HomeMy WebLinkAboutResolution 89-124-CCBOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
IN THE MATTER OF ADOPTING ..
THE 1990 ANNUAL ROAD RESOLUTION NO. 89 -124 -CC
PROGRAM
WHERE -AS, pursuant to the requirements of R.C.W. 36.40.070,
Grant County did prepare a 1990 Annual Road Construction Program, and
a Comprehensive Road Program for the ensuing six years of 1990 - 1995,
and
WTiERFAS, in accordance with W.A.C. 136.16 an environmental
assessment was made on all work within the Annual Program, and.
WHEREAS, pursuant to the requirements of R.C.W. 36.40.80,
a public hearing was held and included the 1990 Annual Road Program, and
WHEREAS, all comments and/or objections were heard and
evaluated,
NOW, THEREFORE, BE IT RESOLVED by the Board of County
Commissioners of Grant County, Washington that the 1990 Annual Road
Construction Program attached hereto is hereby adopted.
DONE THIS 12th DAY OF December
ATTEST.
Q lid r
of the Hoard
,•_
Constituting the Board of County Commissioners
of Grant County, Washington
(8) TYPE OF WORK CODE
A. GRADING & DRAINAGE F. SIDEWALKS
B. BASE & TOP COURSE G. TRAFFIC FACILITIES
C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS
D. A.C. OR P.C.C. PAVEMENT 1. BRIDGES
E. CURBS & GUTTERS J. FERRY FACILITIES
ANNUAL CONSTRUCTION PROGRAM FOR 1990
DAY LABOR COMPUTATION
(A) TOTAL CONSTRUCTION PROGRAM - columns (15) + (16) 8 3,811
(B) COMPUTED DAY LABOR LIMIT (see back). . . . . . . S 762
(C) TOTAL DAY LABOR PROGRAM - cotumn (16). . . . . . S 653
(Line C must be smaller than line B)
AGENCY..ACTION
County...........................GRANT
Date of Submittal of
Recommended Program....... Oct. 3, 1989
Date of Environmental
Assessment ..................
Date of Final Adoption......
Resolution No . .............
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10) 1
(11) 1
(12)
(13)
1 (14)
1 (15)
1 (16)
(17)
E A
FUNDING SOURCE
ESTIMATED EXPENDITURES WOOD)
6 YEAR
LENGTH
F C
N S
ROAD
-
U L
TYPE
V S
OTHER FUNDS
RIGHT
CONSTRUCTION
PROGRAM
ROAD
ROAD NAME AND/OR
N A
OF
I E
COUNTY
PRELIM.
OF
GRAND
ITEM
ITEM
LOG
BRIDGE NUMBER
LOCATION
M.P. to M.P.
TOTAL
C S
WORK
R S
FUNDS
PROGRAM
ENGR.
WAY
DAY
TOTAL
NO.
NO.
NO.
T S
N S
(81000)
(81000)
SOURCE
541.11
541.20
CONTRACT
LABOR
541.00
1
1
94020
BRIDGE #242
8 -NE
1.07
1.22 -
.15
09
1
E
180
180
180
2
2
94010
BRIDGE 0243
6 -NE
4.80
4.94
.14
08
I
E
145
145
145
3
3
44750
BRIDGE #202
N -NE
3.75
4.09
.34
08
1
E
4
151
BR
189
189
34
RAP
4
4
44750
N -NE ROAD
6 -NE TO 7 -NE
3.02
4.09
1.07
08
A,B,C
E
275
250
25
275
5
5
NEW
10 -NE ROAD
SR 17 TO H -NE
0.00
4.15
4.15
09
A,B
I
102
2
100
102
6
6
91017
ADAMS ROAD
SR 26 TO 10 -SW
0.00
3.23
3.23
07
A,B,C
E
34
306
FAS
15
230
95
340
7
7
91017
BRIDGE #366
ADAMS ROAD
1.16
.02
07
1
E
8
32
FAS
5
35
40
8
8
91017
BRIDGE 9371
ADAMS ROAD
2.73
.02
07
1
E
8
32
FAS
5
35
40
9
9
95037
BRIDGE #101/RAILROAD ST.
WILSON CREEK LP TO IST AVE
1.52
1.83
.31
07
I
I
65
261
BR
26
290
10
326
10
10
95037
WILSON CREEK LOOP II
SR 28 TO BRIDGE #101
1.14
1.61
.47
07
A,B,C
E
9
47
FAS
10
34
12
56
11
11
52000
WILSON CREEK LOOP
RAILROAD ST. TO SR 28
0.00
0.32
.32
08
A,B,C
E
70
7
55
8
70
12
12
95037
RAILROAD ST. RR SIGNALIZATION
RAILROAD ST.
1.61
1.64
.03
07
G
E
1
105
FASP
100
6
106
13
13
94025
BRIDGE #157
STRATFORD
13.64
13.68
.04
07
I
E
33
167
BR
15
185
200
14
14
91013
BRIDGE #399
A -SE ROAD
0.49
0.51
.02
08
1
E
14
56
BR
7
63
70
CRAB FORM NO. 3 (REV 6/87)
PAGE/PROGRAM TOTALS => 948
1,191 92 1,791 256 2,139
PAGE 1 OF 3
C.
(8) TYPE OF WORK CODE ---•
A. GRADING & DRAINAGE F. SIDEWALKS
B. BASE & TOP COURSE G. TRAFFIC FACILITIES
C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS
D. A.C. OR P.C.C. PAVEMENT I. BRIDGES
E. CURBS & GUTTERS J. FERRY FACILITIES
ANNUAL CONSTRUCTION PROGRAM FOR 1990
DAY LABOR COMPUTATION
(A) TOTAL CONSTRUCTION PROGRAM - columns (15) + (16) S
(8) COMPUTED DAY LABOR LIMIT (see back). . . . . . . S
(C) TOTAL DAY LABOR PROGRAM - column (16). . . . . . S
(Line C must be smatter than tine B)
AGENCY ACTION
County ....... ...................GRANT
Date of Submittal of
RecommendedProgram ..................
Date of Environmental
Assessment ..., .......................
Date of FinalAdoption...............
Resolution No . ......................
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10) 1
(11) 1
(12)
(13)
1 (14)
1 (15) 1
(16)
(17)
E A
FUNDING SOURCE
ESTIMATED EXPENDITURES (81000)
6 YEAR
LENGTH
F C
N S
ROAD
U L
TYPE
V S
OTHER FUNDS
RIGHT
CONSTRUCTION
PROGRAM
ROAD
ROAD NAME AND/OR
N A
OF
I E
COUNTY
PRELIM.
OF
GRAND
ITEM
ITEM
LOG
BRIDGE NUMBER
LOCATION
M.P. to M.P;
TOTAL
C S
WORK
R S
FUNDS
PROGRAM
ENGR.
WAY
DAY
TOTAL
NO.
NO.
NO.
T S
N S
(81000)
(81000)
SOURCE
541.11
541.20
CONTRACT
LABOR
541.00
15
26
36910
BRIDGE #316
F -NW
0.05
0.07
0.02
09
I
I
2
8
BROS
10
69
79
16
15
45270
PATTON BLVD.
ARLINGTON TO ANDREWS
0.00
1.01
1.01
16
A,B,D,E,F
I
128
512
UAB
20
620
640
17
16
45270
PATTON BLVD. BIKE PATH
ARLINGTON TO DOVER
0.35
16
H
I
20
3
17
20
18
17
45010
DOVER ST.
30TH AVE. TO PATTON BLVD.
0.38
0.74
0.36
17
A,B,D,E,F
1
250
15
235
250
NEW
19
18
45010
DOVER ST. BIKE PATH
PATTON BLVD. TO SR 17
0.50
17
H
I
24
3
21
24
NEW
20
19
34050
8TH AVENUE
4TH NW TO SR 28
0.00
0.58
0.58
17
A,B,D,E,F
I
25
266
UAB
15
318
333
42
Ephrata
21
20
45010
DOVER ST.
ST 17 TO 30TH AVE.
0.00
0.38
0.38
17
A,B,D,E,F
I
125
Nat.Guard
15
110
125
NEW
22
21
91030
DODSON ROAD
5 -NW TO 9 -NW
19.71
23.79
4.08
07
A,B,C
E
110
10
100•
110
23
30
95025
BRIDGE #117
PINTO RIDGE
0.40
0.74
0.34
07
I
E
2
8
FAS
10
10
24
63
51050
BRIDGE #116
LONG LAKE
0.60
0.90
0.30
08
I
E
4
16
EROS
20
20
25
51
25500
BRIDGE #240
6 -SE
3.75
3.77
0.02
08
I
E
3
12
BROS
15
15
26
26
44570
9 -NE ROAD
M -NE TO N -NE
6.11
7.09
0.98
i
09
ABC
E
40
2
38
40
CRAB FORM NO. 3 (REV 6/87)
PAGE/PROGRAM TOTALS => 1,570 2,235 230 3,112 463 3,805
PAGE 2 OF 3
(8) TYPE OF WOK CODE
A. GRADING & DRAINAGE F. SIDEWALKS
B. BASE & TOP COURSE G. TRAFFIC FACILITIES
C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS
D. A.C. OR P.C.C. PAVEMENT I. BRIDGES
E. CURBS & GUTTERS J. FERRY FACILITIES
ANNUAL CONSTRUCTION PROGRAM FOR 1990
DAY LABOR COMPUTATION
(A) TOTAL CONSTRUCTION PROGRAM - columns (15) + (16) $
(B) COMPUTED DAY LABOR LIMIT (see back). . . . . . . $
(C) TOTAL DAY LABOR PROGRAM - column (16). . . . . . $
(Line C must be smaller than line B)
—AGENCY -ACTION
County...........................GRANT
Date of Submittal of
Recommended Program ..................
Date of Environmental
Assessment ...........................
Date of Final Adoption ...............
Resolution No . ......................
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10) 1
(11) 1
(12)
(13) (14) 1 (15)
1 (16) 1
(17)
E A
FUNDING SOURCE
ESTIMATED EXPENDITURES•($1000)
6 YEAR
LENGTH
F C
N S
ROAD
U L
TYPE
V S
-
OTHER FUNDS
RIGHT
CONSTRUCTION
PROGRAM
ROAD
ROAD NAME AND/OR
N A
OF
I E
COUNTY
PRELIM.
OF
GRAND
ITEM
ITEM
LOG
BRIDGE NUMBER
LOCATION
M.P. to M.P.
TOTAL
C S
WORK
R S
FUNDS
PROGRAM
ENGR.
WAY
DAY
TOTAL
NO.
NO.
NO.
T S
N S
($1000)
($1000)
SOURCE
541.11
541.20
CONTRACT
LABOR
541.00
27
26
30990
SILICA ROAD
N -FRONTAGE TO SUNLAND RD.
0.00
4.33
4.33
08
ABC
I
2
18
RAP
20
20
28
26
93047
SAGEBRUSH FLATS ROAD
STATTER TO BAIRD SPRINGS
0.65
2.80
2.15
07
ABC
E
2
13
RAP
15
15
29
26
MISC.
BR. NOS. 212, 213, 214, 215
U -SE @ 1 -SE; U -SE a 5 -SE;
- . -
07
G
E
13
37
HES
4
46
50
STRATFORD a 9 -NE; 7 -NE a K -NE
30
26
MISC.
MISCELLANEOUS PROJECTS
COUNTY WIDE
- - -
ABC
E
200
10
190
200
• CRAB FORM NO. 3 (REV 6/87) PAGE/PROGRAM TOTALS =i 1,787 2,303 279 3,158 653 4,090
PAGE 3 OF 3