Loading...
HomeMy WebLinkAboutReimbursable Work Request - Public Works (002)Ik Grant County Department of Public Works 124 Enterprise St. S.E. Ephrata AY)!R0Vt;U Memo To: Honorable Grant County Board of Co From: Dave Bren, PE, MSCE County Road Engineer Date: May 12, 2022 Mg 17 ZOZZ issioner==a ago s I Soe • - - - y B bf.f Re: Town of Hartline Reimbursable Work Request Crack Seal of Streets Serial No. 22.054 12 2022 Legislative History: Financial Impact: • First Presentation: May 1 7, 202 • Work Cost: $ 5 8,000 • Second Presentation: = • Reimbursement: $ 5800 • Action: I Motion to Authorize • Net Cost: $ 0 Overview The Town of Hartline does not have the equipment or expertise for the Crack Sealing of its own streets. The Town has requested that the County conduct the work for reimbursement. The work conducted shall not exceed $58,000 per the attached agreement (Attachment A). District 1 staff would manage and conduct the work, when they have time and availability to do so this Summer. County work shall always remain the priority. The work will likely be conducted in September of 2022. Commission Packet Attachment A. Town of Hartline -Reimbursable Work Request Form Action Requested Public Works Staff requests that the Town of Hartline Reimbursable Work be authorized. To meet, current and future needs, serving together with public and private entities, while ~os erang a respec .-V and suocess"'ul work environment,"' Information.................................................(509) 754-6082 Dave Bren, PE, County Road Engineer .................. Ext. 3502 Ed Lowry, Supervisor -Dist. No. 1................................ Ext. 3540 FAX...............................................................(509) 754-6087 Bob Bersanti, Construction Engineer .................... Ext. 3503 Mike DeTrolio, Supervisor -Dist. No. 2........................ Ext. 3591 E-mail ............................. publicworks@grantcountywa.gov Loc Ohl, Accountant Lead ....................................... Ext. 3555 John Brissey, Supervisor -Dist. No. 3 ........................... Ext. 3541 Sam Castro, Public Works Director ....................Ext. 3504 Rod Follett, Foreman -Sign Shop ............................ Ext. 3579 John Spiess, Supervisor -Central Shop ............. (509) 754-6086 Samuel Dart, Assistant Director .........................Ext. 3519 Jason Collings, Solid Waste .......................... (509) 754-4319 Andy Booth, Bridge Supervisor .................................... Ext. 3535 REQUEST TO THE COUNTY ROAD DEPARTMENT FOR REIMBURSABLE WORK To The County Engineer: Pursuant to terms of an agreement between the County and ti (Natlle of Requesting Agency) adopted and approved on the undersigned hereby requests the ;ounty to perform the work listed below at a time and in a manner convenient to the County. The indersigned further requests that the work be completed no later than '� � .�-- .nd hereby guarantees reimbursement to the County for all work done up to a maximum of c Cam. C Vork to be Completed: C r o-c-k Se,\ o� Ce1'j 5402?TS 6 DATED:�20-z-z- SIGNATURI TITI-jE low To The Board of County Commissioners: DATE I have examined the above request and made the ving reco dations: Co y Road Engine Director of Publicworks rtion of the Board of County Commissioners: DATE • L` The Engineers r ecomi-neiidation is hereby Oppraved. - [� pP The Engineer's recommendations is disc 'roved or modified as follows: � Attest: Clerk of the Board BOARD OF COUNTY COMMISSIONERS OF COUNTY, WASH INGTON Rmwmcndod for use with Section 2 of Form CW C 01 end WAC 136-32-030