Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution 18-054-CC
BOARD OF COUNTY COMMISSIONERS Grant County, Washington RESOLUTION TO INITIATE COUNTY RESOLUTION No. 18- D -CC ROAD PROJECT DESIGNATED AS CRP NO. 18-10 WHEREAS, IT IS HEREBY RESOLVED THAT B -SE Bridge Project on County Road B -SE Roadlog # 20550 at mileposts 0.24 to 0.44 be improved as follows; This project will remove 2 failing existing 36" Corrugated Metal Pipes and install a new pre- fabricated concrete slab bridge and other associated work. WHEREAS, This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070; NOW, THEREFORE, BE IT HEREBY RESOLVED THAT the Board of County Commissioners declare that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE Engineering Right of Way Acquisition PROGRAM SOURCE Local TOTAL (Not Subject to 36.77.060) Construction Local TOTAL (Check appropriate box) AMOUNT OF APPROPIATION $50,000 $0 $0 $200,000 250 000 ❑ This project is included in the officially adopted Annual Road Program as item No. ® This project is hereby made a part of the officially adopted Annual Road Program in accordance with RCW 36.81.130 N:\PW Company\SD\Project Docs\Resolutions to BOCC (New CRPs Etc.)\2018 CRP Resolutions\B-SE Bridge Project CRP 18-10 Resolution 2018 New format.docx Page 1 of 2 BE IT FURTHER RESOLVED: (Check appropriate box) ® The construction is to be accomplished by contract in accordance with RCW 36.81.130 ® The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18 DATED this day of 221V —, 2018. ATTEST: BOARD OF COUNTY COMMISSIONERS Yea Nay Abstain GRANT COUNTY, WASHINGTON Richard Stevens, Chair 1/ ❑ ❑ N:\PW Company\SD\Project Docs\Resolutions to BOCC (New CRPs Etc,)\2018 CRP Resolutions\B-SE Bridge Project CRP 18-10 Resolution 2018 New format.docx Page 2 of 2 ,� _� � � � � : a: � � � � � � . . � v. – - <� � � � � � � < «: \� � � � � � � � � � � � � � � � � � � a,.� � � � ? y ,� _� � � <� � «, � y� � \ �I� � � � � � � � <� . � � s . .; � . y � � � � � � � ' � � � � § � � � � � � � � � � � � � � 2� «� � � \ \ _ - . a� \��%«� � � � � � � � � � � ' � � £ 7� ^� � �\\�§��y� a�>«.: _ v� - � >� � � � «- � \� � � � � � � �� � ,� � � >� � � �� � J - � � � � � � � _ \ -� � a� � � � � � � � � � � �� � � � � : . « . _ � (� � � � � � � � - � � � � � � � � � � « .� \ ' ° . � � . § . .... � � « . � \� � � � � � ��� © � x� n<«,e � � © � ƒ:j \ ,� � «� � : � � a»� � » � < � a=« �� «,