Loading...
HomeMy WebLinkAboutBid Related - Public WorksMemo Grant County Department of Public Works 124 Enterprise St, S.E. Ephrata, WA 98823 To: Honorable Grant County Board of County Commissioners From: Dave Bren, PE, MSCE County Road Engineer Date: June 29, 2022 Re: Reconstruct Road 3 -NE from U -NE to X -NE (PHASE 4) Project Award Request (CRP #22-01) Serial No. 22.071 Legislative History: Financial Impact: • First Presentation: o July 5, 2022 • Engineers Estimate: $111250 000, • Second Presentation: • Low Bid Amount: $ 1,129,111 • Action Requested: 1. Project Award Motion • Self -Performed BST Work: $ 2009000 Overview The Six Year Transportation Improvement Plan (STIP) includes the Reconstruction of Road 3 - NE from U -NE to X -NE (Attachment A). The work includes the reconstruction of 2.97 miles of two-lane County Road with associated excavation, embankment, culvert crossings, road base, and crushed top course to prepare for a County Installed BST Surface. BST Surface by County Staff: The final BST surface is to be placed by County Staff. The estimated cost is $200,000 for self - performed work on this project. Bid Summary Staff opened bids for the Reconstruction of Road 3 -NE from U -NE to X -NE on June 28111 2022. The County received two bids for the project. Tommer Construction submitted the low bid for the project in the amount of $1,129,111 (Attachment B). The Engineer's Estimate for both contracted ($1,050,000) and self -performed BST saa surface work ($200,000) totaled $1,250,000. Tommer Construction has all licenses in placi -with fv fi— judged to be a responsible bidder per State requirements. To meet current and future needs. serving together with pUblic and privete entifim- while f1,O5tL-,';rn,...ga. ,,rez� vro�k- environment.2' form -a n 754-6082 DaV e. are_nr PE31 Oo unty, Rued Engineer_____ __Ext.. 3502 -.,Ed LCUlly, SUPeniSor-Dist'Na- �L__ 3540 ....... -.(509) '754-6087 Bbb Benan-tif, Con.-sttucti�n,,'Eflr;ginee.i:,�-.---..-...-...:Ext 3503 Mike DeT ra4fo, SU.pe,1ViSDNDiSt.,,ffD. 2— 359,1 pu,,blicwotks@gran,,tcoun,.4,%va.gw 'toc Ohl, Accountant Lead___ E.xt. 3555 John stissey, SuperVisor4)istT4o_ 354-t sani castro, Puibfic 35D4Follett, Rod Forenmn-Sign 357.9 Min Spiess supenisor-centrail 754-6086 Smwel,oarAssistant EA -3519 Jason, collings, Solid waste 754-4319 Fiscal and Policy Implications Much of the planned funding for this project ($698,400) comes from a Rural Arterial Trust Account (RATA) through a 5.25.2021 project agreement Authorized by the CRAB Board (Attachment C). The remainder of the planned funding for this project is to be provided by local County Public Works funding. The low bid is 6.3% over the Engineer's Estimate. It should be noted that June is late in the year to be going out to bids, as contractors have locked in their work for the building season already. We are fortunate to have received the two bids and to have a low bid close to Engineer's Estimate. The higher bid amounts were expected, as agencies around us are reporting higher than expected low bids up to 30% over Engineer's Estimate. Commission Packet Attachment A. Six Year Transportation Improvement Plan (STIP) B. Bid Tabulations C. Rural Arterial Trust Account (RATA) Project Agreement Action Requested Public Works Staff recommends that the Commission Award the Reconstruction of Road 3 -NE from U- NE to X -NE (Phase -4) Project to Tommer Construction in the amount of $1,129,111. Award Letter for 3 -NE Phase 4 Road Reconstruction Project, CRP #22-01 "'To mei et ourre.n:., end fiatur-e ne:e�d's, ze:rving togetht:r with p6h4o and private �e.ntitias. while fos .,ringa. respectful a.nd su0ces. 'ul woi! k e.nvi�ronrr ent. a' .f5) Information .................................................(509) 754-6082 Dave Bren, PE, County Road Engineer .................. Ext. 3502 Ed Lowry, Supervisor -Dist. No. 1 ................................ Ext. 3540 .wfa) FAX...............................................................(509) 754-6087 Bob Bersanti, Construction Engineer .................... Ext. 3503 Mike DeTrolio, Supervisor -Dist. No. 2 ........................ Ext. 3591 !111tc0L E-mail ............................. publicworks@grantcountywa.gov Loc Ohl, Accountant Lead ....................................... Ext. 3555 John Brissey, Supervisor -Dist. No. 3 ........................... Ext. 3541 Sam Castro, Public Works Director ....................Ext. 3504 Rod Follett, Foreman -Sign Shop ............................ Ext. 3579 John Spiess, Supervisor -Central Shop ............. (509) 754-6086 _._..._. Samuel Dart, Assistant Director .........................Ext. 3519 Jason Collings, Solid Waste .......................... (509) 754-4319 Andy Booth, Bridge Supervisor .................................... Ext. 3535 A W W W w �o o Grant C �_ J w 29 N T y; T29 N 6o'Foie sagjp,u m B0 c- #_ T28N ° E T28N „� 59 Aft Y~ UUMV0*10" ----- P58 CSy,»1' N K K H ° 58 .MSB µ�"'r:,:;'Xs98/d 55 55 '�.s_._ .. T28N , T28N R"4aa4®� ®� ® ®� T27 N 53 z s3 54 T 27 N 52 52 51 IVE 50 NE� - w 49 I 49 No. 3 - ADA RAMPS Sidewalk upgrades T27 _ 4e T27N 4e T26 T26N K 4r No. 6- MISCELLANEOUS PROJECTS _ z W 46 W W 7 z 45 45 _ d Z 44 44 w w• fJ 43 43 Z Z ._._ - N N 42 42 NE O- a - , 42 NE � - 42 T 26 N 25 N -- T 25 N n ae 41 41 W'• - N H Z 40 J 40 e 4 W 79 N 39 39 f7E LU W - z v v K 38 Z z W E NW NE 37 S Z 37 NE _ 37 36NE-z 36 NE 36T25N °3esaxs✓�+ _ T24 ' T24N ' � - • 35 W W D 34 NE 34 33 £CIX-� O •{1 _ 37 c(V O - 33 NE" 32 -_ 32 r 31 B71 .6" 0� __._.__-_______.._31' _ _ - -- T24 T 23 N 30 �0 i- ' -J 30 29 - O �O \ - U3 -_- --- 29 NE 29 NE 29 T 23 N 2e OJ��t� _R w -- z z 2s 27 : - --' Q'�G% o _ _ _ 27 NE x; 27 W w w w w w w w Or' o O N N N N N N 26 Z Z -xB W W 0 ¢ rD z-- - 26 NE `tr, R G P 0 N M L K J I H G F E D 25 Q d _ !`` 2s -� V� -25 NE JJ Z C30 24 T 23 N T23N 24 ? .. m < __.._ O- T22N f -T- P T 22 N - �t� - - --: SON 27 533 n8<3Vx%H��axNf?�fra3a�s A ------•__ Z 1 W �j - ,yam �r ��94.k. 'L1�E`.•+.,_ 22 22 21 21 LU w OVER_EN R Oq�y 20 NE m - -. W 20 N U20 „i - `_ z O,� _ _ m - 9 NW w O z +e Y� 3Uj 18 NE ✓ 19 2N T22N le '` z Oy2 -0 ^/ Ni r -Z 70 ` __W- T2 T21 N � •--- � O In 0 n 17 BAIRD S RINGS R� w\� .. - z m -- a 16 NEL 16 -- �Gs , r L% II 5 14 14 �Q ` �3 NW -_ (\N R x n 1 __ _ _ _ 13 ai 21 N 12.5 N 20 28 RTIN RO P� 1 - - - - - - 12 T21 N j 12 l - .� _ •�Tl�f�.Y ❑ ❑ T20N .: T 20 N � '� p,RTIN � y 26 5 NW -, .-a -r z¢ w _ O 1(. i r tt " ;? z - Z 10 9NW O _ __�._ _ ___ _7 _ z z e Y _ -_ ____ ___ ._-_ _.__�_ __ - - r 1•_ - - - T20 N 7 i T20 - - -- - - - 6 T19N f I s z 5 t7 - - 4 _-� _._____- z y. f Y W r - -- - 23 ;___-. __.-- ---- _ .._ __ --- Y -- _—_; �. •� - _3 f1E -• 15 1. - 13 z 2 -�IAU - OU H F N R - N_ H FRONTA E R - -~ N , z M NW i i7W' t ❑ T T 19 NE SW T 18 N BL `-- z° fK _ j f,:- "� 1 B N $E T 19 N ) !�$€ _ _ _-- S Sj O ._.-t.. 3 2 q Q 00 4 SW _00 �__ 4 Y -_'16'- - ... r/ -- - s 1 r T18Nm W- O z0 L- 11 6 T18N 1 — -_ _ T17N p `-- 7 ❑ _ 7 � L...... __'.""_'.'__L'_-�•_. FRENCf-HMiAN' HILLS Rb ! z - 9 S X -• ` mBo - 10.5 SW C• 1 ! ❑r 10 $SIJ- 10.5 SE j0`�€� A0 5 SF rS T17N 2 ;I-� -_ - .�� -_- _ -�_. _ L r:1 --.M i 12 T16N -"---_ _.--_ f., . _-....,-.Ili'••.•._,a£3n"ii4-�r.•F'6i5Es3'e?:°+!rat_::: r-,•B� .._._... t.. 1. , G INSET MOSESLAKE , - >---- --- -- 13 H I J K L M N 0 P 0 R S T U v w x DICKRDl L DM N RD REO� 8 i.. p D4LRD B- K Gci` 1 . W WY .. tioti to R K NIS it R RAINIE��6� N PETT GREW_ ID WILD GOOSE LN �iiJJff II((I SCOTT R_D 0-15 in Po � !� 2 DR ..... P ........ 2 M '1 � TEAL RD ZEf.RP-..... z l{f 'D \.. it o N' -, 14 w w W w W W __. HARRIS R ....o .............. F L O N N N t��l Dom '/ CI l K - - •--- a a STONE RD x ,s IY C M Y w �•'"- o ............ - W.. - Loft 17 R• z cz • ON,�y�pt T cq . "�� m T 16 N Legend )ERT'-� ti25ae4- -- 3v " '. �<.."^•••RF /�D 1B T 15 N .OR. DR - .. - �� .--�"„'r~•.,.y m STIP2022FIN3 VALLEY RD 21 ♦-• STIP2022FIN3 %¢� - 22 2 3 "- --'-- County Roads T 14 N 3. a 25 Lakes and Streams • ur�s-"��. - :a. Yom* _-, � CIV County_Outline low- 27 27 �' 27 =B =B-- =B City Limits 29 W W N ° State Highways and Interstates 3o W W sc 31D --T-1-� Rail Road H G F E SW SE rrM�Yr�f 3 N W 0 1 2 5 10 r ;r x�=Y rYzC4Miles I.Ul[LFdl.L 1 ULdl V.a.,�.-r-r,✓moi .vv 3 -NE Phase 4 (U -NE to X -NE) RECONSTRUCTION PROJECT CRP 22-01 Bid Tabulation - 6/28/2022 ENGINEER'S ESTIMATE Tommer Construction P.O. Box 1150 Ephrata, WA 98823 Selland Construction P.O. Box 119 Wenatchee, WA 98807 Item # Total Quantity Unit Item Description Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount PREPARATION 1 1 L.S. Mobilization $90,000.00 $90,000.00 $88,362.20 $88,362.20 $20,000.00 $20,000.00 2 1 L.S. Clearing and Grubbing $15,000.00 $15,000.00 $13,473.72 $13,473.72 $500.00 $500.00 GRADING 3 59,400 S.Y. Rotomilling Bituminous Pavement $1.00 $59,400.00 $0.94 $55,836.00 $1.10 $65,340.00 4 12,307 C.Y. Roadway Excavation including Haul $10.00 $123,070.00 $8.21 $101,040.47 $15.00 $184,605.00 5 5,816 C.Y. Embankment Compaction $5.00 $29,080.00 $1.29 $7,502.64 $6.00 $34,896.00 DRAINAGE 6 110 L.F. Plain Steel Culvert Pipe, 0.064" Th. -12" Diameter $60.00 $6,600.00 $60.62 $6,668.20 $80.00 $8,800.00 7 60 L.F. Plain Steel Culvert Pipe, 0.064" Th. -18" Diameter $80.00 $4,800.00 $96.14 $5,768.40 $90.00 $5,400.00 8 65 L.F. Extend Plain Steel Culvert Pipe, 0.064" Th. -18" Diameter $80.00 $5,200.00 $126.38 $8,214.70 $100.00 $6,500.00 9 30 L.F. Extend Plain Steel Culvert Pipe, 0.064" Th. - 24" Diameter $90.00 $2,700.00 $146.52 $4,395.60 $105.00 $3,150.00 10 80 L.F. Extend Plain Steel Culvert Pipe, 0.064" Th. - 36" Diameter $100.00 $8,000.00 $177.62 $14,209.60 $145.00 $11,600.00 SURFACING 11 20,000 Ton Crushed Surfacing Base Course $15.00 $300,000.00 $19.70 $394,000.00 $22.75 $455,000.00 12 13,500 Ton Crushed Surfacing Top Course $16.00 $216,000.00 $20.50 $276,750.00 $25.25 $340,875.00 13 2,500 Ton Special Crsuhed Coverstaone In Stockpile $10.00 $25,000.00 $12.65 $31,625.00 $9.50 $23,750.00 TRAFFIC 14 420 L.F. Beam Guard Rail Type 31 $33.00 $13,860.00 $42.55 $17,871.00 $38.00 $15,960.00 15 6 Each Beam Guard Rail Type 31 Non -Flared Terminal $3,800.00 $22,800.00 $4,370.00 $26,220.00 $3,900.00 $23,400.00 16 471500 L.F. Paint Line $0.25 $11,875.00 $0.21 $9,975.00 $0.20 $9,500.00 OTHER ITEMS 17 1 L.S. Roadway Surveying $35,000.00 $35,000.00 $40,250.00 $40,250.00 $4,500.00 $4,500.00 18 1 L.S. SPCC Plan $1,000.00 $1,000.00 $500.00 $500.00 $350.00 $350.00 19 4 Each Monument $1,500.00 $6,000.00 $1,995.83 $7,983.32 $750.00 $3,000.00 20 1 L.S. Trimming and Cleanup $7,600.00 $7,600.00 $6,081.15 $6,081.15 $17,500.00 $17,500.00 21 6.0 Acre Seeding, Fertilizing and Mulching with Roadside Mix $1,500.00 $9,000.00 $2,070.00 $12,420.00 $1,650.00 $9,900.00 22 1.00 Dol. Minor Change $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 I.Ul[LFdl.L 1 ULdl V.a.,�.-r-r,✓moi .vv M Submitting County: Grant Project Number-, 132 1 -01 Date Approved-, 04/29)202. 1 AUTHORIZED RATA FUNDS. $698,400 Road Road Name(s) BMPJs) EMP(s) ----------- Segment # 94000 3 -NE (U -NE to County Line) 10,900 13,900 The State of Washington County Road Administration Board (CRABoard) and Grant County (County) mutually agree as follows: (1) The funds hereby authorized are for completion of the proposed prqject as defined by chapter 36.79 RCW Roads and bridges — rural arterial program. (2) The County is in compliance with the provisions of chapter 136-150 WAC regarding eligibility for Rural Arterial Trust Account (RATA) funds. If the County is found not to be in compliance with these provisions, such non compliance may be cause for the CRA Board to withdraw or deny the Certificate of Good Practice of the County and require pay back of any RATA funds that have been paid to the County for this project, (3) If the project is reconstruction, the County shall gain approval from w (chapter 43.32 RCW ) for all deviations from the des" n t construction. I I W standards listed in the Local Agency Guidelines prior o const ction. (4) If the project is 3R (resurfacing restoration and rehabilitation), the County shall document its design considerations for the proposed improvements in keeping with 3R standards as listed in the Local Agency Guidelines. (5) The project shall be constructed in accordance with the 'information furnished to the CRABoard, and the plans and specifications prepared by the county engineer. (6) Phased construction methodology is permitted upon notification by the county engineer of the phasing plan as authorized under WAC 136-170-030. Failure by the county to notify the CRABoard of phasing plan at least 15 days A, prior to commencement of construction may result in withdrawal of funding by the ABoard and county forfeiture of all RATA funds expended. (7) The County shall notify the CRABoard when a contract has been awarded and/or when construction has started, and when the project has been completed. (8) The County shall reimburse the RATA in the event a project post audit reveals improper expenditure of RATA funds. (9) Costs of the project which exceed the amount of RATA funds authorized by the CRABoard, set forth above, and the required matching funds and other funds represented by the county to be committed to the project, shall be paid by the County as necessary to complete the project as submitted to the CRABoard. RAP Project Number: 13 2 1 -01 Page 1 of 2 (10) Matching funds and other funds represented to be committed to the project shall be available as necessary to implement the projected development of the project as set forth in the construction proposal prospectus. 1) The CRABoard hereby agrees to reimburse the county from RATA funds allocated, and not otherwise, for its reimbursable costs not to exceed the amount above specified. (12) The CRABoard will reimburse costs incurred by the County based on project progress as certified by the county engineer within the CRABoard's RAP Online project management application by monthly progress payment vouchers received and approved on individual projects in the order in which they are received in the CRABoard office, subject to the availability of RATA funds apportioned to the region. Such obligation to reimburse RATA funds extends only to project costs incurred after the date of project approval by the CRABoard. (13) Either the CRABoard or the County may request changes to the provisions sions contained in this agreement. Such changes shall be mutually agreed upon and incorporated by written amendment to this agreement. No variation or alteration of the terms of this agreement shall be valid unless made in writing and signed by authorized representatives of the CRABoard or the County hereto. (14) During the term of this agreement and for a period not less than six (6) years from the date of final payment by the CRABoard, the records and accounts pertaining to this agreement are to be kept available for inspection and audit and copies of all records, accounts, documents, or other data pertaining to the agreement will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until said litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the six year retention period. IN CONSIDERATION of the allocation by the CRABoard RATA funds to the project in the amount set out above, the County hereby agrees that as condition precedent to payment of any RATA funds allocated at any time to the above referenced project, it accepts and will comply with the terms of this agreement, including the terms and conditions set forth in Chapter 49, Laws of 1983, 1 st Ex. Sess. (chapter 36.79 RCW), the applicable rules of Title 136 WAC and all representations made to the CRABoard upon which the fund allocation was based, all of which are familiar to and within the knowledge of the county and are incorporated herein and made a part of this agreement, although not attached. This agreement supersedes all prior agreements issued using the project number listed above and shall be valid and binding only if it is signed and returned to the CRABoard office within 45 days of its mailing by the CRABoard. M WN -7 -42M Date RAP Project Number-, 1321-01 Page 2 of 2 July 5, 2022 Tommer Construction Company P.O. Box 1150 Ephrata, WA 98823 GRANT COUNTY OFFICE OF THE BOARD OF COUNTY COMMISSIONERS R 0 Box :37 EPHRATA WA 9BE323 (509) 754-2011 Re: Award Letter, 3 -NE Phase 4 Road Reconstruction Ladies and Gentlemen: This is to inform you that the contract for the above referenced project has been awarded to your firm at your bid price of $1,129,111.00. Sincerely, BOARD OF GRANT COUNTY COMMISSIONER Danny .Stone, Chair o &`O�90000`­ Cindy C'Arter :bjv Cc: Grant County Public Works Danny E. Stone District I Rob Jones District 2 Cindy Carter District 3 "To MEET CURRENT AND FUTURE NEEDS, SERVING TOGETHER WITH PUBLIC AND PRIVATE ENTITIES9 WHILE FOSTERINr. A RESPECTFUL AND SUCCESSFUL WORK ENVIRONMENT."