Loading...
HomeMy WebLinkAboutResolution 93-031-CCt• RESOLUTION NO. 93-31—CC _ BEFORE THE BOARD OF COUNTY COMMISSIONERS of _ Grant County, Washington. in the matter of initiating a county road project designated as CRP NO. 93-16_ , IT IS HEREBY RESOLVED THAT the Division .2—NW Road, State Road Log No. 34201 from Milepoint 0.00 to Milepoint 0.12 be improved as follows: (Insert a brief description of the road or bridge intprovernent contemplated by this resolution) To grade, drain, place crushed surfacing, and apply a BST for a finished width of 28 feet. This project is hereby declared to be a public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law provided. fRCty 36.7.5.050, 36.80.030, 36.80.070) (Optional References). IT IS FURTHER RESOLVED that an appropriation from the off iciallyadopted road fund budget and based on the county engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT OF APPROPRIATION Engineering Right of Way Acquisition TOTAL (Not subject to 36.77.060) Construction TOTAL 117 4,500.00 (Check appropriate Box) E1 This project is included in the officially adopted annual road program as Item No. 27—C 500.00 5,000.00 0 The project is hereby made a part of the officially adopted annual road program in accordance with RCW 36.81.130. IT IS FURTHER RESOLVED that: (Check appropriate box) 0 The construction is to be accomplished by contract in accordance with RC�V 36.77.020 et. seq. ® The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18. ADOPTED this n� day of�'� BOARD OF COUNTY COMMISSIONERS OF ATT EST COUNTY, WASH. 4/ . r _ o Recommended for use in connection with WAC 13618.030. FORM: C14AD 1 io w PROJECT SITE DIVISION.2-N 19-N 20-N 28