Loading...
HomeMy WebLinkAbout*Other - Public Works/3 Wft rp r n tetrix ENGINEERING. PLANNING . ENVIRONMENTAL SCIENCES .,-. Grant County Amendment Eight Change No. 5 Ephrata Landfill RI/FS Engineering Services WELL INSTALLATION, TESTING, AND SURVEY; GROUNDWATER SAMPLING AND TESTING; HYDRAULIC TESTING; MULTI -PHASE EXTRACTION PILOT TESTING; AND FEASIBILITY STUDY COMPLETION Parametrix provides engineering services in support of the Ephrata Landfill Remedial Investigation and Feasibility Study (RI/FS) under the Consulting Services Agreement among Grant County, Nossaman LLP, and Parametrix (3/28/06; amended 10/11/2013, 01/19/2016, and 04/03/2018). This Change No. 5 to Amendment Eight adds scope and budget and extends the schedule, as summarized in the attached Scope of Work and Budget Summary (Exhibit A). Amendment Eight is extended through June 30, 2022. The Amendment Eight budget of $1,225,144, as previously amended, is increased by $80,000. The new Amendment Eight budget is $1,305,144. Approved for CLIENT Accepted for PARAM ETRIX, INC. BY Wr � By Title Title Director of Risk Management Date Date: 5/13/22 Grant County 553-1860-013 Amendment Eight Change No. 5 1 May 2022 Ephrata Landfill RI/FS Engineering Services Pa ra etrix ENGINEERING. PLANNING.r! /�- .. �.� i..i /. � i ..�. �-. .. .�. �, iv.��/ - ,, i. � i,-�-.i� .moi._ i/. /i. �✓. �_/. _i -./- .- Grant County Exhibit A: Amendment Eight Change No. 5 Ephrata Landfill RI/FS Engineering Services WELL INSTALLATION, TESTING, AND SURVEY; GROUNDWATER SAMPLING AND TESTING; HYDRAULIC TESTING; MULTI -PHASE EXTRACTION PILOT TESTING; AND FEASIBILITY STUDY COMPLETION This Change No. 5 to Amendment Eight extends the schedule through June 30, 2022, extends services, and adds budget. INTRODUCTION Amendment Eight took effect on August 31, 2019, to provide engineering services and support for additional remedial investigation (RI; Phase 1) and develop the workplan for additional pilot testing of remedial alternatives (Phase 2 Workplan). Scope and budget have been added and the schedule extended through four prior changes: • Change No. 1 added to the scope, added $387,970 to the budget, extended the schedule through May 28, 2021, and temporarily reduced Parametrix's labor multiplier. • Change No. 2 extended services, added $75,000 to the budget, and extended the schedule through July 30, 2021. • Change No. 3 extended services, added $85,000 to the budget, and extended the schedule through December 31, 2021, including two minor schedule extensions. • Change No. 4 extended services, added $80,000 to the budget, and extended the schedule through April 30, 2022, including one minor schedule extension. Change No. 5 is needed to cover costs during schedule extensions because Phase 1 Report and draft Phase 2 Workplan comment resolution has been extended. Change No. 5 excludes the following services: • Dispute resolution • Feasibility study completion, including additional pilot testing Dispute resolution services, if needed, will be provided under a separate agreement. Feasibility study completion and additional pilot testing will be added to Amendment Eight as a future task. Tasks and subtasks are affected by this change as follows: J003 Assessments and Remedial Investigation 01.01 Engineering Support Wells and GW Sample Test (Complete, inactive, no changes) 01.02 Engineering Support Phase 1 Data Report (Schedule extension, scope and budget addition) Grant County 553-1860-013 Exhibit A: Amendment Eight Change No. 5 1 May 2022 Ephrata Landfill RI/FS Engineering Services SCOPE OF WORK (continued) 01.03 Task Management and Administration (Complete, inactive, no changes) 01.04 Task Direct Costs (Complete, inactive, no changes) J004 Feasibility Study Part 1 02.01 Phase 2 Workplan (Schedule extension, scope, and budget addition) 02.02 Task Management and Admin (Schedule extension, scope, and budget transfer if needed) 02.03 Task Direct Costs (Schedule extension, possible budget transfer) 02.04 Critical System Maintenance (Complete, inactive, no changes) J004 Feasibility Study Part 2 (Future Task 3, not scoped or budgeted) J008 Grant and Project Administration 04.01 GPA through July 2021 (Schedule extension, scope, and budget addition) 04.02 Grant -Ineligible Effort (Schedule extension) In addition to the specific changes above, Parametrix will extend the temporarily reduced labor multiplier (reduced as part of Change No. 1) through June 30, 2022, or the expiration date of any minor extension. SCOPE BY TASK Task 1: J003 Assessments and Remedial Investigations Subtask 1.1 Engineering Support for New Wells and Groundwater Sampling and Testing (Complete, Inactive, No Changes) Subtask 1.2 Engineering Support for Phase 1 Data Report (Schedule Extension, Scope, and Budget Addition) Change Summary The task completion schedule is extended through June 30, 2022, and budget is added to cover the extended City comment resolution period. Subtask 1.3 Task Management and Administration (Complete, Inactive, No Changes) Subtask 1.4 Task Direct Costs (Complete, Inactive, No Changes) Task 2 J004 Feasibility Study Part 1 Subtask 2.1 Phase 2 Workplan (Schedule Extension, Scope, and Budget Addition) Change Summary The task completion schedule is extended through June 30, 2022, and budget is added to cover the extended City comment resolution period. Grant County 553-1860-013 Exhibit A: Amendment Eight Change No. 5 2 May 2022 Ephrata Landfill RI/FS Engineering Services SCOPE OF WORK (continued) SUbƒ@sk 2.2Task Management and Administration le Extension, Scope Addition, Possible Budget Transfer) Change Summary The task completion schedule is extended, and budget may be transferred to this task if needed to cover management and administration through June 3O,2O22. Subtash2.3Task Direct Costs (Schedule Extension, Possible Budget Transfer) Change Summary The task completion schedule is extended through June 30, 2022. Direct costs have been lower than planned. Presuming that direct costs remain low, and ifneeded, some budget may betransferred toactive tasks. Subtask 2.4Critical System Maintenance (Cornp|ote`Inactive, NoChanges) Task 3JO04Feasibility Study Part 2 Naceho|derfor additional pilot testing and feasibility study completion. Scope and budget tobedeveloped inthe future. Task 4JOO8Grant and Project Administration SUbtask 4.1 GPA Through October 2021(Schedule Extension, Scope, and Budget Addition) The task completion schedule is extended to June 30, 2022, and budget is added for financial assurance calculation development. Subtask 4.2Grant- Ineligible Effort(Schedule Extension) The task completion schedule isextended through June 3O,2OZ2. Budget Summary Task & Subtask lAddition 1. J003 Assessments and Remedial Investigations 1.1 Engineering Support for New Wells and Groundwater Sampling and Testing $0 1.2 -Engineering Support for Phase 1 Data Report $8,000 1.3 ITask Management and Administration $0 1.4 ask Direct Costs $0 2. J004 Feasibility Study Part I 2.1 Phase 2 Workplan $37,000 2.2 Task Management and Administration $0 2.3 ITask Direct Costs $0 2.4 1 ritical System Maintenance $0 3. J004 Feasibility Study Part 2 (Placeholder, not scoped or budgeted) Grant County 553a860-013 Exhibit mAmendment Eight Change No. s 3 May 2022 SCOPE OF WORK (continued) 4. J008 Grant and Project Administration 4.1 GPA Through October 2021 $35,000 4.2 Grant -Ineligible Effort $0 Total Change No. 4 Budget Addition $80,000 Amendment Eight Budget, as Amended by Change Nos. 1 through 4 $1,225,144 New Amendment Eight Budget $1,305,144 Grant County 553-1860-013 Exhibit A: Amendment Eight Change No. 5 4 May 2022 Ephrata Landfill RI/FS Engineering Services