ItESOLUTION No. 17-099-CC
WHEREAS,the Grant County Sheriff's Office does not have an adequate level of
budget appropriation to malce the following expenditures:
• Fund#001,Department#115 in the amount of$10,500.00 to purchase a new Carrier
5 ton pacicage heat pump to replace the failed one at their Worlc Release Facility '
• Request for einergency repair of the ceiling in a jail cell, damaged by an inmate.
Stan's Construction and Son, LLC can perform the work for the amount of �
$2,778.84. A budget extension is also being requested to Fund#001,
Department#115 as they do not have the funds in their current budget for this �
expense.
• Request for einergency replacement of the evaporator coil in the wallc-in cooler at the �
Worlc Release Facility. Basin Refrigeration and Heating can perform t11e worlc for
the approximate amount of$ 3,550.00. A budget extension is also being requested ,
rund#001 Department#115 as they do not have the funds in their current budget for �
this expense.
WHEREAS, these additional budget expenditures were not anticipated when preparing �
the 2017 budget; and
WHEREAS, in accordance with RCW 36,40.140 a public hearing, must be held to �
authorize additional budget appropriations.
WHEREAS, on the 20th day of November, 2017 at 9:30 a.m., a public heai•ing was held
in the Grant County Commissioners' Hearing Room, '
i
i
NOW, THEI2EFORE, BE IT HEREI3Y RESOLVED BY THE BOARI) OF j
COUNTY COMMISSIpNERS OF GRANT COUNTY, STATE OF WASHINGTON, that a ;
budget appropriation in the total amount of$16,828.84 to be allocated to the 2017 budget �
according to the following schedule of categories and items: �
i
�
i
�
;
Page 1 of 2
N;\StafflBVasquez\Resolution-Ordinance\Budget Exteusions\Sheriffs Office Budget Extension 112017.docx
1
i
,,
`
�
APPRt7PItIATIQNS & FINANCING SQURCES I
{See Attaclzed}
FASSED.AND ADOPTED this��day of ��r��;ti�V , 2417.
BOATaD OF COUNTY ,
COMMISSIONERS '
Ye�, Nay Abstain T COU TY dVASHINGTON I
�� ❑ ❑ � , j
Cindy ar r, C air �
�
ATT�ST: � � � ic ard tevens, Vice-Chair '�
� � i , �
r, : �}
, , I
` �l.J ���0 ❑ ❑ � 1
arbara J. as uez � ,� .'� �'1.�. .�.%' -� _._
� q Ton�Taylor, Mem� '
C1erk of the Board
� �� '
,
�
!
i
i
I
I
i`
i
�
;
�
�i
,�
. �
�I
l
I
,
i
Page 2 of 2 j
N;iStafflBVasc�uealResolutiorrQrdinauce113udget Extensionslsheriffs Office Budget Extensio»112417.doc� '
i
R5: ATTACHMENT TO RES.
2017 Budget Extension
Fund#001 Department# 115 �
REVENUES:
i
�
Revenue '
001.000.00.0000.308000000 $16,828.84
i
i
$16,828.84 �
EXPENDITURES: �
Account Number:
001,115.00.0000.523504800 '
$3,550.00 i
001.115.00.0000.523504800 $2,778.84
001.115,00.0000.594236400 $10,500.00 ;
�
$16,828,84
EXPLANATION
Budget extension for GC Sl�eriff's office-Jail for: a)New Heat pump to replace failed one at Worlc Rele�se �
Facility($10,500); b)Repair of ceiling in a jail cell damaged by an inmate($2,778.84); and c)Wallc-in cooler '
evaporator coil replacement at Worlc Release Facility($3,550.00)