HomeMy WebLinkAboutResolution 89-090-CC...RESUUTION-N0. _ 89 -90 -Cc
BEFORE THE BOARD OF COUNTY COMMISSIONERS of GRANT County, Washington.
In the matter of initiating a county road project designated as CRP NO. 89-15
IT IS HEREBY RESOLVED THAT the S i 1 i ca Road, State Road Log No. 30990
from Milepoint • 00 to Milepoint 4.33 be improved as follows:
Grade, drain, BST: surface to a finished 28' width
This project is hereby declared to be a public necessity and the county road engineer is hereby ordered and authorized to
report and proceed th ereon as by lauv provided. (RCW 36.75.050; -36:80."030, 36.80.070) (Optional References).
IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the county
engineer's estimate is hereby made in the amounts and for the purposes shown:
PURPOSE
Engineering
Right of Way Acquisition
TOTAL (Not subject to 36.77.060)
Construction
AMOUNT OF APPROPRIATION
$ 20,000.
-0-
580,000.
TOTAL $ 600,000.*
* NOTE: P.E. only in '1989'
(Check Appropriate Box)
] This project is included in the officially adopted annual road program as Item No. 22
0 The project is hereby made a part of the officially adopted annual road program in accordance with RCW 36.81.130.
IT IS FU RTH E R R ESO LV ED tnat: (Check appropriate box)
M The construction is to be accomplished by contract in accordance with RCW 36.77.020 et. seq.
�3 The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136.18.
Bituminous Surface Treatment Only.
ADOPTED this 12th day of September , 1989 ,
BOARD OF COUNTY COMMISSIONERS OF
ATTESQ LINTY
Clerk of Board
Recommended for use in connection with WAC 136.18.030.
FORM:°CRA9110