Loading...
HomeMy WebLinkAboutResolution 94-004-CCBEFORE THE BOARD OF COUNTY CONIMISSIONERS of RESOLUTION NO. . 94-4—CC GRANT County, Washington. In the matter of initiating county road projects and assigning CRP numbers. IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated. These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCFV 36.75.050, 36.80.030, 36.80.070) (Optional References). IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineer's estimates are hereby made in the amounts and for the purposes shown: (1) (2) (3) (4) (5) (66) (7) (8) (9) ROAD TYPE PORKF A Y COST ESTIMATE (THOUSANDS) Annual Const. ROAD NAME AND/OR BRIDGE NUMBER LOC' NO. Prog. (See Code) ENGIN. CONSTRUCTION Item No. CRP No M.P. TO M.P. R.O.W. FEDERAL LOCAL Marine View RID New C, D X 231,000 14 94-1 Monument Hill Bridge #332 93035 1.34 1.55 I X 2,000 15 94-� 'R' NW, Bridge #345 93025 0.67 0.88 I X 2,000 16 94 - Dodson Road 91030 23.7929.71 E X 17 94-� Baseline East Road 21700 0.00 1.77 21740 0.00 0.60 C, D X x 107000 3,000 20 94-_` P.F. ONLY Airway Drive 41690 1.89 3.21 C,E,F,G X 23,000 8,000 21 944 P.I. ONLY 'M' SE Road 92015 0.006.46 E X 9,000 1,000 22 94- P.I.. ONLY McDonald Rd. Bridge #238 92015 1.47 1.68 I X 8,000 1,000 23 94,4 P.F. ONLY McDonald Rd. Bridge#230 92015 4.64 4.85 I X 5,000 1,000 24 44- 944- P.F :. P.L. ONLY (4) TYPE OF WORK CODE A. PRELIMINARY ENGINEERING F. CURBS & GUTTERS B. RIGHT-OF-WAY G. SIDEWALKS C. GRADING, DRAINING,SURFACING H. TRAFFIC FACILITIES D. LIGHT BIT. SURF. TREATMENT 1. BRIDGE CONSTRUCTION E. A.C. OR P.C.C. PAVEMENT J. PATHS &TRAILS RCW 47.301 ADOPTED this 1L—day of'f ATTEST Clerk /the Boare Recommended for use in connection with WAC 136-18-030, For Multiple Project Initiation (5) The construction is to be accomplished by contract in accordance With RCW 36.77.020 et. seq. (6) The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18. BOARD OF COUNTY'COMMISSIONERS OF GPANT COUNTY, WASH.