Loading...
HomeMy WebLinkAboutResolution 93-168-CCBOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON IN THE MATTER OF ADOPTING THE GRANT COUNTY BUDGET FOR THE RESOLUTION #93- 16&CC 1994 YEAR WHEREAS, the Board of County Commissioners of Grant County, Washington met in regular session on the 6th of December, 1993, pursuant to public notice as provided by law, for the purpose of adopting the itemized budget for the 1994 year; and WHEREAS, said meeting was continued from day to day, until the 28th day of December, 1993 convening each session day for the purpose of considering said budget; and WHEREAS, the details of the budget having been considered and fixed, and there being no objection thereto; NOW, THEREFORE, BE IT HEREBY RESOLVED that the Grant 'County budget for 1994 expenditures be, and it is hereby adopted according to RCW 36.40.080 in the amounts as itemized and attached hereto. DONE THIS 28th DAY OF DECEMBER, 1993 BOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON / �"-,airman ATTESq A lf6/ Clerk of thecfd/ ���- 1994 APPROPRIATIONS CURRENT EXPENSE FUND #001 DEPARTMENT NUMBER AND NAME AMOUNT 101 COMMISSIONERS $ 241,238.00 102 DISTRICT COURT 909,126.00 103 SUPERIOR COURT 494,653.00 104 AUDITOR 537,031.00 105 CLERK 390,263.00 106 TREASURER 464,033.00 107 ASSESSOR 649,479.00 108 ELECTIONS 212,297.00 109 PROSECUTING ATTORNEY 762,314.00 110 CIVIL SERVICE 10,195.00 111 PLANNING 154,074.00 112 COURTHOUSE FACILITIES 502,115.00 113 DISABILITY BOARD 2,914.00 114 SHERIFF 2,323,356.00 115 JAIL 1,104,140.00 116 BUILDING/FIRE MARSHAL 215,218.00 117 JUVENILE SERVICES 1,083,488.00 118 HORTICULTURIST 1,476.00 119 MUSEUM 33,414.00 120 CORONER 111,755.00 122 EXTENSION SERVICES 273,908.00 124 DISPATCH/9-1-1 461,458.00 125 MISC. GENERAL GOVT. 276,302.00 126 BOARD OF EQUALIZATION 9,496.00 127 BOARD OF ADJUSTMENT 2,943.00 128 T. B. HOSPITALIZATION 7,000.00 129 INTERFUND COMMUNICATIONS 266,530.00 130 ADDICTIONS BOARD 2,950.00 131 BOUNDARY REVIEW BOARD 4,282.00 132 SUPPORT ENFORCEMENT 261,135.00 133 INDIGENT DEFENSE 422,800.00 134 WTSC WEAR -IT PROGRAM 56,815.00 141 CAPITAL OUTLAY 89,025.00 142 OPERATING TRANSFERS -OUT 240.342.00 TOTAL APPROPRIATIONS $12.577.565.00 1994 REVENUE ESTIMATE CURRENT EXPENSE FUND #001 TAXES LICENSES & PERMITS INTERGOVERNMENTAL REVENUE CHARGES FOR SERVICES FINES & FORFEITS MISCELLANEOUS OTHER FINANCING SOURCES TOTAL REVENUE ESTIMATE 6,815,579.00 261,600.00 2,211,397.00 861,887.00 856,850.00 786,273.00 783.979.00 $12.577.565.00 1994 APPROPRIATIONS OTHER FUNDS FUND NUMBER AND NAME AMOU. SPECIAL REVENUE FUNDS 348,797.00 101 COUNTY ROADS $20,802,700.00 102 EMERGENCY SERVICES 65,835.00 103 PATHS AND TRAILS 301,497.00 104 SOLDIERS AND SAILORS RELIEF 22,225.00 106 INTERLOCAL DRUG FUND 30,822.00 107 FEDERAL DRUG SEIZURES 10,000.00 109 STATE DRUG SEIZURES 72,611.00 110 LAW LIBRARY 33,874.00 111 TREASURERS O & M 21,500.00 112 JAIL CONCESSION 32,500.00 114 TOURIST ADVERTISING 34,500.00 115 ALCOHOL & DRUG ABUSE 593,854.00 116 COUNTY FAIR 575,947.00 117 PEST AND DISEASE CONTROL 2,210.00 119 ALL TERRAIN VEHICLES 127,600.00 120 PROSECUTORS CRIME VICTIM COMP. 18,487.00 121 LAW & JUSTICE 602,550.00 122 LONGVIEW TRACTS CRID 1,373.00 123 EXTENSION EQUIPMENT MAINT. 3,250.00 124 AUDITOR'S O & M 29,768.00 125 ADMISSIONS TAX 264,794.00 126 GROWTH MANAGEMENT 78,581.00 127 NOXIOUS WEED CONTROL 438,000.00 160 GATEWAY C.R.I.D. 2,805.00 161 HILLCREST CRID 4.728.00 TOTAL SPECIAL REVENUE FUNDS $24.172.011.00 DEBT SERVICE FUND 201 GENERAL OBLIGATION BOND -92 112,870.00 PROPRIETARY FUNDS 401 SOLID WASTE 2,851,063.00 402 DEVELOPMENTAL DISABILITIES RESIDENTIAL 348,797.00 408 MENTAL HEALTH, DEVEL.DISAB.ADMIN. 2,683,424.00 501 DATA PROCESSING 244,500.00 503 INSURANCE 365,000.00 504 EMPLOYEE BENEFIT 1,450,000.00 510 EQUIPMENT RENTAL & REPAIR 6,681,200.00 560 PITS & QUARRIES 1,843,300.00 570 SIGN SHOP 99,300.00 TOTAL PROPRIETARY $15.463.368.00 TRUST/AGENCY FUND EMERG.SERV.COMMUN[CATIONS DISTRICT 202,000.00 t 171 TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT 1. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (11 (2) (3) (4) 8 YEAR ROAD ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (include brief termini description of We; Bridge #) ITEM ITEM LOG NO. NO. NO. 1 1 36940 MARTIN RD (SR 28 TO E -NW) 38940 - MP 0.00 TP MP 0.90 GRADE, DRAIN, SURFACE (BST), BRIDGE REPLACEMENT #315.. FINISSHED WIDTH - 34 FT. 2 2 91035 FRENCHMAN HILL RD (BEVISURKE TO ADAMS) 91044 91035 - MP 5.85 TO MP 10.73 91013 91044 - MP 0.00 TO MP 1.05 91013 -MP 14.68 TO MP 15.34 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 3 3 20800 13-SW/SE (DIVISION -S TO SR 2BZ) 20800 -MP 0.00 TO MP 1.01 SURFACE (BST): FINISHED WIDTH = 28 FT 4 4 91042 27 -SW RD (L -SW TO O -SW) 91042 - MP 0.99 TO MP 4.00 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH o 28 FT. 5 5 51800 BRIDGE #104, 31 -NE 51600 - MP 0.30 TO MP 0.50 BRIDGE REPLACEMENT; FINISHED WIDTH - 28 FT. 6 8 45010 DOVER ST (SR 17 TO PATTON BLVD) 45010 - MP 0.00 TO MP 0.74 GRADE, DRAIN, SURFACE (ACP), CURB AND GUTTER FINISHED WIDTH = 48 FT. 7 7 91017 BRIDGE #395, L.5 -SW 91017 -MP 8.23 TO MP 8.45 BRIDGE REPLACEMENT; FINISHED WIDTH - 34 FT. B 8 34200 BRIDGE #122, 19 -NW 34200 - MP 2.32 TO MP 2.84 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. ANNUAL CONSTRUCTION PROGRAM FOR 1994 CRAB FORM NO. 3 (REV 11191) Page 1 of 3 AGENCY ACTION DAY LABOR COMPUTA77ON COUNTY: GRANT Data of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) t 05) $5,233,000 Racammandad Program June 7, 1993 (B) COMPUTED DAY LABOR LIMIT (see back) 6800,000 Date of Environmental (C) TOTAL DAY LABOR PROGRAM -column (15) 6797,000 Assessment June 15, 1993 Date of Final Adoption Dec. 1993 �( • • fine 40 must be -,alter than Line 161 • • 11 Resolution No. 93. 157 -CC (5) (8) (7) (B)i (9) 1 (10) 1 111) 412) 1 (13) 1 114) 1 fist H (16) F C TYPE E Al SCURCES OF FUNDS E S T I M A T E D E X P E N D I T U R E S (61.000'6) PROJECT U LOF N COUNTY OTHER -UNDS CONSTR'JCTION I LENGTH N A WORK V FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL Miss) T S (See work R (611000) (61,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 code-) N S 0.90 8 ASCI E 658 6244 BR 625 6392 623 6440 6140 RAP 6.59 7 ABC E 6109 6895 STP 643 6891 6130 6884 680 RAP 1.01 9 ABC E 650 60 --- 60 60 650 650 3.01 8 ABC E 6120 60 ... 60 60 61201 6120 0.20 8 1 E 635 6139 BROS 611 6183 60 6174 0.74 18 ABDEF E 6875 STP 646 6734 60 6780 6105 TIA 0.22 7 1 E 6123 6150 SR 618 6257 60 6273 0.34 8 1 E 65 630 BROS 620 6317 613 6350 6315 RAP CRAB FORM NO. 3 (REV 11191) Page 1 of 3 CRAB FORM NO. 3 (REV 11191) Page 2 of 3 ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGENCY ACTION l7J TYPE OF WORK CODE DAY LABOR COMPUTA77ON COUNTY: GRANT Date of Submittal of A. GRADING AND DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - edumn 04) + (15) $5,233,000 Recommended Program June 7 , 1993 S. BASE AND TOP COURSE G. TRAFFIC FACILITIES (8) COMPUTED DAY LABOR'LIMIT (see back) 4800,000 Data of Environmental C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR PROGRAM - cofumn (15) $797,000 Assessment June 15 , 1993 D. A.C. 1P.C.C. PAVEMENT 1. BRIDGES Date of Final Adoption Dec. , 1993 E. CURBS AND GUTTERS J. FERRY FACILITIES II • • Line IC) must be smaller than Line 491 * * 11 Readution No. 83- -CC (I) (2) (3) (4) (5) (8) (7) (8) (9) I (10) (11) f12) 1 (13) 1 (14) 1 (15) 11 (18) 8 YEAR F C TYPE E A SC URC ES OF FUNDS E S T I M A T E D E X P E N D I T U R E S ($1,000'2) ROAD ROAD/PROJECT NAME AND LOCATION PROJECT U L OF N S COUNTY OTHER :UNDS CONSTR JCTION PROGRAM ROAD (include brief termini description of MP's; Bridge #) LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND ITEM ITEM LOG C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL NO. NO. NO. (Miles) T S (See work R S ($1,000) ($11000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codec) N S_—•-- 9 9 95037 BRIDGE 8130, R -NE 0.21 7 1 E $3 $104 BR $8 $122 $0 $130 95037 - MP 18.87 TO MP 19.08 $23 RAP BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 10 Carryover 92015 BRIDGE #218, LIND COULEE 0.44 7 HES E $12 $88 HES $8 $118 $0 $128 92045 92015 -MP 0.21 TO MP 0.44 &8 $27 HES 92030 BRIDGE 9205, R -SE $19 HES 92045 -MP 5.87 TO MP 5.98 BRIDGE #208, 3 -SE 92030 -MP 0.00 TO MP 0.10 SAFETY PROJECT; APPROACH GUARD RAIL INSTALLATION 11 10 93010 BRIDGE 0358, 5 -NW 0.22 7 1 E $132 8R $10 $155 $0 $185 93010 - MP 14.99 TO MP 15.21 $33 RAP BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 12 11 91030 DODSON RD (SR 28 TO FRENCHMAN HILLS) 5.90 7 ABC E $79 $508 STP $37 $590 4120 $747 91030 - MP 0.00 TO MP 5.90 $182 RAP 3R (BST); FINISHED WIDTH = 34 FT 13 Carryover 37949 A -NW RD (SR 282 to DRUMHELLER RD) 0.13 9 A E $10 $0 --- 40 $0 $10 $i0 37949 - MP 0.00 TO MP 0.13 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH – 28 FT. 14 12 NEW MARINE VIEW RIO 93-3 3.75 9 ABC E $231 RID $0 $0 $231 $231 NEW GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH 24, 28, & 34 FT. 15 14 93035 BRIDGE 0338 - MONUMENT HILL 0.21 8 1 E 45 $45 RAP 43 $47 $0 $50 93035 - MP 1.34 TO MP 1.55 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 18 15 93025 BRIDGE 0345, R -NW 0.21 9 1 E 55 $41 RAP $3 $43 $0 $48 93025 - MP 0.87 TO MP 0.88 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. CRAB FORM NO. 3 (REV 11191) Page 2 of 3 f7J TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. 1P.C.C. PAVEMENT I. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 8 YEAR ROAD ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (include brief [ennin) description of MP's; Bridge #) )TEM )TEM LOG NO. NO, NO. 17 17 91030 DODSON RD (9 -NE TO SR 282) 91030 - MP 23.79 TO MP 29.71 ACP OVERLAY; FINISHED WIDTH - 34 FT. 18 18 93047 SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NE) 93047 - MP 3.10 TO MP 9.37 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. is 19 93045 B -NW RD (SR 28 TO WEST CANAL BRIDGE) 93045 - MP 0.00 TO MP 1.31 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH — 34 FT. 20 20 21700 BASELINE EAST RD (POTATO HILL TO SR 17) 21740 21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.80 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH a 38 FT. 71 5o 41890 AIRWAY DRIVE (FAIRGROUNDS TO SR 17) 41890 - MP 1.89 TO 3.21 GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER; FINISHED WIDTH = 50 FT. 22 23 92015 M -SE RD (SR 17 TO SR 282) 92015 - MP 0.00 TO MP 8.48 SURFACE (ACP); FINISHED WIDTH - 34 FT. 23 24 92015 BRIDGE #238, MCDONALD RD 92015 - MP 1.47 TO MP 1.88 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 24 25 92015 BRIDGE #230, MCDONALD RD 92015 - MP 4.84 TO MP 4.85 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 25 - - - - MISCELLANEOUS PROJECTS' 'INCLUDES COST SHARE PROJECTS CRAB FORM NO. 3 (REV 11(91) ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGFJYCYACTfON DAY LABOR COA(PttrA77ON COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) t (15) 65,233,000 Recommended Program Juno 7, 1993 (8) COMPUTED DAY LABOR UM)T (see back) 4800,000 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) 4797,000 Assessment June 15 , 1993 Date of Final Adoption Dec. , 1993 N ' • fine (C) must be smallm than Line I Resolution No. 93- -CC (5) (8) 17) (81 19) i (10) i (11) (12) i (13) 1 (141 f (15) li (18) F C TYPE E A SOURCES OF FUNDS E S T I M A T E D E X P E N O 1 T U R E S (61.000'x) PROJECT U L OF N 5 COUNTY OTHER l)NDS CONSTRJCTION LENGTH N A WORK V 5 FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Miles) T S (See worst R S (41,000) (61,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N S 5.92 7 D E 6850 CAPP 643 6807 60 6850 8.27 7 ABC E 67 470 RAP 477 60 60 677 (PE ONLY) 1.31 7 ABC E 42 420 RAP 422 60 60 422 (PE ONLY) 2.37 7 ABC E 63 617 STP 613 40 60 413 WE ONLY) 1.32 18 ABDEF E 48 487 STP 431 40 60 431 68 TIA (PE ONLY) 8.48 7 D E 61 69 STP 410 60 40 410 (PE ONLY) 0.20 7 1 E 41 48 STP 69 60 60 49 (PE ONLY) 0.21 7 1 E 61 65 STP 68 40 40 48 (PE ONLY) --- --- ABC E 6100 60 --- 60 6o 6100 4100 .1rogram Totals 4735 44.998 4441 40 44.438 6797 45.974 Page 3 of 3 CRAB FORM NO. 3 (REV 11191) Page 2 of 3 ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGBVCY ACTION (7/ TYPE OF WORK CODE DAY LABOR COMPUTATION COUNTY: GRANT • Date of Submittal of A. GRADING AND DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - column 114) + (1S) 65,233,000 Recommended Program June 7 , 1993 B. BASE AND TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back) 6800,000 Date of Environmental C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR PROGRAM - column 115) 6797,000 Assessment June 15, 1993 D. A.C. IP.C.C. PAVEMENT I. BRIDGES_ Date of Final Adoption Dec. , 1993 E. CURBS AND GUTTERS J. FERRY FACILITIES �e (CI must be ama9er than Line (B) • • h Resolution No. 93• -CC 41) f2) 13) 14) (5) (8) (7) 18) (9) I (10) I (11) 112) I (13) 1 (14) I (15) N (18) 8 YEAR F C TYPE E A SOURCES OF FUNDS E S T I M A T E D E X P£ N 0 1 T U A E S tOt,004'e) ROAD ROADIPROJECT NAME AND LOCATION PROJECT U L OF N S COUNTY OTHER 'UNDS CONSTR'KTION PROGRAM ROAD (Include brief termini description of MP's; Bridge #) LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND ITEM ITEM LOG C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL NO. NO. NO. (Miles) T S {Sae work R 5 (61,000) (611000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N c 9 9 95037 BRIDGE #130, R -NE 0.21 7 1 E 63 6104 BR 68 6122 60 6130 95037 - MP 18.87 TO MP 19.08 623 RAP BRIDGE REPLACEMENT; FINISHED WIDTH = 2e FT. 10 Carryover 92815 BRIDGE #218, LIND COULEE 0.44 7 HES E 612 688 HES 68 6118 60 6128 92045 92015 -MP 0.21 TO MP 0.44 &8 627 HES 92030 BRIDGE #205, R -S£ 619 HES 92045 -MP 5.87 TO MP 5.98 BRIDGE #208, 3 -SE 92030 -MP 0.00 TO MP 0.10 SAFETY PROJECT; APPROACH GUARD RAIL INSTALLATION 11 10 93010 BRIDGE #358, 5 -NW 0.22 7 1 E 6132 BR 610 6155 60 6185 93010 - MP 14.99 TO MP 15.21 633 RAP BRIDGE REPLACEMENT; FINISHED WIDTH - 34 FT, 12 11 91030 DODSON RD (SR 28 TO FRENCHMAN HILLS) 5.90 7 ABC E 679 6508 STP 637 6590 6120 6747 91030 - MP 0.00 TO MP 5.90 6182 RAP 3R (BST); FINISHED WIDTH — 34 FT 13 Carryovar 37949 A -NW RD (SR 282 to DRUMHELLER RD) 0.13 9 A E 610 60 ... 60 60 610 610 37949 - MP 0.00 TO MP 0.13 GRADE, DRAIN, SURFACE (SST); FINISHED WIDTH = 28 FT. i 14 12 NEW MARINE VIEW RID 93-3 3.75 9 ABC E 6231 RID 60 60 6231 6231 NEW GRADE, DRAIN, SURFACEMST); FINISHED WIDTH 24, 28, & 34 FT. 15 14 93035 BRIDGE #338 - MONUMENT HILL 0.21 B 1 E 65 645 RAP 63 647 60 650 93035 - MP 1.34 TO MP 1.55 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 18 15 93025 BRIDGE 0345, R -NW 0.21 9 1 £ 65 641 RAP 63 643 to, 648 93025 - MP 0.87 TO MP 0.88 BRIDGE REPLACEMENT; FINISHED WIDTH — 34 FT. CRAB FORM NO. 3 (REV 11191) Page 2 of 3 M TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS $ BIKEWAYS D. A.C. /P.C.C. PAVEMENT I. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 8 YEAR ROAD ROADIPROJECT NAME AND LOCATION PROGRAM ROAD (Include brief termini description of MP's; Bridge #) ITEM ITEM LOG NO. NO. NO. 17 17 91030 DODSON RD (9 -NE TO SR 282) 91030 - MP 23.79 TO MP 29.71 ACP OVERLAY; FINISHED WIDTH - 34 FT. 18 18 93047 SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NE) 93047 - MP 3.10 TO MP 9.37 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 19 19 93045 B -NW RD (SR 28 TO WEST CANAL BRIDGE) 93045 - MP 0.00 TO MP 1.31 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 20 20 21700 BASELINE EAST RD (POTATO HILL TO SR 17) 21740 21780 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.80 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH - 38 FT. 21 50 41890 AIRWAY DRIVE (FAIRGROUNDS TO SR 17) 41890 - MP 1.89 TO 3.21 GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER; FINISHED WIDTH — 50 FT. 22 23 92015 M -SE RD (SR 17 TO SR 282) 92015 - MP 0.00 TO MP 8.48 SURFACE (ACP); FINISHED WIDTH = 34 FT. 23 24 92015 BRIDGE #238, MCDONALD RD 92015 - MP 1.47 TO MP 1.88 BRIDGE REPLACEMENT; FINISHED WIDTH — 34 FT. 24 25 92015 BRIDGE #230, MCDONALD RD 92015 - MP 4.84 TO MP 4.85 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 25 --- MISCELLANEOUS PROJECTS' 'INCLUDES COST SHARE PROJECTS CRAB FORM NO. 3 (REV 111911 ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGENCYACTION DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) 45,233,000 Recommended Program Juno 7 , 1993 (8) COMPUTED DAY LABOR LIMIT (ace back) 4800,000 Date of Environmental (C) TOTAL DAY LA80R PROGRAM -column (15) 4797,000 Assessment June 15 , 1993 _ Date of Final Adoption Dec. , 1993 `Line fCf moat be smeller Phan Lme IB) • * 7� Resolution No. 93- -CC (5) (8) (7) (8) (9) { (10) I (11) I 412) I (13) I (14) ( (15) II (18) F C TYPE E A SOURCES OF FUNDS ( E S T I M A T E D E X P E N D I T U R E S (41.000's) PROJECT U L OF N S COUNTY OTHER UNDS CONSTRJCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Miles) T S (See work R S (41,000) (411000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codas) N S 5.92 7 D E 4850 CAPP 443 4807 40 4850 8.27 7 ABC E 67 470 RAP 477 40 40 677 (PE ONLY) 1.31 7 ABC E 62 420 RAP 622 E0 40 422 (PE ONLY) 2.37 7 ABC E 43 417 STP 413 40 40 413 (PE ONLY) 1.32 18 ABDEF E 48 487 STP 431 40 40 631 48 TIA (PE ONLY) 8.48 7 D E 61 69 STP 410 40 40 410 (PE ONLY) 0.20 7 1 E 41 48 STP 49 40 40 69 (PE ONLY) 0.21 7 1 E 61 45 STP fib 40 60 48 (PE ONLY) ••. ABC E 4100 40 --- 40 40 4100 4100 .'rogram Totals = _ _ _ _ > I 4735 44.998 4441 40 44.438 4797 45.874 Page 3 of 3 U) TYPE OF WORK CODE c A. GRADING AND DRAINING F. SIDEWALKS 8. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS G BIKEWAYS D. A.C. /P.C.C. PAVEMENT 1. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) 121 (3) (4) 8 YEAR ROAD ROADIPROJECT NAME AND LOCATION PROGRAM ROAD (Include brie( termini description of MP's; Bridge #) ITEM ITEM LOG NO. NO. NO. 1 1 38940 MARTIN RD (SR 28 TO E -NW) 38940 - MP 0.00 TP MP 0.90 GRADE, DRAIN, SURFACE (BST), BRIDGE REPLACEMENT #315.. FINISHED WIDTH = 34 FT. 2 2 91035 FRENCHMAN HILL RD (BEVJBURKE TO ADAMS) 91044 91035 - MP 5.85 TO MP 10.73 91013 91044 - MP 0.00 TO MP 1.05 91013 -MP 14.88 TO MP 15.34 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 3 3 20800 13-SW/SE (DIVISION -S TO SR 282) 20800 - MP 0.00 TO MP 1.01 SURFACE (BST); FINISHED WIDTH = 28 FT 4 4 91042 27 -SW RD (L -SW TO O -SW) 91042 - MP 0.99 TO MP 4.00 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT, 5 5 51800 BRIDGE #104, 31 -NE 51800 - MP 0.30 TO MP 0.50 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 8 8 45010 DOVER ST (SR 17 TO PATTON BLVD) 45010 - MP 0.00 TO MP 0.74 GRADE, DRAIN, SURFACE (ACP), CURB AND GUTTER FINISHED WIDTH = 48 FT. 7 7 91017 BRIDGE #395, L.5 -SW 91017 -MP 8.23 TO MP 8.45 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 8 8 34200 BRIDGE #122, 19 -NW 34200 - MP 2.32 TO MP 2.84 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. ANNUAL CONSTRUCTION PROGRAM FOR 1994 CRAB FORM NO. 3 (REV 11/91) Page 1 of 3 AGSVCY ACT)M DAY LABOR COATP(JiATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column 04) t 05) $5,233,000 Recommended Program June 7, 1993 (8) COMPUTED DAY LABOR LIMIT (see back) 6800,000 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) $797,000 Assessment June 15 , 1993 Date of Fine! Adoption Dec. 1993 lL 'tine fC) must be smeller than line {B} • • I� Resolution No. 93� -CC (5) (8) (7) (8) (91 I (101 I (11) f121 I 113) I f141 i (15) fl f181 F C TYPE E A SCURCES OF FUNDS E S T 1 M A T E D E X P E N D 1 T U R E S 1$1.000'*) PROJECT U L OF N 5 COUNTY OTHER -:UNDS CONSTR_'!CT(ON LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Miles) T S (See wok R S ($1,000) (61,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N P 0.90 8 ASCI E $58 $244 OR $25 $392 $23 6440 $140 RAP 8.59 7 ABC E $109 $895 STP $43 $891 $130 $884 $80 RAP 1.01 9 ABC E 650 60 --- t0 60 $50 650 3.01 8 ABC E $120 60 --- 60 60 $120 $120 0.20 8 1 E 635 $139 BROS $11 $183 40 $174 0.74 18 ABDEF E $875 STP 648 $734 $0 $780 $105 TIA 0.22 7 1 E $123 6150 BR t18 $257 $0 $273 0,34 8 1 E 65 $30 BROS $20 $317 $13 $350 $315 RAP CRAB FORM NO. 3 (REV 11/91) Page 1 of 3 S�� ` R s (7) TYPE Of WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. IP.C.C. PAVEMENT I. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) 14) 8 YEAR ROAD ROADIPROJECT NAME AND LOCATION PROGRAM ROAD (Include brief termini description of MP's; Bridge 0> ITEM ITEM LOG NO. NO, NO. 1 1 38940 MARTIN RD (SR 28 To E -NW) 38940 - MP 0.00 TP MP 0.90 GRADE. DRAIN. SURFACE (BST), BRIDGE REPLACEMENT 0315.. FINISHED WIDTH a 34 FT. 2 2 91035 FRENCHMAN HILL RD (8EVIBURKE TO ADAMS) 91044 91035 - MP 5.85 TO MP 10.73 91013 91044 - MP 0.00 TO MP 1.05 91013 -MP 14.88 TO MP 15.34 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 3 3 20800 13-SW/SE (DIVISION -S TO SR 202) 20800 - MP 0.00 TO MP 1.01 SURFACE (BST); FINISHED WIDTH - 28 FT 4 4 91042 27 -SW RD (L -SW TO O -SW) 91042 -MP 0.99 TO MP 4.00 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH - 28 FT. 5 5 51800 BRIDGE 0104, 31 -NE 51800 - MP 0.30 TO MP 0.50 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 8 8 45010 DOVER ST (SR 17 TO PATTON BLVD) 45010 - MP 0.00 TO MP 0.74 GRADE, DRAIN, SURFACE (ACP), CURB AND GUTTER FINISHED WIDTH = 48 FT. 7 7 91017 BRIDGE 0395, L.5 -SW 91017 -MP 8.23 TO MP 8.45 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 8 8 34200 BRIDGE 0122, 19 -NW 34200 - MP 2.32 TO MP 2.84 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGENCY ACTION DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) 65,233,000 Recommended Program June 7, 1993 (B) COMPUTED DAY LABOR LIMIT (see back) $800,000 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) 6797,000 Assessment June 15, 1993 Data of Final Adoption Dec. 1993 �( _ • Una tC) moat h esmal( thaniina(B)-� Resolution No. 93-� -CC 15_x)_ - (7) (8) (9) (10) (i 1) (12) 1 (13) (14) (15) 11 (18) F C TYPE E A SOURCES OF FUNDS E S T( M A T E D E X P E N D T U R E S (61.000'x) PROJECT U L OF N S COUNTY OTHER :)NDS _ LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT _CON_S_T_PJ_C_T)O_N___ _ GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Milos) T S (See work R S (61,000) (61,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 Crvleal N S 0.90 8 ABCI E 658 6244 BR 625 6392 623 4440 6140 RAP 8.59 7 ABC E 6109 6895 STP 643 6891 6130 6884 680 RAP 1.01 9 ABC E 650 40 --- 40 60 650 650 3.01 8 ABC E 6120 40 --- 40 60 6120 6120 0.20 8 I E 635 6139 BROS 611 6183 60 4174 0.74 18 ABDEF E 6875 STP 648 6734 60 6780 6105 TIA 0.22 7 1 E 4123 6150 BR 618 6257 60 4273 0.34 8 I E 65 630 BROS 420 4317 413 6350 6315 RAP CRA9 FORM NO. 3 (REV 11191) Page 1 01 3 CRAB FORM NO. 3 (REV 11/911 Page 2 of 3 ANNUAL CONSTRUCTION PROGRAM FOR 1994 • AGENCY ACTION 17) TYPE OF WORK CODE DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of A. GRADING AND DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) 65,233,000 Recommended Program June 7. 1993 B. BASE AND TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see beck) 6800,000 Date of Environmental C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR PROGRAM - column (15) 6797,000 Asseesmant Juns IS, 1993 D. A.C. /P.C.C. PAVEMENT 1. BRIDGES Date of Final Adoption Dec. , 1993 E. CURBS AND GUTTERS J. FERRY FACILITIES j ' • Une (C! must be smeller then Line (e) " II Resolution No. 93- -CC (1) (2) (3) (4) (5) (B) (7) (8) (9) I 110) I (Ill 1121 I 031 I 1141 1 (15) H (18) 8 YEAR F C TYPE £ A SOURCES OF FUNDS E S T I M A T E D F_. X P E N D I T U R E S (61.000's) ROAD ROAD)PROJECT NAME AND LOCATION PROJECT U L OF N S COUNTY OTHER =UNDS CONSTR')CTION PROGRAM ROAD (include brief termini description of MP's; Bridge A) LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND ITEM ITEM LOG C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL NO. NO. NO. (Miles) T S (see work R S (61,000) (61,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N E 9 9 95037 BRIDGE 6130, A -NE 0.21 7 1 E 63 6104 BR 68 6122 60 6130 95037 - MP 18.87 TO MP 19.08 623 RAP BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT, 10 Carryover 92015 BRIDGE 6218, UND COULEE 0.44 7 HES E 612 688 HES 48 6118 60 6128 92045 92015 -MP 0.21 TO MP 0.44 &E 627 HES 92030 BRIDGE 6205, R -SE 619 HES 92045 -MP 5.87 TO MP 5.98 BRIDGE 6206, 3 -SE 92030 -MP 0.00 TO MP 0.1 O SAFETY PROJECT; APPROACH GUARD RAIL INSTALLATION 11 10 93010 BRIDGE 6358, 5 -NW 0.22 7 1 E 6132 SR 610 6155 60 6165 93010 - MP 14.99 TO MP 15.21 633 RAP BRIDGE REPLACEMENT; FINISHED WIDTH - 34 FT. 12 11 91030 DODSON RD (SR 28 TO FRENCHMAN HILLS) 5.90 7 ABC E 679 6508 STP 637 6590 6120 6747 91030 - MP 0.00 TO MP 5.90 6182 RAP 3R (BST); FINISHED WIDTH = 34 FT 13 Carryover 37949 A -NW RD (SR 282 to DRUMHELLER RD) 0.13 9 A E 610 40 ... 60 60 610 610 37949 - MP 0.00 TO MP 0.13 GRADE, DRAIN, SURFACE (EST); FINISHED WIDTH = 28 FT. 14 12 NEW MARINE VIEW RID 93-3 3.75 9 ABC E 6231 RID 60 60 6231 6231 NEW GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH 24, 28, & 34 FT. 15 14 93035 BRIDGE 6338 - MONUMENT HILL 0.21 8 ( E 65 645 RAP 63 447 60 650 93035 - MP 1.34 TO MP 1.55 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 18 15 93025 BRIDGE 6345, R -NW 0.21 9 1 E 65 641 RAP 63 643 60 648 93025 - MP 0.87 TO MP 0.88 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. CRAB FORM NO. 3 (REV 11/911 Page 2 of 3 ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGENCYACTOON 01 TYPE OF WORK CODE DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of A. GRADING AND DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - column (14) + 115) 45,233,000 Recommended Program June 7 , 1993 8, BASE AND TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (vee beck) 4800,000 Date of Environmental C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR PROGRAM -column (15) 4797,000 Assessment June 15 , 1993 D. A.C. /P.C.C. PAVEMENT I. BRIDGES Date of F(ne1 Adoption Dec. , 1993 E. CURBS AND GUTTERS J. FERRY FACILITIES I • • Line (C) must be smeller then Line 181 " Resolution No. 93- -CC tt) 42) 13) 44) (5) (8) (7) 18) (9) I (10) 1 (11) i (121 I (13) 1 (14) (15) I18) 8 YEAR F C TYPE E A SOURCES OF FUNDS ( E S T I M A T E D E X P E N D I T U R E S (41.000's) ROAD ROADIPROJECT NAME AND LOCATION PROJECT U L OF N S COUNTY OTHER :UNDS CONSTR'JCTION PROGRAM ROAD (Include brief termini description of MP's; Bridge :) LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND ITEM ITEM LOG C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL NO. NO. NO. (Miles) T S (See work R S (41,000) (41,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N S 17 17 91030 DODSON RD (9 -NE TO SR 282) 5.92 7 D E 4850 CAPP 443 4807 40 4850 91030 - MP 23.79 TO MP 29-71 ACP OVERLAY; FINISHED WIDTH - 34 FT. 18 18 93047 SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NE) 8.27 7 ABC E 47 470 RAP 477 40 40 477 93047 - MP 3.10 TO MP 9.37 WE ONLY) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 19 19 93045 B -NW RD (SR 28 TO WEST CANAL BRIDGE) 1.31 7 ABC E 42 420 RAP 422 40 40 422 93045 - MP 0.00 TO MP 1.31 (PE ONLY) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 20 20 21700 BASELINE EAST RD (POTATO HILL TO SR 17) 2.37 7 ABC E 43 417 STP 413 40 40 413 21740 21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.80 (PE ONLY) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH a 38 FT. 21 50 41890 AIRWAY DRIVE (FAIRGROUNDS TO SR 17) 1.32 18 ABDEF E 48 487 STP 431 40 40 431 41890 - MP 1.89 TO 3.21 48 TIA GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER; (PE ONLY) FINISHED WIDTH = 50 FT. 22 23 92015 M -SE RD (SR 17 TO SR 282) 8.48 7 D E 41 49 STP 410 40 40 410 92015 - MP 0.00 TO MP 8.48 (PE ONLY) SURFACE (ACP); FINISHED WIDTH = 34 FT. 23 24 92015 BRIDGE /238, MCDONALD RD 0.20 7 1 E 41 48 STP $9 40 40 49 92015 - MP 1.47 TO MP 1.88 (PE ONLY) BRIDGE REPLACEMENT; FINISHED WIDTH - 34 FT. 24 25 92015 BRIDGE 0230, MCDONALD RD 0.21 7 1 E 41 45 STP 48 40 40 48 92015 - MP 4.84 TO MP 4.85 (PE ONLY) BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 25 - --- MISCELLANEOUS PROJECTS' --- --- ABC E 4100 40 --- 40 40 4100 4100 'INCLUDES COST SHARE PROJECTS Program Totals = _ _ _ _ > 4735 44.998 4441 40 $4.438 $7071 45.874 CRAB FORM NO. 3 (REV 11/91) Pogo 3 of 3 (71 TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT I. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (U (2) (3) (4) 8 YEAR ROAD ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (include brief termini description of MPs; Bddgo #) ITEM ITEM LOG NO. NO. NO. 1 1 38940 MARTIN RD (SR 28 TO E-NWI 38940 - MP 0.00 TP MP 0.90 GRADE. DRAIN, SURFACE (BST), BRIDGE REPLACEMENT #315.. FINISHED WIDTH - 34 FT. 2 2 91035 FRENCHMAN HILL RD (BEVIBURKE TO ADAMS) 91044 81035 - MP 5.85 TO MP 10.73 91013 91044 - MP 0.00 TO MP 1.05 91013 -MP 14.68 TO MP 15.34 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 3 3 20800 13-SW1SE (DIVISION -S TO SR 282) 20800 - MP 0.00 TO MP 1.01 SURFACE (BST); FINISHED WIDTH - 28 FT 4 4 91042 27 -SW RD (L -SW TO O -SW) 91042 - MP 0.99 TO MP 4.00 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH - 28 FT. 5 5 51800 BRIDGE #104, 31 -NE 51600 - MP 0.30 TO MP 0.50 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 8 8 45010 DOVER ST (SR 17 TO PATTON BLVD) 45010 - MP 0.00 TO MP 0.74 GRADE, DRAIN, SURFACE (ACP), CURB AND GUTTER FINISHED WIDTH = 48 FT. 7 7 91017 BRIDGE #395, L.5 -SW 91017 -MP 8.23 TO MP 8.45 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 8 $ 34200 BRIDGE #122, 19 -NW 34200 - MP 2.32 TO MP 2.54 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGENCY ACTION DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column 114) + (15) 65,233,000 Recommended Program June 7, 1893 (B) COMPUTED DAY LABOR LIMIT (ase back) 6800,000 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) 6797.000 Assessment June 15, 1993 Date of Final Adoption Dec. 1993 Il :: Linn (C) must be smaller than Line (B) •: h Resolution No. 93-�� -GC f5) 48) 171 191 19) I (10) I 111) (12) I (131 1 f141 I 4151 h f18) F C TYPE E A SOURCES OF FUNDS E S T 1 M A T E D E X P E N D I T U R E S 441.0WO PROJECT U L OF N S COUNTY OTHER'UNDS CONSTRICTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Miles) T S (See work R S (61,000) (61,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N S 0.90 8 ABCI E 658 6244 BR 625 6392 623 6440 6148 RAP 8.59 7 ABC E 6109 6895 STP 643 6891 6130 6884 680 RAP 1.01 9 ABC E 650 60 --- 60 60 650 650 3.01 8 ABC E 6120 60 --- 60 60 6120 6120 0.20 8 1 E 635 6139 BROS 611 6183 60 6174 0.74 18 ABDEF E 6875 STP 648 6734 60 6780 6105 TiA 0.22 7 1 E 6123 6150 ER 618 6257 60 6273 0.34 8 1 E 65 630 BROS 620 6317 613 6350 6315 RAP CRAB FORM NO. 3 (REV 11191) Page 1 of 3 ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGENCY ACTION (71 TYPE OF WORK CODE DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of A. GRADING AND DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) 65,233,000 Recommended Program June 7 , 1993 B. BASE AND TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (a" back) 6800,000 Date of Environmantal C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR PROGRAM - column (15) 6797,000 Assessment June 15 , 1993 D. A.C. 1P.C.C. PAVEMENT 1. BRIDGES Date of Final Adoption Doc. , 1993 E. CURBS AND GUTTERS J. FERRY FACILITIES K •• Line (C) must be smatter than Line IB Resolution No. 93- -CC (1) (2) (3) L} f5) (8) (7) (8}Ij_ 19) L_ (10) 1 I11} (12) 1_. _ (13) + (14)",_L-(15) N_ _ fie) 8 YEAR F C TYPE E SCURCES OF FUNDS E S T I M A T E D E X P E N 0 f T U R E S (61,000's) ROAD ROAD/PROJECT NAME AND LOCATION PROJECT U LF N COUNTY OTHER TUNDS CONSTR"JCTION PROGRAM ROAD (Include brief termini description of MPs; Bridge #) LENGTH N A WORK V FUNDS PRELIMINARY RIGHTj GRAND ITEM ITEM LOG C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL NO. NO. NO. (Miles) T S (See work R (61,000) (61,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 codes) N I 9 9 95037 BRIDGE #130, R -NE 0.21 7 1 E 63 6104 SR 68 6122 60 6130 95037 - MP 18.87 TO MP 19.08 623 RAP BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 10 Carryover 92015 BRIDGE #218, LIND COULEE 0.44 7 MES E 612 688 HES 68 6118 60 6128 92045 92015 -MP 0.21 TO MP 0.44 &E 627 HES 92030 BRIDGE #205, R -SE 619 HES 92045 -MP 5.87 TO MP 5.98 BRIDGE #208, 3 -SE 92030 -MP 0.00 TO MP 0.10 SAFETY PROJECT; APPROACH GUARD RAIL INSTALLATION 11 10 93010 BRIDGE #358, 5 -NW 0.22 7 1 E 6132 BR 610 6155 60 6185 93010 - MP 14.99 TO MP 15.21 633 RAP BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 12 11 91030 DODSON RD (SR 28 TO FRENCHMAN HILLS) 5.90 7 ABC E 679 6506 STP 637 6590 6120 6747 91030 - MP 0.00 TO MP 5.90 6182 RAP 3R (BST); FINISHED WIDTH = 34 FT 13 Carryover 37949 A -NW RD (SR 282 to DRUMHELLER RD) 0.13 9 A E 610 60 . - - 60 60 610 610 37949 - MP 0.00 TO MP 0.13 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 F(. 14 12 NEW MARINE VIEW RID 93-3 3.75 9 ABC E 6231 RID $0 60 6231 6231 NEW GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH 24, 28, & 34 FT. 15 14 93035 BRIDGE #338 - MONUMENT HILL 0.21 8 1 E 65 645 RAP 63 647 60 650 93035 • MP 1.34 TO MP 1.55 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 18 15 93025 BRIDGE 0345, R NW 0.21 9 1 E 65 641 RAP 63 643 60 648 93025 - MP 0.87 TO MP 0.88 BRIDGE REPLACEMENT; FINISHED WIDTH - 34 FT, CRAB FORM NO. 3 (REV 11191) Page 2 of 3 (7) TYPE OF WORK COVE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BiTUM. SURF. TREATMEM H. PATHS, TRAILS & BiKEWAYS D. A.C. 1P.C.C. PAVEMENT 1. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) 141 8 YEAR ROAD ROADIPROJECT NAME AND LOCATION PROGRAM ROAD (Include brief termini description of MP's; Bridge #) ITEM ITEM LOG NO. NO. NO. 17 17 91030 DODSON RD (9 -NE TO SR 282) 91030 - MP 23.79 TO MP 29.71 ACP OVERLAY; FINISHED WIDTH = 34 FT. i8 18 93047 SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NEI 93047 - MP 3.10 TO MP 9.37 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH - 28 FT. 19 19 93045 B -NW RD (SR 28 TO WEST CANAL BRIDGE) 93045 - MP 0.00 TO MP 1.31 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH — 34 FT. 20 20 21700 BASELINE EAST RD (POTATO HILL To SR 17) 21740 21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.80 GRADE, DRAIN, SURFACE (BST): FINISHED WIDTH = 36 FT. 21 50 41890 AIRWAY DRIVE (FAIRGROUNDS TO SR 17) 41890 - MP 1.89 TO 3.21 GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER; FINISHED WIDTH = 50 FT. 22 23 92015 M -SE RD (SR 17 TO SR 282) 92015 -MP 0.00 TO MP 6.48 SURFACE (ACP): FINISHED WIDTH - 34 FT. 23 24 92015 BRIDGE #238, MCDONALD RD 92015 - MP 1.47 TO MP 1.88 BRIDGE REPLACEMENT: FINISHED WIDTH = 34 FT. 24 25 92015 BRIDGE #230, MCDONALD RD 92015 - MP 4.64 TO MP 4.65 BRIDGE REPLACEMENT; FINISHED WIDTH — 34 FT. 25 - - - MISCELLANEOUS PROJECTS - 'INCLUDES COST SHARE PROJECTS CRAB FORM NO. 3 (REV 11191) ANNUAL CONSTRUCTION PROGRAM FOR 1994 AGENCY ACTION DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) 65,233,000 Recommended Program June 7, 1993 (B) COMPUTED DAY LABOR LIMIT (see bae)d 6800,000 Data of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) 6797,000 Assessment Juno 15 , 1993 Date of Final Adoption Dec. , 1993 �r • • Line (C) must be smeller than Line (B) Resolution No. 93- -CC (5) (6) (7) (8) 1, (9) } 410) 1 (11) I (12) } f13) } (14) 1 (15) H 061, F C TYPE E AI SC URGES OF FUNDS £ S T I M A T E D E X P E N D I T U R E S (S1.000'sl PROJECT U LFN COUNTY OTHER UNDS CONSTRUCTION LENGTH N A WORK V FUNDS PRELIMINARY RIGHT GRAND C S I AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Miles) T S (See work R (61,000) (61,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 T 5.92 7 D E $850 CAPP $43 $807 $O $850 6.27 7 ABC E 67 670 RAP 677 60 60 677 (PE ONLY) 1.31 7 ABC E 62 620 RAP $22 60 60 622 (PE ONLY) 2.37 7 ABC E $3 617 STP 613 $O 60 613 WE ONLY) 1.32 16 ABDEF E 68 667 STP 631 60 60 631 68 TIA (PE ONLY) 6.48 7 D E 61 39 STP 610 60 60 510 WE ONLY) 0.20 7 1 E 41 68 STP 69 SO 60 69 (PE ONLY) 0.21 7 1 E 61 65 STP 66 60 60 66 (PE ONLY) --- --- ABC E $100 $O --- 60 $O $100 $100 'rogrem Totals - _ = e -> $735 $4.998 I 5441 SO $4.436 —._.___$797 65,674 Page 3 of 3