Loading...
HomeMy WebLinkAboutResolution 93-157-CCBOARD OF COUNTY, COMMISSIONERS GRANT COUNTY, WASHINGTON IN THE MATTER OF ADOPTING THE 1994 ANNUAL ROAD PROGRAM RESOLUTION NO. 93 -157 -CC WHEREAS, pursuant to the requirements of R.C.W. 36.40.070, Grant County did prepare a 1994 Annual Road Construction Program, and a Comprehensive Road Program for the ensuing six years of 1994 - 1999, and WHEREAS, in accordance with W.A.C. 136.16 an environmental assessment was made on all work within the Annual Program, and WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearing was held and included the 1994 Annual Road Program, and WHEREAS, all comments and/or objections were heard and evaluated, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington that the 1994 Annual Road Construction Program attached hereto is hereby adopted. DONE tH15 DAY OF ATTEST: /4-, � of the Board .,G,. , .......... .. _ ......... Chairman I 1� % Commissioner Commissioner Constituting the Board of County Commissioners of Grant County, Washington PgAR tA4111A an z #DON/ 4 t lOT1 ANNUAL CONSTRUCTION PROGRAM FOR 1994 9 ABC E (7) TYPE Of WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS b BIKEWAYS D. A.C. /P.C.C. PAVEMENT 1. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 6 YEAR 80 Date of Submittal of ROAD (A) TOTAL CONSTRUCTION PROGRAM - column (14) ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (include brief termini description of MP's; Bridge #) ITEM ITEM LOG (B) COMPUTED DAY LABOR LIMIT (see back) NO. NO. NO. 0.74 1 1 38940 MARTIN RD (SR 28 TO E -NW) (C) TOTAL DAY LABOR PROGRAM - column (15) STP 36940 - MP 0.00 TP MP 0.90 8734 40 GRADE, DRAIN, SURFACE (BST). BRIDGE REPLACEMENT #315.. June 15 , 1993 FINISHED WIDTH = 34 FT. 2 2 91035 FRENCHMAN HILL RD (BEVIBURKE TO ADAMS) Date of Fina( Adoption 91044 91035 - MP 5.85 TO MP 10.73 91013 91044 - MP 0.00 TO MP 1.05 E Resolution No. 91013 -MP 14.88 TO MP 15.34 (51 (8) (7) (8) 1 (9) __ __1 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 3 3 20800 13-SW/SE (DIVISION -S TO SR 282) 1 (14) ► (15) II (18) 20800 - MP 0.00 TO MP 1.01 SOURCES OF FUNDS E S T I M A T E D SURFACE (BST); FINISHED WIDTH = 28 FT 4 4 91042 27 -SW RD (L -SW TO O -SW) OTHER =UNDS 91042 -MP 0.99 TO MP 4.00 CONSTR JCT(ON 4315 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 5 5 51800 BRIDGE #104, 31 -NE PRELIMINARY RIGHT 51800 - MP 0.30 TO MP 0.50 GRAND C S l E BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 6 8 45010 DOVER ST (SR 17 TO PATTON BLVD) OF WAY 45010 - MP 0.00 TO MP 0.74 (Miles) T S (See work R S (81,000) GRADE, DRAIN, SURFACE (ACP), CURB AND GUTTER SOURCE 595.10 FINISHED WIDTH = 48 FT. 7 7 91017 BRIDGE 0395, L.5 -SW 91017- MP 8.23 TO MP 6.45 BRIDGE REPLACEMENT; FINISHED WIDTH - 34 FT. 8 8 34200 BRIDGE #122, 19 -NW 825 34200 - MP 2.32 TO MP 2.64 8440 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. PgAR tA4111A an z #DON/ 4 t lOT1 ANNUAL CONSTRUCTION PROGRAM FOR 1994 1.01 9 ABC E 450 80 AGENCY ACTION DAY LABOR COMPUTATION 40 450 850 3.01 COUNTY: GRANT 4120 40 - - - 8fl 80 Date of Submittal of 8120 (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) $5,233,000 835 4139 Recommended Program June 7, 1993 (B) COMPUTED DAY LABOR LIMIT (see back) 40 8800,000 0.74 16 ABDEF Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) STP $797,000 8734 40 Assessment June 15 , 1993 8105 TiA Date of Fina( Adoption Dec. , 1993 11 : • Line (C) must be smaller than Line (81 • • 0.22 7 1 E Resolution No. 93- -CC (51 (8) (7) (8) 1 (9) __ __1 (10) 1 (11) (12) ► (13) 1 (14) ► (15) II (18) F C TYPE E A SOURCES OF FUNDS E S T I M A T E D E X P E N D I T U R E S (81,000'al PROJECT U L OF N S COUNTY OTHER =UNDS CONSTR JCT(ON 4315 LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S l E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Miles) T S (See work R S (81,000) (811000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N 0.90 8 AM E 858 4244 SR 825 8392 823 8440 8140 RAP 8.59 7 ABC E 4109 4895 STP 443 4891 4130 4884 480 RAP 1.01 9 ABC E 450 80 - - - 80 40 450 850 3.01 8 ABC E 4120 40 - - - 8fl 80 8120 8120 0.20 8 1 E 835 4139 BROS 411 4163 40 4174 0.74 16 ABDEF E 4875 STP 846 8734 40 8780 8105 TiA 0.22 7 1 E 4123 4150 SR 416 4257 40 4273 0.34 8 I E 45 430 BROS 420 8317 813 8350 4315 RAP Pan^ 1 of 3 ' 7 1 A fT1 TYPE Of WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT I. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES 11) (2) (3) (4) 8 YEAR Date of Submittal of STP ROAD 85,233,000 ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (Include brief tetmini description of MP's; Bridge #) ITEM ITEM LOG 8800,000 NO. NO. NO. Date of Environmental 9 9 95037 BRIDGE 0130, R -NE 8797,000 9 ABC 95037 - MP 18.87 TO MP 19.08 Assessment June 15 , 1993 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 10 Carryover 92015 BRIDGE 0218, LIND COULEE E 92045 92015 -MP 0.21 TO MP 0.44 11 ' • Line (C) must be smaller than Line 1B) 92030 BRIDGE #205, R -SE 9 1 E 92045 -MP 5.87 TO MP 5.98 93- -Cc (5) (8) (7L _(8) (9) BRIDGE #208, 3 -SE 01) (12) 1 92030 -MP 0.00 TO MP 0.10 (14) (15) (18) SAFETY PROJECT; APPROACH GUARD RAIL INSTALLATION 11 10 93010 BRIDGE 0358, 5 -NW (41,000's) PROJECT U L OF N S COUNTY 93010 -MP 14.99 TO MP 15.21 UNDS BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 12 11 91030 DODSON RD (SR 28 TO FRENCHMAN HILLS) 91030 - MP 0.00 TO MP 5.90 RIGHT 3R (BST); FINISHED WIDTH = 34 FT 13 Carryover 37949 A -NW RD (SR 282 to DRUMHELLER RD) ENGINEERING OF WAY 37949 - MP 0.00 TO MP 0.13 TOTAL (Miles) T S (See work R S (81,000) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 14 12 NEW MARINE VIEW RID 93-3 CONTRACT DAY LABOR 595.00 NEW GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH 24, 28, & 34 FT. 15 14 93035 BRIDGE #338 - MONUMENT HILL 0.21 7 1 E 83 8104 93035 - MP 1.34 TO MP 1.55 48 BRIDGE REPLACEMENT; FINISHED WIDTH - 28 FT. 18 15 93025 BRIDGE #345, R -NW RAP 93025 - MP 0.87 TO MP 0.88 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. NNUAL CONSTRUCTION PROGRAM FOR 1994 0.22 7 1 E $132 AGBVCY ACTION DAY LABOR COMPUTATION COUNTY: GRANT 5.90 7 ABC E 879 Date of Submittal of STP (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (151 85,233,000 Recommended Program June 7 , 1993 (B) COMPUTED DAY LABOR LIMIT (see beck) 8800,000 9 A E Date of Environmental 40 (C) TOTAL DAY LABOR PROGRAM -column (15) 40 8797,000 9 ABC E Assessment June 15 , 1993 RID 40 0.21 8 1 E Date of Final Adoption Dec. , 1993 11 ' • Line (C) must be smaller than Line 1B) 43 0.21 9 1 E Resolution No. 93- -Cc (5) (8) (7L _(8) (9) (10) 1 01) (12) 1 (13) (14) (15) (18) F C TYPE E A SOURCES OF FUNDS E S T I M _A T E D £ X P E N 0 1 T U R E S (41,000's) PROJECT U L OF N S COUNTY OTHER UNDS CONSTR JCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Miles) T S (See work R S (81,000) (811000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N S 0.21 7 1 E 83 8104 BR 48 8122 80 $130 823 RAP 0.44 7 HES E 812 888 HES 88 8118 40 8128 381 827 HES 419 HES 0.22 7 1 E $132 BR 810 433 RAP 5.90 7 ABC E 879 8508 STP 837 4182 RAP 0.13 9 A E 410 40 --- 40 3.75 9 ABC E 4231 RID 40 0.21 8 1 E 45 445 RAP 43 0.21 9 1 E 45 841 RAP 43 8155 80 8185 8590 8120 4747 40 410 410 40 8231 4231 847 80 450 443 80 448 CPAR FnRM NO Z IRFV 111411 Purse i of 3 CRA 13 FORM NO. 'i (RFV 1 1 /911 ANNUAL CONSTRUCTION PROGRAM FOR 1994 Q) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. SITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT 1. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 8 YEAR ROAD ROAD/PROJECT NAME AND LOCATION CONSTRUCTION PROGRAM - column 114) PROGRAM ROAD (Include brief termini description of MP's; Bridge 0) ITEM ITEM LOG (B) COMPUTED DAY LABOR LIMIT (see back) NO. NO, NO, 17 17 91030 DODSON RD (9 -NE TO SR 282) $797,000 91030 - MP 23.79 TO MP 29.71 Assessment June 15, 1993 ACP OVERLAY; FINISHED WIDTH = 34 FT. 18 18 93047 SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NE) Date of Final Adoption Dec. , 1993 93047 - MP 3.10 TO MP 9.37 must be smeller than Line (B) GRADE, DRAIN, SURFACE (BST), FINISHED WIDTH - 28 FT. 19 19 93045 B -NN( RD (SR 28 TO WEST CANAL BRIDGE) (5) (8) (7) (8) J (9) 93045 - MP 0.00 TO MP 1.31 (11) (12) j 113) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 20 20 21700 BASELINE EAST RD (POTATO HILL TO SR 17) E S T I M A T E D E X P E N D I T U R E S 21740 21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.80 U L OF N S COUNTY OTHER :UNDS GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 38 FT. 21 50 41890 AIRWAY DRIVE (FAIRGROUNDS TO SR 17) N A WORK V S FUNDS 41890 - MP 1.89 TO 3.21 PRELIMINARY RIGHT GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER; C S ! E FINISHED WIDTH = 50 FT. 22 23 92015 M -SE RD (SR 17 TO SR 282) TOTAL (Miles) T S (See work R S 92015 - MP 0.00 TO MP 8.48 ($1,000) SOURCE 595.10 SURFACE (ACP); FINISHED WIDTH = 34 FT. 23 24 92015 BRIDGE 0238, MCDONALD RD — 92015 - MP 1.47 TO MP 1.88 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 24 25 92015 BRIDGE ,0230, MCDONALD RD $43 $907 $0 92015 -MP 4.84 TO MP 4.85 8.27 7 ABC E $7 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 25 - - - - MISCELLANEOUS PROJECTS $77 *INCLUDES COST SHARE PROJECTS CRA 13 FORM NO. 'i (RFV 1 1 /911 ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGD11CY ACTION DAYLABOR CON4PUrA77ON COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column 114) + (15) $5,233,000 Recommended Program June 7, 1993 (B) COMPUTED DAY LABOR LIMIT (see back) $800,000 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) $797,000 Assessment June 15, 1993 Date of Final Adoption Dec. , 1993 �i • • Line (C) must be smeller than Line (B) Resolution No. 93- -CC (5) (8) (7) (8) J (9) (10) (11) (12) j 113) I (14) (15) (18) F C TYPE E A SOURCES OF FUNDS E S T I M A T E D E X P E N D I T U R E S (11,000's) PROJECT U L OF N S COUNTY OTHER :UNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S ! E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Miles) T S (See work R S ($1,000) ($1,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N S--- — 5.92 7 D E $850 CAPP $43 $907 $0 $850 8.27 7 ABC E $7 $70 RAP $77 $0 $0 $77 (PE ONLY) 1.31 7 ABC E 32 $20 RAP $22 $0 s0 $22 WE ONLY) 2.37 7 ABC E $3 $17 STP $13 $0 $0 $13 (PE ONLY) 1.32 18 ABDEF E $8 $87 STP $31 $0 $0 $31 $8 TIA (PE ONLY) 0.20 7 1 E $1 $9 STP $10 $O $0 $10 (PE ONLY) 0.20 7 1 E $1 $8 STP $9 $0 $0 $9 (PE ONLY) 0.21 7 1 E $1 $5 STP $e $0 $0 $8 (PE ONLY) ... ... ABC E $100 $0 --- $0 $0 $100 $100 'rogram Totals = = a > $735 $4,998 $441 $O $4,438 $797 $5,874 Paoe 3 of 3