Pursuant to terms of an agreement between the County and Town of Coulee City
1Aql�
(Name of Requesting Agency)
Adopted and approved an ��1,��� J the undersigned hereby requests the County to perform the
work listed below at a time and in a manner convenient to the County. The undersigned further requests that the
work be completed no later than November 1 2022 and hereby guarantees reimbursement to the
County for all work done up -to a maximum of $�
All terms of said agreement shall apply with the following exceptions:
DATED: 3.ttt '2,tJ2
SIGNATURE
gency Representative)
TITLE _ t ,i[�!� 4�1,+ V1 IV►.GI,(IM1)YI �
To the Board of County Commissioners:DATE
I have examined the- above request and made the following recommendations:
The request is approved � The request is disapproved or modified as (allows:
C my Engineer,/ Public Works Director
Action of the,Board of County Commissioners: DATE °-4
V,Ue Engineer's / Director's recommendation is hereby approved.
0 The Engineer's / Director's recommendations is disapproved or modified as follows,
Recommended for use with Section 2 of Form:
CRAG #101 and WAC 136-32-030 Revised 14/19
BOARD,OF COUNTY COMMISSIONERS OF GRANT COUNTY, WASHINGTON
MAR
G, r ANT C0 U NTV C. I S S 10 N1ER
IIYYCY%Lf3fRYJ.+YbRAS`.SAN`F+'.�.�>+�R.FIl!A%1.fJNAk:f�� C/ 3M'^b0'.cil:><G�f.:f'�Y3:AS1ELf.i q:3T.ld N..:�].�
Chip Seal Estimate
Road Name #????? M.P. ??.??.To M.P.
Jown of Coulee City
2/1/2021
Prime Shot - 0.55 gallon per square yard
1 Foreman @,62.81 x 60 hrs
$3,768.00
Second Shot - 0.40 gallon per square yard
3 multi Oper. @ 47.12 x 60 hrs
$8t481.60
Total gallons per sq yd, 1 shot
0.95
1 light Oper. @ 44.30 x 60 hrs
$2,658.00
HFE 150 is 8.17 lbs. per gallon
8.17
3 Truckdrivers @ 43.07 x.60 hrs
$7..75.2-60
Contract HFE 150 $cost per ton
$520.00
Sales Tax HFE-150
8.0%
Total Operator cost
.$
22-66UO
Total Cost HFE-150 per ton
$561.60
Coverstone - 35 pounds per square yard per shot
Total coverstone per sq yd, I shot
64
Pounds per ton
2,000
2 Pickups @ 13.00 x 60 hrs
$1.,560.00
3 Dump trucks @ 65 x 60 hrs
$11,700,00
1 Rollers @ 50.00 x 60 hrs
$30000.00
HFE for Project
I Chip Box,@ 150.00 x 10 hrs
$1,500.00
Length of project (miles)
0*18,
1 Distributor @ 100.00 x 10 hrs
$1,0000.00
Proposed Road Width (ft)
0
1 Loader @ 100.00 x 60 hrs
$6,000.00
2,,112
1 Broom @ 52.00 x 20
$1,040.00
Total Gals HFE-150
2048
25, -80000
Tons of HFE 150
Total $cost of HFE 150
$4;698-39
Labor and. Equipment
$22,660.20
$25,,800.00
Freight cost to deliver HFE 150
Total HFE 150 by ton for project
8.37
Materials
$6,,468.45
ton cents per mile
0.1760
Terminal to job site miles
50
Total cost Materials and Labor
Tota I Frieght cost
$73.62
Coverstone for project
Administration Fees
$5,,,492,87
Tons of Coverstone
33-00
------
Costs of coverstone $ per ton per pit
28.
. . ........ . ......... .. . ............
Total $cost of coverstone
$339.24
Maint. Rock 174 x 7.80 1357-20
Total $cost of HFE 150
$4)698.39
Total Frieght cost
$73.62
Total $cost of coverstone
$339.24
Total $Cost of Cost Share Participant
4 wo
pw-0000-04
C) I
OWN
4th 3rd 2a I" McEntee Adams N well 1.8
i r Street
,,,..►
Lewis Street
imam
Now
0
A a'N I X GTOR
ashington St.
WNWIC:
C+
dmmpftxm—p� mom, 10 -V VAW f vt..Ua v C. <1
j I -* _o*:::: I WA^
LM 9�-o ON" W I
AOL -
FIS
Uri rm��
N.
Lincoln St-.
Ado St:
Arch St.
Columbia St.
*A J#tj T. — -Walnut Street
u,"OMOID 00 rL�lLr�ji 1 0
ciin Street
Aal
J� lou las Street
ION 4ANWftft"-ftvA
SSW
M
A
(11J C �j I� �
helun Street
- - - ------------
��,Ci Q �
Existing Scope
y«MMI� IIMw ��i�t a����omm�rr
Adaition
40
411�11 hL.Wha � N -
J I I ,
"MID ,..®.
CORPORATE LIMITS
1�
ModWed X022