HomeMy WebLinkAboutAgenda - Public WorksFebruary l,2022
Time: 1:30 P.M.
1.0 Solid Waste 5 min.
Discussion Items:
2.0 Public Works General Update (15 min.)
Discussion Items:
2.1—Snow Response Priorities (Sam Q
2.2 —Snow Problem Areas (Sam Q
2.3 — Covid Update (Decorah and Karen)
2.4 —Road Equipment Assessment (Sam Q
GRANT COUNTY
DEPARTMENT OF PUBLIC WORKS
124 ENTERPRISE ST. SE
EPHRATA WA 98823
(509) 754-6082
2.5 — Budget Process Transparency (Sam C and Loc)
3.0 Public Works aEn /Roads (15 min.) ineerigg
Discussion Items:
3.11- Major Projects Update (Keith )
3.12 - Accident Update (Keith)
3.13 -Road Division Updates (Keith)
3.2 —Pit Access E -SW Road (Keith)
3.3 — Agreement with the City of Moses Lake (Keith)
- Maintenance of Valley Road/Patton Boulevard
4.0 Equipment Repair and Replacement (15 min.)
Discussion Items:
SAMUEL CASTRO C.P.O. /PUBLIC WORKS DIRECTOR
"To MEET CURRENT AND FUTURE NEEDS, SERVING TOGETHER WITH PUBLIC AND PRIVATE: ENTITIES, WHILE FOSTERING A RESPECTFUL AND
SUCCESSFUL WORK ENVIRONMENT."
PENDING
February 8, 2022
- Bridge Inspection Agreement with WSDOT (Sam D)
-Interlocal Cooperation Agreement with Washington State Parks (Keith)
- For Road Maintenance
Consent
SAMUEL CASTRO C.P.O.IPUBLIC WORKS DIRECTOR
"TO MEET CURRENT AND FUTURE NEEDS, SERVING TOGETHER WITH PUBLIC AND PRIVATE ENTITIES, WHILE FOSTERING A RESPECTFUL AND
SUCCESSFUL WORK ENVIRONMENT."