HomeMy WebLinkAboutGrant Related - BOCCGRANT COUNTY
BOARD OF COUNTY COMMISSIONERS
LlJ_l_=i1_L!J
TO: TOM Board of County Commissioners
MAY 3.1 2022
From: Janice Flynn, Administrative Services Coordinator
Datw. May 24, 2022
Ra. Authorization for Release of BOCC Approved Funds, SIP #2020 -06 -
Port of Quincy — Intermodel Yard Container Expansion — Phase 2
The Port of Quincy has met the requirements for release of funds in the above -
referenced SIP project, which was approved by the BOCC pursuant to Resolution
No 21 -003 -CC dated January 5, 2021. The proof of requirements is in the form of
a signed Project Certification from the Port of Quincy and supporting invoicing of
the project that meet the requested amount. The documentation is attached for
your review.
To that end, I am requesting the release of funds on this SIP project as follows:
1) 2nd installment of the grant in the amount of Ninety Three
Thousand, Six Hundred Eighteen and 54/100 Dollars ($93,618.54)
to the Port of Quincy.
Note: The full grant amount was $300,000, leaving unused funds of $58,418.47.
Thank you.
I
GRANT COUNTY
STRATEGIC, INFRASTRUCTURE PROGRAM
PROJECT CERTIFICATION
This form must be- stormed and returned, with an invatee, for the approved funding,
before re-tmbursement can be approved by Grant County,
SIP Project Proposal Number; 2. :020-06
SIP Funding Recipiento, Port of Quincy
SR Pr'ect Des.c t'
01 np ion: Intermodal Yard Container Expansion. — Phase 2
1, the und d, do her - by brtify - nd pe of that the -ate W shave been
ersigne re, c nA
under Ity PeKW3 M ri
furnished , the services rendered -f
and/or the -labor pe, ( d as de c ibed C
r onne S r in the proj e t
proposal for the above -referenced SIP Pr 'ect and th am the ticat
01 at I authotized t a -e _
,,n e and.
.certify to this claim. I also certify that this claim i's just and due, and
is an unpaid obligation
against Grant County.,
Further, . according to the SIP. Pro* ect Fund'.n Polici
j in I .. es) I attest that at. the next audit of my
entity, this project all "be called. to the attention of the Wash" 0
in n
gto Mate ffl'
ce
and an emphasis audit will be requested to ass -tire that these funds Nv ere eXpended. towatd
the. project and according to the intent of the proposal
ev
*a ov OW/ X0, *I,
-Signature Title
Printed Name y/�
Date Signed
ii COPAPAse2ow
Printed Title
Completed, signed oriLyinal certification and invoice are to be
I v mailed to.:
Adn-iinistrittive Services Coordinator, PO Box
37, Ephrata, NVA 988,23
ATTACHMENT 4
PORT OF QUINCY
SIP'No. 2020-06
Industrial Yard Container Expansion - Phase 2
Reimbursement Request #2 (FINAL)
Tobin Electric*,
$ 300,000.00
117848
$ 71374.05
117972
116.86
117971
21-447.48
118152
31449.42
118360
79,299.59
Tommer Construction:
PORTQCY-1
1311226..66
1528341
11092.2 1 9
1 A *11 R C) C,
Total Reimbursement #2 (FINAL) $ 930618.54
Project Recap:
Grant Awarded
$ 300,000.00
Reimbursement Request #1
(147,96,2.9 )
ReJmbqrsemerit Request#
93,618.54)
lG`rant Funds het 'U
581418--
T051N -ELECTRIC., INC.
PO Box 428
4
Quincy, WA 98848
all U
(509) 787-1591
tobin.electric@frontier-6
AUG 9 2021
0M
A!,
Job Invoice
1
"13JLL To
JOB INVOICE # 117848
Quincy Port District #1
DATE 07129/2021
101 F Street SW
D U -E DATE 08/25/2021
Quincy, WA 98848
PO #
Curt M
.DESCRIPTION
OTY AMOUNT
Intermodal odal - Built 4 - 480V exte ns on cards for refers.
Installed 4 - addition 30 amp breakers and cord sets
out of now service panel. Troubleshot no Power to
receptacles. Supplied 4 - spare interlock erlock recept I acles for
the original towers, Converted 12 - refer sharing . units
from 4,to. 2 hour time cycles.
Materials
E333MPIA 32A 480V Male
4
40.00
160.00T
E333 FCA 32A. 480V Female
4
70.00
280.00T
UPS Freight
1
1.8.00
18 -OOT
#10/4 Type SO Cord
80
2---115
172' OOT
QD 30A 480V 30 Boll on Breakers.
4
388.00
1 552*OOT
3/4" Nylon Cord Conn
4
8.00
3 2.00T
3/4" Locknut
4
0.30
1 . .20T
1705-56 ANP 32A 480V Safety Interlock Receptacles
4
510.00
21040.00T
UPS Freight
1
48.00
48.3OT
4061-27-2'H 2 Hour Kits
12
:35.00
420,OOT
UPS Freight
1
40.00
40 -OOT
Subtotal: 4,7631.20
LABOR
Prevailing Wage Hours - Brock - 6/22/21
0.50
108.00
54.00T
Prevailing Wage Hours - Brock - 6/23/21
0.50
108-00
54.00T
Prevailing Wage Hours - Brock, - 6/25/21
0.50
108.00
54.00T
Prevailing Wage Hours - Will & Tim - 7/7/21
6.50
108.00
702.4OT
Prevailing Wage Hours - Will & Tim - 7/21/21
8.50
108.00
918.00T
Prevailing Wage Hours - Will & Tim -x`/29/21
2.50
108.00
270,
OOT
Subtotal: 21052.00
SUBTOTAL 3,815.20
TAX 558.85
TOTAL. 7,374.05
BALANCE DUE $7-1374-xO,5
TOBIN INC.
PO Box 428
Quincy, WA .98848
(509) 787-1591
tobin.electric@frontier.com
Job Invoice
-BILL TO
Quincy Port District #1
101 F S trees S W
Quincy, WA 988.48
JOB INV OIG -E# 117972
T -E -08/17/2021
DUE DATF_ 09/25/2021
PO #
Curt
'RATE AMOUNT.
-DESCRIPTION
OTY
,Intermodal - Troubleshot & repaired refer sharing unit #21. Replaced
bad 4 hr timer resistor
LABOR
Hours - Doug
1 1108-00 108-99T
SUBTOTAL
1 1 08.00
TAX
8:86
86
TOTAL
116,86
BALANCE DUE
116.86
SEP 2 2 2021
By:
TO IN ELECTRIC, ING.
PO Box 428
Quincy, WA 98848
(509) 787-1591
tobin.el.ectric@frontier.com
Job Invoice
BILL TO JOB JNVOIG-E# 117971
Quincy Port District #1 DATE 08/25/2021
10 1 F Street, SW -DUE DATE 08/31/2021
Quincy, WA 98848
DESCRIPTION:RATE
QY; TUT
AMO
Intermodal - UL listing for the .8 ESL 10 gang 300 amp
.Power units, and final electrical inspection
Picattil Engineering Evaluation & UL Listing For 3 E.SL
2100.00
211 00.00T
U n its
LABOR
Hours - Pat
1.50 108.00
162.00T
Subtotal: 2,262-A.00
SUBTOTAL
2W262.00
TAX
185.48
TOTAL
2 _Y447-48
BALANCE DUE
q) -4"447-A8
V[5
D
SEP 2 2 2021
By..
TOBIN ELECTRIC., INC.
PO Box 428
Quincy, WA 98848
(509) 787-1591
tobin,ele,ctri,c@front'ier.com
Job Invoice
BILL TO
Quincy Port District #1
101 F Street SW
Quincy, WA 98848
PO #
Curt
JOB JNVOICE # 118152
DATE 1110812021
DUED-ATIE 12/25/,2021
DESCRIPTION QTY RATE
AMOUNT
Intermodal - Troubleshot and repaired 4 refer sharing units.
Replaced 4 HR timers 2 HR timers. Supplied Parts
MATERIALS
40,61-02 8 Sec. Delay on Make Timer
3
45.00
13 OT
4061-03 Recyle Timer
3
65.00
195.00T
4081-.27µ2H 2 HR Time Resistor
18
al 10.00
648 -OOT
Electrical Permit Fee
1
65-00
65.00T
Cre..dit Card Charge
1
38,50
38.50T
E33.3 FC 480V Female
2
65.00
130.00T
E333 MPI 480V Male
1
40.00
40-100T
Electrical Permit Fee
1
0.00
O.00T
3/4" Nylon Cord Conn
1
8,50
8-.50T
3/4" Locknut
1
0.30
0.30T
Blue Q Slide F
6
0.25
1.50T
#14 THHN Copper Wire,Str
6
0.20
1.20T
Subtotal: 1 t263.00
WA'ftjZ'*0T'W*
Prevailing Wage Hours - Greg - 9/20/21
2.50
110.00
275.00T
Prevailing Wage Hours - Will & Tim - 10/13/21
6
110.00
660.OTPrevailing
Wage Hours - Will - 10/29/21
1
al 10.00
11 G -00T
Prevailing Wage Hours - Will & Tim - 11/5/21
3
110.00
330.00T
Prevailing Wage Hours - Will & Tim - 11/8/21
5
110.00
550.00T
Subtotal: 1,925.00
..................
SUBTOTAL
31188.00
TAX
261.42
TOTAL
31449.42
BALANCE DUE
%P 3,449-A2
TIN ..ELECTRIC, IN C-..,
PO Box 428
Quincy, WA 98848
(509) 787-1591
tobl'n.electr'ic@frontier.com
V
Job Invoice
-BIU TO
Quincy Port District #1
10 1 F Street SW
Quincy, WA 98848
JOIBINVOIC-E# 118360
DATE 03/08/2022
DUE DATE 04/25/2022
DES CRIPTI ONQTY RATE AMOUNT
Port Intermodal - Installed and wired 4th 10 gang reefer
sharing unit with 2 hour cycle timers
MATERIALS
ESL 3500 - 076A 10 Gang Unit (See attached invoice
1
29,653-00
29x653.00T
description)
Money Wire Transfer to ESL
1
45.00
45-0OT
SQD LJA36400 300 Amp Breaker
1
31480.00
31480.0OT
UPS Freight
1
18.00
18 -OOT
3" Plc-Sc,h.40 Conduit
800
8.15
21445.00T
3 PVC 36" Rad.. 90
2
65.00
130 -OOT
3"PVC ch,40 Coupling
4
3.50
1 4.00T
.3" PVC. 90 degree,Sch.40
1
29.00
29.OOT
3" PVC Male Adapter
1
4.00
4.00T
Locknut
1
3.65
3.65T
3" Plastic Bushing
1
2.75
2.75T
PVC Glue, Quart
14.00
21.O1J T
2" Underground Marking Tape/Ft
1
3.08
0-06T
3 1/2" Malleable Mogul LB
1
488.00
488 -OOT
3 1/2" Reducing Bushing
2
48.00
96.00T
3" Rigid Conduit
3.50
29.00
101.50T
1 5/8" Thick Strut
3
7.00
2 1.00T
Strust 3 - Hole Angle Bracket
2
7.20
14-40T
3" Strut Strap
2
3.30
6.60T
3" Two Hole Strap, Stl
1
3.50
3. 50T
1/211 x 4" Concrete Anchor
4
4.80
19.20T
3/811 X I Bolt Hardware
4
0.20
0-80T
3/8" Fender Washer
8
0.07
0-56T
3/8" Spring Nut
4
2.90
11.60T
2" x 12" x 16' Lumber
2
76.00
152 -OOT
1/210 x 20' Rebar
2
15.00
30 -OOT
3" Rebar Dobies
11
0.80
8.80T
DESCRIPTION
QTY
RATE
AMOUNT
Rebar Cutting Disc
1.50
4.00
4.00T
QHL Hardware
1
4.80
4.80T
CW Concrete and Short Load Charge
1
480.00
480.00T
Tape Seal Camper
15
9.00
9.00T
Concrete Cure Seal
1
34.00
34.OOT
Pull Twine
310
0.02
6.20T
#12 THHN Copper Wire,Str
310
0.28
86.80T
350MCM Copper WireStr
11000
10.50
1 0,500.00T
#2 THIN Copper WireStr
330
2.70
891.00T
Wire Lube Quart
2
15.50
OT
Phase Tape 3/4"
4
6.00
24.00T
Duct Seal per pound
1
6.00
BOOT
18" Ty Wrap Black -wide
10
1.20
1 1 2.00T
TA -0 Lug
1
1.80
1.80T
Brother Label
4
0.50
2.00T
Pioneer Metal Fabricated Stainless Plate
1
95.00
95.00T
1 l4" Taps
2
9.00
18.00T
1/4" Drill Bits
3
3.60
10.80T
1/411 x 1" Bolt Hardware
18
0.10
1.80T
Jig Saw Blades
2
5.00
1, O.00T
7/8" Hole Saws
2
10.50
21.00T
Picatti Engineering Evaluation & UL Listing
1
11680.00
i 0680 OOT
Inspection Fee
1
288.00
288 -OOT
Subtotal,: 51,0161*62
,WA
.T*0Tfyjft0j
Hours - Pat -2/8/22
1
120.00
120.00T
Hours - Pat - 2/10/22
1.50
120.00
180.00T
Hours -Will & Tim - 2/15/22
1
120-00
120 -OOT
Hours - Will, Tim, & Pat - 2/16/22
17
12 0.00
2tO4O.00T
Hours - Will, Tim., & Pat - 2/17/22
15
120.00
11800 -OOT
Hours - Will, Tim - 2/18/
6
120.00
720.00T
Hours -'Fill, Tim - 2/21/22
2
120.00
240 -OOT
Hours - Will, Tim - 2/22/22
'9
120.00
71 t080.00T
Hours -Will, Tim & Pat - 2/24/22
4
120.00
480.00T
Hours - Will, Tim, Pat & Wayne - 311122
14.50
120.00
11740,OOT
Hours - Will, Tim & Pat - 3/3/22
10
120.00
1 , 1200 -OOT
Hours - Will, Tim - 3/7/22
1.50
120.00
180.00T
Subtotal: 9,900 .00
SUBTOTAL
"601916.62
TAX
41995.16
TOTAL
85,011.78
PAYMENT
05,011678
BALANCE DUE ak 0
$ _X00
Ephrata WA 98823-115
(509) 787-3312
Bill To*
Port Of Quincy
101 F St
Quincy WA 98848
Quantity Unit Description Unit Price Extended, Price C o. r -nm e n t
......................... ..... ...............
2021
1.00 LS 'ondtlit Trenching Backfill & Poured Light Pole -c 9,179.27 91179.27 2021
2022,
1.00 L onduit Trenching, Backfill 3,0 .5.00 31045.00 2022
Invoice Aniount: 1�,,224.27
Please send payment to: P.O. Box 1150 Ephrata, WA 98823 Sales Tax: 11002,39
Terms: 30 Dav
W? Total Invoke Amount: 13,226.66
We appreciate your business', Visit our website at: www.tommerconstructuion.com
INVOICE I.
Invoice No-,
-PORTQCY-1
Date:
4/21/2022
Due Date:
5/21/2022
jobs No:
PORTQCY21
Description:
Port of Quincy 2021
PO
2021 & 2022
Custom No:
458
Quincy WA 98848
Quantity Unit Description Unit Price Extended, Price C o. r -nm e n t
......................... ..... ...............
2021
1.00 LS 'ondtlit Trenching Backfill & Poured Light Pole -c 9,179.27 91179.27 2021
2022,
1.00 L onduit Trenching, Backfill 3,0 .5.00 31045.00 2022
Invoice Aniount: 1�,,224.27
Please send payment to: P.O. Box 1150 Ephrata, WA 98823 Sales Tax: 11002,39
Terms: 30 Dav
W? Total Invoke Amount: 13,226.66
We appreciate your business', Visit our website at: www.tommerconstructuion.com
'E,
t RE L I Mf 2 0
N1 A R 311 2022
V
rNvoicE
Invoice No:
15-2-8341
Date:
3/17/202-9
Due Date:
4/116/2022
Job No:
GRAVEL22
Descriiption:
Gravel. Sales 2022
P 0 F"':
TO
Customer No:
45"s
Q411-n.CY
�VA 9884L9
Quantity
Unit
Description
Unit Price'Extended Price
. . ........ .. .......................... ........ -- .......... . ......... . .. ..........................................
Commen't
. .
66.60
TO
Basecourse
14.55 969.03
See. attached
CLIStomer Usa(Y-e
0
101.70
TON
Topcouxse
14.55 1,479.74
See attached
Customer Usaae
5.00
EA
Fuel Cha.rae
15.00 75.00
U
F el Charge
2 I oG �- -� .�� 00
. a, eu,Y,eO � e�u.Q�.
3 � cc CL0"-%
� M10" L.AAA �l ova 2,
2�5 = I, o� 2, f2_9
Invol*ce Amount: 22.523.77
Please send. payment to: P.O. Box 1150 Ephrata, VVA 98823 Sales Tax: 206.95
Ternis:30 Day
Total Invoice Amount: 21730.72
Iii a co 1-1 * 0 Vic -if mir viph-q*1 1p ah -tv-tv-tv,,ff)mmprrnn.rtniction.com
app1re-C1,12.1. e ", 1 o 11 r .. ti. S1 I "NA %0-S A %-11 4.
Y
Tommer Construction Co., Inc.
From Customer: 458 To: 458
From Order: To: zzzzzzzz
From Material: To: zzzzzzzz
Customer Usage page I Of 1
Date Run: 3/23/2022 Time Run: 1:59:5 PM
From Date'. '3117/2022 Td Date, 3/17/2022
1—Tic,ket—i Truck[Trl'r
Mat'l
------------ Material-.-- ----------
I --------------- ft -..-*-.R even u e -------------------yr
Dat e Number
ID
Unit Net
M a I t'l
Tax/Misc.
Total Date Eritered
Customer: 458
3/17/22 .1528341 150
-BASECOURSE
331.240
to
$48164
$55.89
$539.53 3117/22
3117/22 1528356 150
BASE CCII SE
33.366
to
$485.39
$566
$541.42 3/17/22
1 V4" Base Course Totals
66.600
to
2
$1,080.95
Total Tickets, 2
3/17/22 1528300 150
TOPCOURSE
34.3803
to
$50013
$57.25
$557.48 3117/22
3117/22 1528307 150
TOPCOURSE
33,690
to
$490A-9
$56A3$546.6
2 -3/17/2 2
3/17/22 1528328150
-
TOP COURSE
33.630
to
$489.32
$56.3 5
-$545L73117/22
518 Top Course Totals
Total Tickets", 3
101.700
to
S1,479.74
$1 73, 03
$1,2649-77
lion -order Totals
168300
to
$2,443.77
$281,
$2f73032
Total Tickets; 5.
Port of Quincy Totals
1168.300 to
$2,448-77
$281.95
$2,730.72
Total Tloke.ts-0, 5
Grand Totals
168.300 to
$2,448.77
$281-95
$2,730.72
Total Tickets:- 5
Page #1