HomeMy WebLinkAboutResolution 22-028-CCvt-�
BOARD OF COUNTY COMMISSIONERS
Grant County, Washington
RESOLUTION INITIATING COUNTY
ROAD PROJECT DESIGNATED AS
CRP NO. 22-02
RESOLUTION No. 22- 0V6 -CC
WHEREAS, IT IS HEREBY RESOLVED THAT Dodson Rd. Overlay Ph. 2,3 and 4 (4 -NW to SR 282), State Road Log No.
91030 from milepost 18.70 to milepost 29.70 be improved as follows:
This project will overlay Dodson Road from 4 -NW to SR 282 with a 0.17' thickness Hot Mix Asphalt overlay
in two lifts. This project is 11 miles long.
This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and
authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070)
NOW, THEREFORE, BE IT FURTHER RESOLVED that an appropriation from the officially adopted road fund budget
and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown:
PURPOSE PROGRAM SOURCE AMOUNT OF APPROPIATION
Preliminary Engineering Local
Preliminary Engineering Federal
TOTAL (Not Subject to 36.77.060)
Construction Engineering Local
Construction Local
Construction RATA
TOTAL
$16,250
$43,250
$60,000
$75,000
385 y 425
$2,4701000
$2,990,425
(Check appropriate box)
❑ This project is included in the officially adopted Annual Road Program as item No.
® This project is hereby made a part of the officially adopted Annual Road Program in
accordance with RCW 36.81.130
BE IT FURTHER RESOLVED: (Check appropriate box)
® The construction is to be accomplished by contract in accordance with RCW 36.81.130
❑ The construction is to be accomplished by county forces in accordance with RCW
36.77.060 and WAC 136-18
R
E�awv,,.`n*+�+.m`+'+�`'s'�' x.-s:sn.meuncuesn:sto-a_oi^; :ta-^,-.
C E I V
DATED this Day of 2022.gj
MAR
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
Yea Nay Abstain
Danny E. tone, Ch
ATTEST: � ❑ ❑ '
�---"-- . Rob Jo i -Cha r
=D
Barbara VasquezF-1
Clerk of the Board Cindy Car r, Member