Loading...
HomeMy WebLinkAboutRequest to Purchase - Facilities & Maintenance (002)Grant County Facilities & Maintenance POBox 37 Ephrata WA 98823 (509) 754-2011 Ext -3272 Board of County Commissioners April 20, 2022 Re: Request to Proceed with Wheeler Road Facility Roof Wiring Dear BOCC, This year it was budgeted to replace the roof on the Grant County Facility for District Court and WSU at 1525 -Wheeler Road in Moses Lake, Washington due to the roof being at end of life and in poor condition. Part of the roofing project is extending the conduit and wiring to the units because of the additional insulation that is part of the new roofing system. While reviewing this phase of the project a couple of electrical code issues were identified. One was the conduit to all the units have failed connectors which allows water to enter them. A second concern was the lack of service outlets within 25 feet to service the units. These NEC Code corrections and wiring alterations were put to out to bid, and Farmers Electric had the low bid at $15,018.82. This cost has the tax included in it. Their bid would run new feeder cable under the roof out of the weather, eliminate a trip hazard on the roof, and make it easier to seal the cable penetration in the new roof. The bid also includes installation of 120v receptacles on each unit for service which takes care of the other NEC issue. It is my opinion that this work should be done, and I am asking the Grant County Board of Commissioner's permission to proceed. The cost for this project, $15,018.82, would be paid from the Wheeler Road Roof Replacement Project, 126.168.00.9112.594186210, which has a remaining balance of $38,172.00. Thank you for your consideration in this matter. Sincerely, �w6t Se"ult Kevin Schmidt Facilities and Maintenance Manager Grant County, Washington APR 2 6 2022 o pa ktS&M ee ea - .-• : ...-,__--... ._ ,v -.p-, yam.. n -r•:. Kevin Schmidt Manager Facilities and Maintenance r Kschmidt@grantcountywa.gov, 2,022AP "To meet current and future needs, serving together with public and private entities, while fostering a respectful and successful work environment" �..,_m<•..,s,.r_ccea...m.�::.z7..,r.>::,.......i._.-x-,.o_:.-.ec:v_.u:,-.e>x,n.s•^: v:•<,::<.:•.-.. r...-,.ti.vsc,.a-z�