Loading...
HomeMy WebLinkAboutResolution 89-124-CCBOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON IN THE MATTER OF ADOPTING .. THE 1990 ANNUAL ROAD RESOLUTION NO. 89 -124 -CC PROGRAM WHERE -AS, pursuant to the requirements of R.C.W. 36.40.070, Grant County did prepare a 1990 Annual Road Construction Program, and a Comprehensive Road Program for the ensuing six years of 1990 - 1995, and WTiERFAS, in accordance with W.A.C. 136.16 an environmental assessment was made on all work within the Annual Program, and. WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearing was held and included the 1990 Annual Road Program, and WHEREAS, all comments and/or objections were heard and evaluated, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington that the 1990 Annual Road Construction Program attached hereto is hereby adopted. DONE THIS 12th DAY OF December ATTEST. Q lid r of the Hoard ,•_ Constituting the Board of County Commissioners of Grant County, Washington (8) TYPE OF WORK CODE A. GRADING & DRAINAGE F. SIDEWALKS B. BASE & TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. OR P.C.C. PAVEMENT 1. BRIDGES E. CURBS & GUTTERS J. FERRY FACILITIES ANNUAL CONSTRUCTION PROGRAM FOR 1990 DAY LABOR COMPUTATION (A) TOTAL CONSTRUCTION PROGRAM - columns (15) + (16) 8 3,811 (B) COMPUTED DAY LABOR LIMIT (see back). . . . . . . S 762 (C) TOTAL DAY LABOR PROGRAM - cotumn (16). . . . . . S 653 (Line C must be smaller than line B) AGENCY..ACTION County...........................GRANT Date of Submittal of Recommended Program....... Oct. 3, 1989 Date of Environmental Assessment .................. Date of Final Adoption...... Resolution No . ............. (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 (11) 1 (12) (13) 1 (14) 1 (15) 1 (16) (17) E A FUNDING SOURCE ESTIMATED EXPENDITURES WOOD) 6 YEAR LENGTH F C N S ROAD - U L TYPE V S OTHER FUNDS RIGHT CONSTRUCTION PROGRAM ROAD ROAD NAME AND/OR N A OF I E COUNTY PRELIM. OF GRAND ITEM ITEM LOG BRIDGE NUMBER LOCATION M.P. to M.P. TOTAL C S WORK R S FUNDS PROGRAM ENGR. WAY DAY TOTAL NO. NO. NO. T S N S (81000) (81000) SOURCE 541.11 541.20 CONTRACT LABOR 541.00 1 1 94020 BRIDGE #242 8 -NE 1.07 1.22 - .15 09 1 E 180 180 180 2 2 94010 BRIDGE 0243 6 -NE 4.80 4.94 .14 08 I E 145 145 145 3 3 44750 BRIDGE #202 N -NE 3.75 4.09 .34 08 1 E 4 151 BR 189 189 34 RAP 4 4 44750 N -NE ROAD 6 -NE TO 7 -NE 3.02 4.09 1.07 08 A,B,C E 275 250 25 275 5 5 NEW 10 -NE ROAD SR 17 TO H -NE 0.00 4.15 4.15 09 A,B I 102 2 100 102 6 6 91017 ADAMS ROAD SR 26 TO 10 -SW 0.00 3.23 3.23 07 A,B,C E 34 306 FAS 15 230 95 340 7 7 91017 BRIDGE #366 ADAMS ROAD 1.16 .02 07 1 E 8 32 FAS 5 35 40 8 8 91017 BRIDGE 9371 ADAMS ROAD 2.73 .02 07 1 E 8 32 FAS 5 35 40 9 9 95037 BRIDGE #101/RAILROAD ST. WILSON CREEK LP TO IST AVE 1.52 1.83 .31 07 I I 65 261 BR 26 290 10 326 10 10 95037 WILSON CREEK LOOP II SR 28 TO BRIDGE #101 1.14 1.61 .47 07 A,B,C E 9 47 FAS 10 34 12 56 11 11 52000 WILSON CREEK LOOP RAILROAD ST. TO SR 28 0.00 0.32 .32 08 A,B,C E 70 7 55 8 70 12 12 95037 RAILROAD ST. RR SIGNALIZATION RAILROAD ST. 1.61 1.64 .03 07 G E 1 105 FASP 100 6 106 13 13 94025 BRIDGE #157 STRATFORD 13.64 13.68 .04 07 I E 33 167 BR 15 185 200 14 14 91013 BRIDGE #399 A -SE ROAD 0.49 0.51 .02 08 1 E 14 56 BR 7 63 70 CRAB FORM NO. 3 (REV 6/87) PAGE/PROGRAM TOTALS => 948 1,191 92 1,791 256 2,139 PAGE 1 OF 3 C. (8) TYPE OF WORK CODE ---• A. GRADING & DRAINAGE F. SIDEWALKS B. BASE & TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. OR P.C.C. PAVEMENT I. BRIDGES E. CURBS & GUTTERS J. FERRY FACILITIES ANNUAL CONSTRUCTION PROGRAM FOR 1990 DAY LABOR COMPUTATION (A) TOTAL CONSTRUCTION PROGRAM - columns (15) + (16) S (8) COMPUTED DAY LABOR LIMIT (see back). . . . . . . S (C) TOTAL DAY LABOR PROGRAM - column (16). . . . . . S (Line C must be smatter than tine B) AGENCY ACTION County ....... ...................GRANT Date of Submittal of RecommendedProgram .................. Date of Environmental Assessment ..., ....................... Date of FinalAdoption............... Resolution No . ...................... (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 (11) 1 (12) (13) 1 (14) 1 (15) 1 (16) (17) E A FUNDING SOURCE ESTIMATED EXPENDITURES (81000) 6 YEAR LENGTH F C N S ROAD U L TYPE V S OTHER FUNDS RIGHT CONSTRUCTION PROGRAM ROAD ROAD NAME AND/OR N A OF I E COUNTY PRELIM. OF GRAND ITEM ITEM LOG BRIDGE NUMBER LOCATION M.P. to M.P; TOTAL C S WORK R S FUNDS PROGRAM ENGR. WAY DAY TOTAL NO. NO. NO. T S N S (81000) (81000) SOURCE 541.11 541.20 CONTRACT LABOR 541.00 15 26 36910 BRIDGE #316 F -NW 0.05 0.07 0.02 09 I I 2 8 BROS 10 69 79 16 15 45270 PATTON BLVD. ARLINGTON TO ANDREWS 0.00 1.01 1.01 16 A,B,D,E,F I 128 512 UAB 20 620 640 17 16 45270 PATTON BLVD. BIKE PATH ARLINGTON TO DOVER 0.35 16 H I 20 3 17 20 18 17 45010 DOVER ST. 30TH AVE. TO PATTON BLVD. 0.38 0.74 0.36 17 A,B,D,E,F 1 250 15 235 250 NEW 19 18 45010 DOVER ST. BIKE PATH PATTON BLVD. TO SR 17 0.50 17 H I 24 3 21 24 NEW 20 19 34050 8TH AVENUE 4TH NW TO SR 28 0.00 0.58 0.58 17 A,B,D,E,F I 25 266 UAB 15 318 333 42 Ephrata 21 20 45010 DOVER ST. ST 17 TO 30TH AVE. 0.00 0.38 0.38 17 A,B,D,E,F I 125 Nat.Guard 15 110 125 NEW 22 21 91030 DODSON ROAD 5 -NW TO 9 -NW 19.71 23.79 4.08 07 A,B,C E 110 10 100• 110 23 30 95025 BRIDGE #117 PINTO RIDGE 0.40 0.74 0.34 07 I E 2 8 FAS 10 10 24 63 51050 BRIDGE #116 LONG LAKE 0.60 0.90 0.30 08 I E 4 16 EROS 20 20 25 51 25500 BRIDGE #240 6 -SE 3.75 3.77 0.02 08 I E 3 12 BROS 15 15 26 26 44570 9 -NE ROAD M -NE TO N -NE 6.11 7.09 0.98 i 09 ABC E 40 2 38 40 CRAB FORM NO. 3 (REV 6/87) PAGE/PROGRAM TOTALS => 1,570 2,235 230 3,112 463 3,805 PAGE 2 OF 3 (8) TYPE OF WOK CODE A. GRADING & DRAINAGE F. SIDEWALKS B. BASE & TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. OR P.C.C. PAVEMENT I. BRIDGES E. CURBS & GUTTERS J. FERRY FACILITIES ANNUAL CONSTRUCTION PROGRAM FOR 1990 DAY LABOR COMPUTATION (A) TOTAL CONSTRUCTION PROGRAM - columns (15) + (16) $ (B) COMPUTED DAY LABOR LIMIT (see back). . . . . . . $ (C) TOTAL DAY LABOR PROGRAM - column (16). . . . . . $ (Line C must be smaller than line B) —AGENCY -ACTION County...........................GRANT Date of Submittal of Recommended Program .................. Date of Environmental Assessment ........................... Date of Final Adoption ............... Resolution No . ...................... (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 (11) 1 (12) (13) (14) 1 (15) 1 (16) 1 (17) E A FUNDING SOURCE ESTIMATED EXPENDITURES•($1000) 6 YEAR LENGTH F C N S ROAD U L TYPE V S - OTHER FUNDS RIGHT CONSTRUCTION PROGRAM ROAD ROAD NAME AND/OR N A OF I E COUNTY PRELIM. OF GRAND ITEM ITEM LOG BRIDGE NUMBER LOCATION M.P. to M.P. TOTAL C S WORK R S FUNDS PROGRAM ENGR. WAY DAY TOTAL NO. NO. NO. T S N S ($1000) ($1000) SOURCE 541.11 541.20 CONTRACT LABOR 541.00 27 26 30990 SILICA ROAD N -FRONTAGE TO SUNLAND RD. 0.00 4.33 4.33 08 ABC I 2 18 RAP 20 20 28 26 93047 SAGEBRUSH FLATS ROAD STATTER TO BAIRD SPRINGS 0.65 2.80 2.15 07 ABC E 2 13 RAP 15 15 29 26 MISC. BR. NOS. 212, 213, 214, 215 U -SE @ 1 -SE; U -SE a 5 -SE; - . - 07 G E 13 37 HES 4 46 50 STRATFORD a 9 -NE; 7 -NE a K -NE 30 26 MISC. MISCELLANEOUS PROJECTS COUNTY WIDE - - - ABC E 200 10 190 200 • CRAB FORM NO. 3 (REV 6/87) PAGE/PROGRAM TOTALS =i 1,787 2,303 279 3,158 653 4,090 PAGE 3 OF 3