you do not need to state the. reason shy., youmay do this directly �� th the contractor in a separate notification or phone conversation. 7) If you deem a contractor non-responsive, you need to inform them immediately, this action may cause the contractor to file a bid protest if the contractor does not agree, thus typically the contractor is informed as soon as practical as bid protest are typ ically required within 24 hours or as per the instruction is your bid document) If there are no protests and the BOCC has signed your .recommendation, you may enter a contract with. the . selected contractor. To do this you should in a :tici ation. of a -warding to said. �_ g contractor, have been adding the pertinent information to the proposed contract 'included in the bid. document. Ensure all required items of the contract are correct. If questions arise regarding the contract, seek the advice of the civil prosecutor's office. have the contractor sign the contract and return it to you, turn this contract over to the civil prosecutor's office for review and for their approval as to form., the prosecutor will notify you that it is approved and send at to the BOCC for signature. once signed., send to the Contractor and you have a fully formed contract". Keep a copy on file with the bid documents and provide the original to the Administrative services Coordinator in the BOCC office for inclusion into their records. The contractor shall as soon as possible, provide a certificate of insurance as described in your bid and provide PP Fonds if required.. The Contractor also must file an "intent to Pay prevailing wage" dth. L I. A, g contractor generally should not start work until the intent is approved by L&I. You can track this in your L&I portal. 9) Perform your project, understand the retention schedule, communicate any financial needs early and often, if any action such as budget Grant County Personnel Policy Page to of 23 %.ffrant County Personnel Policy transfers o, r* extensions will be required you will need to do those expectitiously. Understand retention of your documents. Understand the need for reporting to Labor and Industries (LSI), notice of completions, (NON), certified payroll reporting, intents & affidavits and how to communicate with LI through the LI portal. 0-.0 lo) Remember to budget for retention if retention -vvill not be paid during the current fiscal year. For u"dance on this, contact the Accounting. department. Understand the process for Aig's if -utilizing grant funds. Understand the needs for grant tracking if utilizing grant funds for your project. 1602.11 Project Values $0.00-$350,000 RCW 39,04.155 stipulates the process for project within dollar s the following limits. Although it is printed here, best practicewould be to apply the same guidance as in the section above, although it 'I's only required that we follow the Raw a.s stated. a) There is, no need to publish a project writhin these dollar values in the paper of record OR on the CountY web site if utilizing the MR SC roster if you are notutilizing the roster, it shall be placed on the web site and in the paper of record, b) In the spirit of attempting to receive the best price, select as many appropriate contractors as possible (or all in a category) on the MRSC roster and publish. -via email to those contractors. You. -may elect to only publish your request to five (5) appropriate contractors., but you shall be fair and equitable, in. your distribution of bids. In other words, if you select 5 contractors to bid on 4 steel building (for example), the next steel building cannot be published only to the same 5 contractors, you may invite them again however, you must invite others for a fair and equitable process, c) Keep a file of the Bid, the list of contractors selected, if narrowed, also keep the narrowed list of contractors, the question -and -answer log as in the section above and all pertinentcomm unications * with any contractor regarding your bid. All pertinent project information such as the contract, bid bond, insurance certificate, P&P bonds if required. d) Follow sections (i) through (x) as above. 160 2.12 Limited Public Works Process for projects less than $50,000 In lieu of awarding contracts under the previous section, Granit County may award a contract for work, construction, alteration, repair, or improvement projects estimated to cost less than fifty thousand dollars using the limited public works process found in RCW 39.04-155 (3). For limited public worl.,,-s projects, your department shall solicit electronic or written quotations from a minimum of three contractors from the appropriate small works roster and shall award the contract to the lowest responsible bidder as defined under RCW .04-o .o. For this process you should follow the sameprocess as stated Grant County Personnel Policy Page 11 Of 23 Grant County Personnel Policy 0 in 1504 (a.) and (b) above. After an award is made, the quotations shall be open to public inspection and available by electronic request. You mu- st, equitably distribute opportunities for limited public works projects among contractors willing to perform in the geographic area of the work. As Per RCW 3 9.04. 0 10, Grant County shall maintain a I ist of the contractors contacted and the contracts awarded as limited public works, projects during the previous twenty-four months. under the lim*it edi)-abl"clATorl'-'s process, including, • The name of t1ae contractor, • The contractor's registration number, e The amount of the contract, a A brief description of the type of work performed, 0 The date the contract was awarded. Departments utilizing this process should (if desired) report these projects to the Director of Central Services where a list vvNill be maintained on the Central, Ser-vices'web page. If electing not to report, all items shall be Re* t by the p department performing the work. For limited public works projects, a state agency or authorized local government may waive the payment and performance bond requirements of RCW 39. o8 and may waive the retainage requirements of RCC 6o.28.oii(i)(a), thereby assuming the liability for the contractor's non-payment of laborers, mechanics-, subcontractors, mater alpBr ons, suppliers, and taxes, increases, and penalties imposed under Titles 50, 51, and 8:2 RCW that may be due from the contractor for the limitedpublicWO rRs project, however the state agency or authorized local government shall have the right of recovery against the contractor for anypayments made on the contractor's behalf. 1602.13 Accepting a Bid and understanding what a. Responsible Bidder Is (The following is from MRSC) -1--% * ? 1602.13-01 What is a Responsi've.Bid.. Responsive bids are bids that are :s bmitted on time With all of the information the agency requested. Agencies should. i'dentify in the bid documents an official bidding clock located in the room where the bids will be opened. This clock should be checked on a bid opening day to verify 'its accuracy, Bids submitted after the submittal deadline or at the wrong it location should be rejected as non-responsivei — n other words, agencies should neither accept nor open late bids. If a contractor claims extenuating circumstances, refer them to your agency's attorney, Grant County Personnel Policy Page 12 Of 23 urant County Personnel Policy Typically, bidders must provide the following information at the time of bidding" * Sealed bids,,"fth the name of the project and the time and date of the bid opening clearly stated on the outside of the, bid packet. * Bid guarantee in the form of a bid bond, cashier's check, certified check, or personal. money order. * Lump sums, unit prices, and total prices in the spaces provided on all of the bid forms, i cludi ng all appropr ate in sales taxes, * Receipt of addenda -acknowledged. * Acknowledgment of attendance at mandatory pre-bid meeting, if so required by the agency (agency to verify). (Deciding to require a mandatory pre-bid meeting should be evaluated for each project based on thep articular circumst ances of the prof Ject. Such process should then be mana,ged very carefully.) * Non -collusion affidavit certificate * Mandatory bidder responsibility questionnaire with all items filled in, while it is possible to do a brief check when the bids are first opened, the agency must reserve the right to ascertain full compliance with the bid proposal. requirements after a more detailed review. Additional items max be required shortly after bid opening: • If supplemental bidder responsibility criteria are require, (see below), a separate questionnaire must be, filled out and submitted within 72hours after bid opening. However, this questionnaire should only be required of the apparent low bidder and the next two lowest bidders. • For projects that cost an estimated $i million oar .more, a list of all subcontractors for HVAC, plumbing, or electrical work must be submitted (RCW 39.30.o6o). The bidder may also submit itself for any of these categories. This list may either be submitted within one hour after the bid opening (the preferred method) or at the time the bid is submitted. 1602.13-02 What is a Responsible Bidder? Responsible bidders, as defined in RCVS 39.04.olo and 39 .04- , must meet a number of mandatory criteria. The 350 bidder must. - Grant County Personnel Policy Page 13 Of 23 Grant County Personnel Policy 9 Be a registered co-ntr* actor. a Have a current Unified Business Identifier (UBI) number Have industrial insurance/-vvorkers'comp coverage, which means they normally cannot be sued for damages if a work- related*injury or illness occurs. For more details, see L&I's publication Employers' Guide to Workers' Compen n satio Insurance in Washington State. a Have an Employment Security Department (ESD) account it e Have a state excise tax registration number e Not be disqualified from. bidding under RCW 9.o .oto or 39.12.o65(3) e Not have any apprenticeship violations, if applicable Effective JY 23, 2017* Certify through a sworn statement or an unsworn declaration under penalty of perjury that they are not a -Mllful violator of labor laws in reference to RCW 49,48.o82 within thee three years, MR SC has developed a model statement (d.oc ) to satisfy this requirement. We updated this form inAlly 2019 to reflect SSB 50174 Effective July 1., 2o:tg: Have received training, provided by the Department of Labor and1ndustries or b a provder y i whose curriculum has been approved by L&,I, on the requirements related to public worlrs andprevailing wages. However, bidders that have completed three or more public works projects and maintained a valid business license in Washington for at: least three years are exempt from this 4? requirement, 160 .13.0 Verifying Responsible Bidder Status The certification that the bidder has not violated labor laws in the last three years is the i on y criteria I that may be satisfied by a sworn statement. All other criteria must be verified by the agency, except for the ESD number which cannot be verified online and must be provided by the bidder. However, pt iblic, agencies may ask bidders to submit a Bidder Information sheet to help verify these criteria. State agencies provide several resources to verify the status of a contractor: Verify a Contractor, Tradesperson or Business provides information about every registered. contractor, including the U number, status of the industrial 'insurance/workers comp account., and contractor training status, Grant County Personnel Policy Page 14 Of 23 1*1 *,.ffrant County Personnel Polie'l 9 Debarred Contractors List provides a list of contractors disqualified from bidding-. Print out the search results and keep them in the project file. o Check Status of a Bus* iness, or Professional License verified an active Department of Revenue tax registration. e Employment Security Department regulations do not allow Online verification of a contractor's ESD account. To verifv the account., agencies may request a Bid Letter or requi the contractor to file the account number with the agency as part of a bid submittal or small works roster application. 1602.13-04 Retainage Grant County is required to hold retainage for public worRs projects. Retainage laws require the County to withhold 5% of a contract value and we cannot pa that retainage until certain -A� IV conditions are net. For contracts over $35,000 Grant Countv is required to file a Notice of Completion" (No ) i Thi's is found and completed through the L portal. You cannot file an NOC until the Contractor has filed all affidavits of wages paid. If there were subcontractors on, the project, they too, are required to file affidavits of wages paid, -until all are filed, the County is not allowed to begin. the process. (the form is unavalia'131e untilthese items by thecontractors are compm leted). Once you subit the NOC5 it sent to the Department of Revenue (Doi:), to L&I, andto the Employment SecLiritiesepa rtmu ent (ESDYocannot pay retainage to the Contractor until you have received a. letter from each of those agencies stating it is OK to release the funds'. The letters are haphazard, some coming to email, some to the HR department, to public Works, or to another County department. Be attentive to your Contractors needs and remind yourself to check on the NOC status by on to the LI portal or calling the other two agencies and checking the status of the NOC. Th.'s retainage process is tricky requirement, RCVS 6o.28.011(3). (a) states the folloAdng: "After completion of all contract work other than landscaping, the contractor may request that the public body release and pay in fall the amounts retained during the performance of the contract, and sixty days thereafter the public boder must release and pay in full the amounts retained (other than continuing retention of five percent of the moneys earned for landscaping) subject to the provisions of RCC 39-12 and this chapter". Grant County Personnel Policy Page 15 Of 23 Grant Coun-ty Personnel Poli CY "Furthermore 60.28.0ll (3) (b) Sixty days after completion of all contract work the public body must release and pay in full the amounts retained during the performance of the contract subject to the proNrisions of chapter BCW 39.12and this chapter". 'Phis is tricky why? because after the filing of an NOC, ESD has stated that they will only proNlide letters to public agencies for the release of retained ffinds on a quarterly basis. S*ometimes they are released quickly but this statement by ESD equals a go day period, so what do you do? Grant County has experienced lengthy delays not only due to this ESD policy, but at times that same department was overwhelmed Mth requests and shorthanded causing longer delays. If this occurs, work directly with the Contractor, communicate openly and often, contact ESD and remind them of the 60 -day requirement, do your part by, a Remind the Contractor that although the work has been accepted, that you are unable to file an TOC and begin process of paying retainage unless all affidavits are filed. If the work has been accepted, the RCW states that this is the beginning of a. 6o -day V%n*ndoiNr, but it maybe 3o days or more before ALL contractors file their affidaAts making the 6o -day requirement all lout impossible, e Be complete with your repo rd1reeping, do not be the reason the NOC is delayed. There is no R. that provides an exception to waiting for the releases froom. these agencies. RCW 39.o8.o10 (3) On. contracts of one hundred fifty thousand dollars or less, at the option of the contractor or the general contractor/construction manager as defined in RCW 39-10.210, the respective -public entity may, in lieu. of the bond, retain ten percent of the contract amount for a period of thirty days of date of final acceptance, or until receipt of all necessary releases from the department of revenue, the employment security department, and the department of labor and 'Industries and settlement of any liens filed. under chapter 60.28 RCW, whichever is later. The recovery of unpa * d wages. and benefits must be the first priority for any actions filed against retainage held by a state agency or authorized local government. The requirements remain regarding the filing of NOCs, all public works projects require intents and affidavits reg ari ffless, the advantage here is that we dei not have to wait for the release from the three agencies. When they do arrive, file them inyour Grant County Personnel Policy Page 16 Of 23 urant County Personnel Policy project folder. just remember, this is for a public lArorks project valued at less than $150,000. **Reminder, e1 1 . ou a project and ���d retainage ��'the end of the fiscal year, budget the retainage in the net ear's budget, Grant County Personnel Policy Page 17 of 23 Grant County Personnel Policy Below is helpful chart found on the MRS C website that -oroN-qdes cmidance on holding and paving retainaze. Pr9Ject Closure/Retaina, -,re Release Guidelines. adapted -from MRSC 3/1/2021 -------------- Require in Contract Needed for Project Closeout Files (also see note i) (Before Releasing Retainage) (Also See Note 6) ContractAniount Performance & Payment Bon -ds Retainage Sales and/or Uw. Taxes (Department Prevailing Wage (L&I) Industrial Insurance (L&I) Employ,nient Security Tayes CE, SD) of Revenue) Over $,35,.000 Yes Yes NOC & DOR Release Intent & Affidavit NOC & Ind. Ins. Cer tification NOC & Certificate of (See Note 4) (See Note 4.) (See Note 4) ' ent PAyui See Note 4) $50,000 or less, Ifinited public Call Waive 'Carl Waive Not Required Intent &Affidavit Not Required Not Required lvor�-s process (See Note,-) &, 5) (See Note 2 & 5) (See Note 4) (See Note 4 &5) (See Note 4) (See Note 4) $150,000 Or less .Can Waive (See Note 3) i o %. Ret a i nage, (See Note 3) Not required for pr I oJects less than - Intent & Affidavit (See Note 4) Not required for projects less Not required for projects less than $35,000 than $35,00o $35,000 $2,5oo or les's may not be needed Mav- not. be needed Not Required Small. Works Form (See Note Not ReqUired Not Required (See Note 7) (See Note 7) ,5,) Note 1: Contract documents must require that prevailing wages must and must contain the, prevailing wage applicable to the project, regardless of 01 the contract amount, Note 2' RCW 39,04-155 (3) allO 9 I �_Vs a local government to waive the payment and performance bonds requir�ei ents of RG n,08 and the retaitia- 6 requirements of RCUI 6o. 8. TO LlSc� this limited public xvorks process, an authorized local governnient must solicit electronic; or Written quotations -from a miniMU111 Of 3 contractors from the appropHate small works roster. A small works roster Locess is required. Note 3: RMr 39.08.0to states that on. contracts Of S.,150,()()0 or less at the option of the contractor, the agency may., in lieu of performance & paynient 'bond retain to% of the contract amount fora pelliod of 1,io days after, final accetanceofthe oiect. p _pr J Note 44 For contracts over $35,000 ag'ClIVY files a Notice of Completion (NC C) through L&I this xvill be sent to DOR/ESD/and L&I from Nvhichyou %ill receive a certificate of pqy tnent of excise tax from DOR (DOR may also demand. ptkynieiit for unpaid excise tax on other projeicts per chapter 49.3, 2oog session law,;}, a letter off release froniURT from liability for industrial insurance premiums foi- the project (I.&I may also demand payment as DOR inay ,demand) anda certificate of payment of employment security contributions, penalties, & interest and like DOR and U-1, ma�y demand pa'Anent.on other Pr9jects,L)er Cha)ter 423, 2o I og session laws. Note 5: RM39-192-04.0 (2) allows the local go-vernment agency to process combined intent and affidax-it short forins and forw t rd LM 'monthly, them to onthly, If the agency chooses not to do this see note 4. Chapter i2io, '2007 laws allow use of this form for contracts up to $85,000 if RCW 39.04-155(3) is followed. (now $50,000) Note 6: RQW 6o.,�)_8.oii *(3) (b) states that 6o days after completion of all contract work the public bod-y must release and pay in full the amounts retained during the performance of the contract subject to the proxisions of RCWs 39.12 & 6o.28. Therefore, an agency should release reattained funds, less the amount of any claims by laborers, suppliers, and subcontractors. at the end of 6a days to avoid possible ramifications under the Prompt Pay Act (RCW 39.76).Jf certificates from DO.R, ESD, and -approved affidavits from. L&I per note 4 are not avrailable at the time, contact the prosecuting attorney's office for direction, Note. 7: unless an, agency waives bonding and/or retainage (B/R) under the notes 2 & 3 scenario. both are theoretically required, even for' etw small projects,. Hoikeveras a practical matter, payment for small projects is usually well after completion and -in effect -there is a look retainage for 2-4 weeRs, so there is very little risk if anagency does not require B/R. Be sure, as 111LIch as practical that suppliers have been paid and that an approved affidavrit of w' -ages paid from the contractor is, on file, ------ ---- 0 1602-13. 5 Concerning "Limited Public Works" projects-, At the time of the creation of this guide, no law has been found regarding a Limited public works project and a requirement that it be to a single contractor with no sub -contractors, and that the contract be paid in a single lump sum. However, when filing combined forms through your L&I portal, you will find that when you fill out a combined form it states it can only be used for projects that have the following, (a) A single contractor with no sub -contractors up to$50,000 L (b) While communicating directly with L&I they will state that it must be paid in a single lump SUM. If while performing public works and you run into this issue, consider doing the following. (a) If filling out a combined form, follow the guidance as suggested by L&I Grant County Personnel Policy Page 18 Of 23 �V Grant County Personnel Poli ey (b) If the contractor has sub -contractors, and the cost of the project is below $50,000 and you plan to waive retainage and P&P bonds, simply fill out a standard NO . The previous paragraphs have detailed the processes for purchasing. 0 Below $1o,000 Between.$10,00o and $50,,000 Public works contracts above $350,000 Public works contracts below $350,000 0 The limited public works process for projects below $50,000 0 Dealing with retainage, contracts and communcating with the Board of County Commissioners 0 1602 The following guidance is regarding Interlocal Agreements (Piggibae-k-ing), .14 b State Contracts,, and Cooper ative, Purchasing Contracts. 0 a) Definitions (followed by process recommendations),, 1) Interlocal Agreement,* As per RCW 39.34, the declarative purpose is to permit local. governmental units to make the most efficient use of their powers by enabling them to cooperate with other localities on a basis. of mutual advantage and thereb to p►roNdde services and facilities es in a manner and pursuant to forms of governmental organization that will accord best with geographic, economic, population and other factors influencing the needs and development of local communities. This is commonly Rno n. as It PiggybacRi. * Ing 2) State Contracts:, A Sate contract is a competitively bid contract by Washington States purchasing arm known as "The Department of Enterprise Services" or DES. DES competitively bids contracts and provides these contracts for "Master U*sers" of the DES program. Grant County currently is a Master UserRh DES. wi 3-) Cooperative Purchasing Contracts: (RCW 9.26.o6o) These are contracts let by Joint powers usually from other states that we in Grant. County may use. Not all Cooperative contracts are available, and a list is kept by Central Services and the Administrative Services Coordinator within the BOCC office. At least annuall these purchasin contracts or Y 1 9 agreement should be visited to ensure they are still available or meet our requirements, have not changed substantially (name changes are I..o common) and that we are still considered active users. 4) GSA Contracts: The Government Services Administration maintains thousands of contracts. They are referenced through schedule .numbers. As a County, we can utilize only two. GSA schedules 70 & 84, specific schedules related to technology and law enforcement. Grant County Personnel Policy Page 19 Of 23 f -I kirant County Personnel Policy b) Commonality Statement: Use of any of the following processes all have the following common requirements-, e A competitive bid must have been performed. * The competitive bid and selection process must have been as restrictive or more than our o%,n. You must keep in your purchase or project file all documents of the bid process including the original bid, questions, and agency responses if avalRablescori gsheets summaries, or notes (ifavailable) hick opening log sheets, and all other items pert nent to the purchase or project you are comp I leting should be kept with your project or purchase file. o Any purchase should have been previously approved by the .B0CC. Ensure the Contract is current and will be current at the time of your procurement is being purchased or contract signed. "Important-, a sales representative is trying to do their Job and sell, you may hear about a "state" contract from someone y . ou have contacted, or they may have contacted you directly. It is not uncommonfor a sales representative to NOT know or understand the contract the.. are speaking -"ith you about or to confuse., cooperative contracts, interlocal, and state contracts. It is vital that- Id.ocumyou read, the contract ents and ensure the contract may be used for your purposes. Many times, Central Senlices has found the contracts offered were either incorrect, did not cover the requested item, or had expired.. Due Dili s not a buzz term. p igence i c) Interlocal agreements Process. These are tremendously help * ful; the entire chapter of BCW 39.34 should be reviewed if planning to utilize this procurement vehicle. To review the agreements the County currently has in place, visit the link for "interlocal agreements" on the BOCC intranet page. • If you wish to use an interlocal agreement, you should have already had the purchase or service -approved by the BOCC. • You should ensure that this is the best value for the County. You are required to keep a copy of the contract in the project or procurement file. You should perform your due diligence,, some steps you may take are. i) Call the holder of the contract (Whatever city, county or public agency that may be) and speak with the representative that administers the contract, has it worked, been of value, would they recommend, is it still valid, are they renewing the contract or bidding a new contract and if so? Why, Grant County Personnel Policy Page 20 Of 23 Grant County Personnel Policy 2)Would they please send copies of the contract and bid. documents. review the documents to ensure they have followed our processes or have been more stringent. 3) If the above conditions are satisfactory and you have approval, forward the contract for signature to the BOCC through Consent -"ith a letter stating the work you have performed to get to this decision, that you have reviewed the material con - -CU r -* it " s the b est value for the County, I the cost, the length of the contract if applicable and continue NAth the purchase or service. 4) Keep all records as per the retention schedule for your specific 11 * 0- purchase or service and forward the or contract signed ley Grant Countv, to the Administrative Service Coordinators office. . *F e d) State Contracts The Department of Enterprise Services (DES) is the purchasing arm for the State of Washington. Typically, when utilizing a contract from DES nothing more is required. -than Board approval and the requirements for retaining the contract documents. If you would like to search curren t contract DES administers, simply visit their website and search. Grant County is authorized to use these contracts as a Master Agreement holder. Read the. contract documents page and (typically) there is a statement 40 * regarding who may arse whatever contract you are vie Wing. Currently, Grant County must look to DES first and if a 'contract is NOT found, they may search for the contract on another cooperative purchasing platform, this can include somepUD11C works. 41 You do not always find a contract with DES that fits your requirements and are left to competitively bid whatever purchase you are requesting. Sometimes this can be difficult as you may not fully understand all the facets ofyour procurement and thus be unsure in writing a proper bid document. Because of this, Grant County has authorized the use of some (not all) cooperative purchasing platforms. Their use is details below. e) Cooperative Purchasing Contracts: Cooperative purchasing contracts are extremely useful, when looking to procure materials, goods, and sometimes services, it may be difficult to write a bid document and include everything one needs to be complete, especially if you are untamniar with the product or service you have a need to acquire. Just like DES these, cooperative purchasing programs are competitively bid, and you need to ensure their bid documents, process and contracts were as stringent as ours. They must also be available by re' est the same as any qu other bid document you perform, so you must have them on band. Cooperative purchasing platforms may be led by a state, a county, or association that follows a state's procurement law. You look for contracts on these platforms the same as DES, you verify it is the best value for the County Grant County Personnel Policy Page 21 Of 23 Grant County Personnel Policy and that you cannot bv performi .g the work yourself, provide the County - NN th a better outcome. The point of using these is twofold and beth are of equal Importance. You are attempting -to quickly procure needed materials, goods, and services but you also must strive to be the beet steward of the ublic funds you can be. A list of current cooperative purchasing platforms can be found on the Central SerVicesintranet web page. Some of these rewire a username end a word N,Nrhich can be received by contacting Central Services who m anage.s and maintains memberships with these platforms, As with DES you should first have been authorized by the BOCC for the procurement, have performed your due diligence to ensure that a cooperative purchase or DES contract is the best way to procure your needs. Received a copy of all available bid documents, responses, contracts, and any other pertinent information that Will show this was the best value and that it was competitively bid. f) GSA: The GSA. holds thousands of contracts for the federal government and many contracts for states. You will find many contracts that have excellentp ricins structures, but Counties in Washington State are only allowed to utilize two ve f peclfic (but -Mde ranging) schedules. Schedules 70 & 84 are specific to IT related equipment, soft-v;are, and ser ces, and Law enforcement needs, ranging from weapons to Xray scanning macnine , to vehicles. The largest difference In these contracts is the way they are structured. Typically, one or more vendors has been selected to provide a service, you need to read the contract documents to see if those s lections, were based +gin geographic location or for the purpose of providing a ready supply b � utilizing Pp � g multiple vendors and multiple Supply chains. Most of the contracts are structured in such a way that you do not ever contact the GSA but the vendor directly. The contract documents will lay out specifically what the pricing structure is and what is available, this may include options regarding your procurement. It is structured so that you work directly Avith the vendor to meet your specific needs. All the while, the vendor must honor the pricing structure as documented in the contract. They should also make you aware if any part of your purchase is not covered under the specified contract. Like all other cooperative purchases, it should have first been approved by the Bo C, all bid, and contract documents should. be readily available and kept p with your procurement file, and you should have performed, your due diligence to ensure it is the best price/value for Granit County and: that you have made your purchase in the spirt of being the best steward you can be for the citizens of Grant County. Grant County Personnel Policy page 22 of 23 %.ffrant County Personnel Policy This Aide is intended to help those who procure materials, goods, and serNices. As stated earlier It is not intended to be the "end all be all's of purchasing for Grant County. Many items require nuance, thoughtftil interpretation, and an overarching effoit to procure anything for the County with an. end goal of being the best steward rd. we can be while also building efficiencies within the procurement proceSS. Please be a part of the process, our County has a stated goal to meet current and future needs, serving togetherIATith public and prik7-ate entities, while fostering a respectful and ecce Sful work en ronment. It works better when we work together, Laws f e l urcha, . n and rocure hent of �hlic woiks for Grant noun RCW ffe is Short ans-w-er 36 Counties in General Laws that define our operating procedures as � County. JAY Complete Cha ter 36-132 Goer tars lr ners , 2.'?4 ('4ve do not have central Procurement Creation of Purchasing Department, County _--purchasing) under o ]ulcation pf OO,000 36.32'245 Public Works f Vendor Raster Procurement Com.peti'tive Bids, Requirements, (39.04.190) Advertisements, Exceptions -Bid limit for ',36.32'.2.. 0 Public . i 7 orks Vendor Roster;��.c�,00a- �a,aoo Competitive' Bids: Contract Procedure, Contracts under $40,000, Small "Works Roster Proeess 36-32.280 Public works Procurement Exem tions to competitive bidding 39.04 �. Public' ori � Chapter, r .� Complete O erall chapte=r that defines ho�-v ye perform public works 39-04.010 Public Works, t� k't'l I11tiC3I1S 39:24.105 PublicWorks Bid Protest 39,04-155 (1 PLTI�I c Works Explains MR.SC use ani. $35r�,000 C� Limitation. Also contains reference to Y` yt (+.i.+ $250,,yt"l00-,� 5(),()(),Q. & C,ol7i�tain Limited :i ublic' orks for lessthan $50,000,Speaks to tale followrilzg: Bial splitting, Interlocal agreements, Use of SES, Waiving of retainage and bonds, 39-04.190 Public Works 'vendor Roster Procurement -Purchase contract process --Other than (36 4.1:�I formal sealed h ddin(Vendor Raster) 39.04.2)80 Competitive bidding requirementsACtI1al list of reasons to exempt from a A00 competitive bid process Public Works Bond required, retainage of Contract in lieu. of band. 39.12 7 l Public Works P1reNrailin 39.26.o6o Procurement { Cooperative purchasing 39.30.045 Procurement Purchases from Auctions 39.34.030 Prac:urenlent Joint powers Agreements forioint or cooperative actions, 43,19 Department of Enterprise Services Complete chapter for the adininistration of Dir Not a short answer, numerous sub sections 42-52 Ethics in Public Service o• 3.ot 1(i) (a) Public Works Transportation Projects a l�� Retainage can be Nvaived (With additional (Federal N'lar�ile�) re uirements) 7� ' Polices Grant C oun and J eso�lutions Resohltion car Polio, Administered by Located It -leo, og-o8o-ce Clerk of the Board Establishes procedures Purchasing and Public Works Contracting, Vendor mists P-No.1503.8 Human R.esourews approval thresholds For purchases tivithout BOCC approval p_ O. 1503.92 Human Resources Ca ital Plannin `(CIP) FM1504 Human Resources PLIrcliasiil Policies Grant County Personnel Policy Page �3 0f �3