HomeMy WebLinkAboutAgenda - Public WorksMarch 8, 2022
Time: 1:00 P.M.
AGENDA
1.0 Solid Waste (1 S min.).
Discussion Items:
1.1 —Solid Waste 2022 Rate Study (Sam C)
• Includes Phase 4 Construction
1.2 —Solid Waste Management Plan (Sam C)
1.3 —Pre and Post Closure Liabilities (Sam C)
2.0 Public Works General Update 05 min.)
Discussion Items:
3.0 Public Works En/Roads (1 S min.) ineerin
Discussion Items:
Grant County
Department of Public Works
124 Enterprise St. SE
Ephrata WA 98823
(509) 754-6082
3.1 Susan Kovich Engineering Support Role (Sam C and Sam D)
• Adams County and Adams County Engineer Support
3.2 —Stratford Road Culverts (Sam D)
4.0 Equipment Repair and Replacement 0S
Discussion Items:
PENDING
March 15, 2022
• Agreement with the City of Moses Lake
o Maintenance of Valley Road/Patton Boulevard
• Request to Purchase New Laminating Worktable with Rollers
• Request to Purchase New Printer/Plotter and Supplies
• Request to Purchase Overhead Crane Lift Motor
o For the Grant County Public Works Quincy Shop
Samuel Castro C.P.O. /Public Works Director
"To meet current and future needs, serving together with public and private entities, while fostering a respectful and successful work environment."
Consent
C.1— Adams County Reimbursable Request
C.2 — 2022 Broom Wafers Quote Award
C.3 — 2022 Grader Bits &Cover Plates Quote Award
C.4 — Request to Purchase Equipment Parts
• From the 2022 Equipment Rental& Replacement Fund Not on the 2022 Budget
C.5 — Request to Purchase 1000 70" Brown CRM w/Barb w/Stickers
• Through Washington State DES Contract #05115
C.6 — Award Recommendation for 2022 Asphalt Materials
Samuel Castro C.P.O./Public Works Director
"To meet current and future needs, serving together with public and private entities, while fostering a respectful and successful work environment."