Loading...
HomeMy WebLinkAboutBid Related - Public Worksff'o] Authorization given:I June 7,, 2022 to CALL FORBIDS b -the Grant County Public -D y Works epartment for,, Bid op e*ning date to be June 28 2022 at 1*00 PMA at the Grant County Public Works Department 124 Enterprise StI. E. Ephrata, WA 98823 .BOARD OF COUNTY COW MISSIONERS GRANT COUNTY.- WASHINGTON Yea Nay Ab ti n Da..'nhy E. siorae, Chair Eb/ 13 E:1 Rob Vi Chair Chair A El * - C d C rl in y . a Member Appro, d: ATTEST: Pr ler the Bi unty Engineer Cler o the Board/ o R E C [-E, I V E Dtny`e0����! 7'5,11 Yf1i G R A i'mIT C 0 IIJ NPI C 0 11A M I S S 10 N E-' R S Grant County Department of Public Works 124 Enterprise St. S.E. Ephrata, WA 98823 To: Honorable Grant County Board of County Commissioners From: Dave Bren, PE, MSCE County Road Engineer Date: June 1, 2022 Re: Reconstruct Road 3 -NE from U -NE to X -NE (PHASE 4) Authorization to Bid (CRP #22-01) Serial No. 22.06:1 Legislative History: Financial Impact: .4 • First Presentation: June 2022 Authorized RATA Funds: $.'�.�:�::698' 698;400 • Second Presentation:• Planned Local Funds: $ 351,600 • Action Requested: Authorization to Bid • Self Performed BST Work: $ 200,000 Overview The Public Works Department is proud to announce preparation of Construction Plans and Specifications to Reconstruct Road 3 -NE from U -NE to X -NE (Attachment A & B). The work includes the reconstruction of 2.97 miles of two-lane County Road with associated excavation, embankment, culvert crossings, road base, and crushed top course to prepare for a County Installed BST Surface. BST Surface by County Staff: The final BST surface is to be placed by County Staff. The estimated cost is $200,000 for self - performed work on this project. Fiscal and Policy Implications 111MMERIK."'MW Much of the planned funding for this project ($698,400) comes from a Rural Arterial Trust Account (RATA) through a 5.25.2021 project agreement Authorized by the CRAB Board (Attachment C,). The remainder of the ann—eypiffi–Rdff project is to be provided by local County Public Works funding ($551,600). E D "'To meet, current and future needs, serving together with public and' private, entities, while fostering, a, res S 0 NIF 10, S, work environmen.�� � ���..,_ t"' information .......................... 754-6082 DaVe Brent ErCountyRoarntineer-............_.Ext.302Ed Lowr,supeivisor-DiSt.No. 350 FAX............................................................. (59) 754087 sobsersant,construction 3503 Mike, DeTrolio, Supervitsor-Dist. NO. 3591 E -mad ... ................. ....... . publicWortoograntcountywa-gov, LOC Ohl, ACCOUntant Lead .............. 3.555 John Brissey, supervisor-DiSt NO. 3 ......... .................. EXt 3541 Sam Castro,, Public Works Xxt. 3504 Rod Follett,, Forem an -sign ....... .35 , 79 Johnspiess, superVisor-central Shop__..._(5o9) 754-6086 Samuel Dart,, ASSIStant Director... ... ...... .. Ext. 3519 Jason �Colllngs, solid W aste ........................(509) 754-4,319 Andy sooth,, Bridge S upenvisor . . ............. ................... EXt 3535 Commission* Packet Attachment A. Construction Provisions B. Construction Plans C. Rural Arterial Trust Account (RATA) Project Agreement Action Requested Public Works Staffrequests that the Commission Authorize Bidding for the Road 3 -NE (PHASE 4) Reconstruction Project as presented. "'To meet current and future needs, serving together with, public and private entities* while fosterhg a respectful and successful work environment," Information .................................................(509) 754-6082 Dave Bren, PE, County Road Engineer .................. Ext. 3502 Ed Lowry, Supervisor -Dist. No. I ................................ Ext. 3540 FAX ............................................................... (509) 754-6087 Bob Bersanti, Construction Engineer .................... Ext. 3503 Mike DeTrolio, Supervisor -Dist. No. 2 ........................ Ext. 3591 0V E-mail ............................. publicworks@grantcountywa.gov Loc Ohl, Accountant Lead ....................................... Ext. 3555 John Brissey, Supervisor -Dist. No. 3 ........................... Ext. 354:1 Sam Castro, Public Works Director ....................Ext. 3504 Rod Follett, Foreman -Sign Shop ............................ Ext. 3579 John Spiess, Supervisor -Central Shop ............. (509) 754-6086 Samuel Dart, Assistant Director .........................Ext. 3519 Jason Collings, Solid Waste .......................... (1509) 754-43:19 Andy Booth, Bridge Supervisor .................................... Ext. 3535