HomeMy WebLinkAboutResolution 94-082-CCBOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
IN THE MATTER OF ADOPTING
A COMPREHENSIVE SIX YEAR
TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE ENSUING
SIX YEARS
WHEREAS, pursuant
Grant County did prepare a
Program for the ensuing six
WHEREAS, priority
was consulted by the Board
Program; and
RESOLUTION NO. 94 -82 -CC
to the requirements of RCW 36.81.121,
Comprehensive Transportation Improvement
year; and
array of projects was made available and
during the preparation of this Six Year
WHEREAS, the Engineer's report with respect to deficient
bridges was available to the Board during the preparation of the Six
Year Program; and
WHEREAS, an environmental pre -assessment of the Six Year
Program indicated that the social, economic and aesthetic values
would not be significantly affected; and
WHEREAS, pursuant further to said Law, the Board of County
Commissioners, being the legislative body of the County, did prepare,
revise and extend said Six Year Program and did hold a public hearing
on said Comprehensive Plan at 11:00 A.M. at the Courthouse, Ephrata,
Washington on the 28th day of June, 1994;
NOW, THEREFORE, BE IT RESOLVED by the Board of County
Commissioners of Grant County, Washington, that the Comprehensive Six
Year Road Program presented at the public hearing on the 28th day of
June, 1994, and revised as necessary, and attached hereto be hereby
adopted.
12
DONE THIS DAY OF
C2 -eATTEST: f°
Cjof the Board
G
T--.. Chairman
1
Commissioner
Commissioner
Constituting the Board of County Commissioners
of Grant County, Washington
Agency Grant County
County No. 13
City No.
MPO
F P.,:
U C R:. PROJECT IDENTIFICATION
N L .::: I.:
C A .;0::. A. PROJECT TITLE
T S ..R B. STREET/COUNTY ROAD NAME OR NUMBER
I S I C. TERMINAL BEGINNING AND END
O T.: D. DESCRIBE WORK TO BE DONE
N ;:Y:.
(. ,:.1. 2.-1 .. 3
08 .. 1. BROS-2013(043); Bridge 08352700
BRIDGE #122,19 -NW
34200 - MP 2.32 TO MP 2.64
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
07 2 BR -7137(006); Bridge 08259900
BRIDGE #130, R -NE
95037 - MP 18.87 TO MP 19.08
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
08 3 Bridge 08016400
BRIDGE #338 - MONUMENT HILL
93035 - MP 1.34 TO MP 1.55
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
08 .: 4 Bridge 08138800
BRIDGE #345, R -NW
93025 - MP 0.67 TO MP 0.88
BRIDGE REPLACEMENT; FINISHED WIDTH= 34 FT.
07 `5_ DODSON RD (1-90 TO 9 -NW)
91030 - MP 15.88 TO MP 23.79
ACP OVERLAY; FINISHED WIDTH = 34 FT.
07 ''''':Ei SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NE)
93047 - MP 2.55 TO MP 9.37
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
I
M S T L
PT T OE
R A TN
OP T AG
VE U LT
MS S H
T
:4,15 .::6.:
09 F 0.34
09 F 0.21
09 F 0.21
09 F 0.21
04 F 7.91
03 F 6.27
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date: June 28,1994
Adoption Date: June 28,1994
Resolution No.: 94- -CC
U PROJECT COSTS IN THOUSANDS OF DOLLARS
T C FUND SOURCE INFORMATION
10 FEDERAL FUNDING 1
L D
(LOCAL.AGENCY) .
:. ,: .. PROJECTS ONLY
RAP
IE
PROJECT
MONTH/
FEDERAL FEDERAL
CAPP
TS
PHASE
YEAR
FUND
COST
TIA
Y
FUNDS
PHASE
CODE
BY
UATA
STARTS
PHASE
OTHER
7
8
:9
10
11 .. :
12:
P
PE
EIS -
T
RAN
BR
I
RAP
67_
CONST
1/95
330
1 263j
67I
TOTAL
33011
3301 1
1 2631
P
PE
I I
T
RAN
BR
I I
RAP
CONST
1/95
N
1 1001
2
1221
TOTAL
1 1001
P
PE
12211:
1221 1 1
I I
T
RNV
I I
RAP
EIS
CONST
1/95
1 i
TOTAL
CE —
I
P
PE
1 I
T
RAN
4711
471 1 1
I I
RAP
CONST
1/95
EIS
TOTAL
I
P
PE
1/95
39
4
T
RNV
I I
CAPP
39141
CONST
7/95
431 1I
.��... �._ _
I
45
TOTAL
45 ,.
` 45
-_.
FJSf
P
PE
1/95
T
RNV
855
I
RAP
CONST
3/95
900!
1
900 ll
9001 I I
TOTAL
70
I
7711::<:<::::77
EXPENDITURE SCHEDULE FEDERALLY FUNDED
Page 1 of 12
(LOCAL.AGENCY) .
:. ,: .. PROJECTS ONLY
RAN REQ
STATE
LOCAL
4th
YIN
FUNDS
FUNDS
TOTAL
1st 2nd 3rd
thru ENVIR.
DATE
6th TYPE
MONTH/YR
13:
'14
" ' 15 II
.16 .: 17 :.18
19 20
21
EIS -
CE x
N
67_
-
--330 1.:...:
330
EA -
67I
I
33011
3301 1
NA
EIS
CE x
N
20
2
1221
122
EA_
201
21
12211:
1221 1 1
NA:
EIS
CE —
43
47 ..;;
47
EA -
431
_._ _4
41
4711
471 1 1
NA
1
EIS
CE
39
4
431
.' 43
EA_
39141
4311
431 1I
.��... �._ _
�._.. _. NA
45
45 ,.
` 45
-_.
FJSf
CE -
855
855 `
: "855
EA
900!
1
900 ll
9001 I I
I NA
70
7
7711::<:<::::77
I Els—
CE
489
54
�.54
[,--..:543:
F.J EA_
5591611
62011:'
'.6201 1 1
1 NA -
Page 1 of 12
Agency Grant County
County No. 13
City No.
MPO
F P.
U C R: PROJECT IDENTIFICATION
N L
C A 0 A. PROJECT TITLE
T S R B. STREET/COUNTY ROAD NAME OR NUMBER
I S ;.,I: C. TERMINAL BEGINNING AND END
0 T:. D. DESCRIBE WORK TO BE DONE
N Y.
1 2: >: 3.
07 7 B -NW RD (SR 28 TO WEST CANAL BRIDGE)
93045 - MP 0.00 TO MP 1.31
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
07 8. STP(R)-H133(001)
BASELINE EAST RD (POTATO HILL TO SR 17)
21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.60
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
07 " 9 STP(R)-M133(002)
M -SE RD (SR 17 TO SR 262)
92015 - MP 0.00 TO MP 6.46
--- SURFACE SURFACE (ACP); FINISHED WIDTH = 34 FT.
07 '10 STP(R)-M133(002); Bridge 08421800
BRIDGE #238, M -SE
92015 - MP 1.57 TO MP 1.58
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
07 ,._11: STP(R)-M133(002); Bridge 08224500
BRIDGE 9230, MCDONALD RD
92015 -MP 4.74 TO MP 4.75
FINISHED WIDTH = 34 FT.
BRIDGE REPLACEMENT:
08 '.12 BROS-2013( ); Bridge 08415500
BRIDGE #246, S -NE
43750 - MP 0.00 TO MP 0.25
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
I
M S
PT T
R A
OP T
VE U
MS S
T
4 5
03 F
03 F
04 F
09 F
09 F
Page 2 of 12
Six Year Transportation improvement Program
1995 to 2000
Hearing Date: June 28, 1994
Adoption Date: June 28, 1994
Resolution No.: 94- -CC
U
PROJECT COSTS IN THOUSANDS OF
DOLLARS
T L
TC
f
FUND SOURCE INFORMATION
_.----.:-. - ----;,----:.::
O E
10
FEDERAL FUNDING
EXPENDITURE SCHEDULE:':': FEDERALLY FUNDED
TN
LD
RAP
..:,-
:�iocAt ACE►+crl ' PROJECTS ONLY
AG
I E
PROJECT
MONTH/
FEDERAL
FEDERAL CAPP
RJW REQ
LT
TS
PHASE
YEAR
FUND
COST TIA
STATE LOCAL
4th Y/N
H
Y
PHASE
CODE
BY UATA
FUNDS FUNDS
TOTAL
1st
2nd 3rd thru ENVIR. DATE
STARTS
PHASE OTHER
6th TYPE MONTH/YR
6
.7
8
9 ::::.
10.;
:.11 .::.: 12 . ; :
13':_
21:
1.31
P
PE
1195
1
20 2
22
22,
I EIS _
T
RM
RAP
I :
cc_
CONST
4/95
1
185 18
2031:
'203
1 EA_
TOTAL
1
2051 20!
22511--
:-2251
1 1 1 NA_
2.37
P
PE
1195
1 17
32D
201
_
EtS
T
RIW
STP(R)
I
CE x N
CONST
5195
26842
310
::::261
EA_
TOTAL
1 2851
1 451
33011
3301
I I NA
6.46
P
PE
1195
1+ 431
7
501
50
EiS_--_
T
RNV
STP(R)
I
I.:
..::
CE x N
CONST
4/95
+I+
I 7601
119
8791
879
1 EA_
TOTAL
1 8031
1 1261
92911:::'
92.91
i i NA
0.01
P..__
PE
1/95
1 81
1
9 ;;(
:;:;; 9
EIS_
T
RNV
STP(R)
I 1
CE x N
CONST
4195
1 871
14
101 `
:' 101
EA_
TOTAL1
951
( 1 151
11011'`:1161
1 1 NA
0.01
P
PE
1/95
1 51
1
1
61.:;::.:6
as
T
RM/
STP(R)
I I
I
I
CE x N
CONST
4/95
1 561
1
8
641
-64.
EA_
TOTAL
1 611
1 1 91
70 1[
701
1 1 NA
0.25
P
PE
1195
1 101
1
i 2
121
121
ELS —
T
R/W
BR
I I
I
I:<:::.
Ij
CE x N
CONST
11/95
1 1501
1 1 30
1801:::::180
1
EA_
TOTAL
1 1601
1 1 321
19211.-:1921
I I I NA
Page 2 of 12
Agency
Grant County
County No.
13
City No.
Six Year Transportation Improvement Program
MPO
F
P
U C
R:
PROJECT IDENTIFICATION
N L
1.
C A
A. PROJECT TITLE
T S
R::
B. STREET/COUNTY ROAD NAME OR NUMBER
I S .:>:::j
C. TERMINAL BEGINNING AND END
0
T::
D. DESCRIBE WORK TO BE DONE
N
Y-
1
2
3
------------ ------ -- ---- ----- -- --- ---
09 .A3
13 NW RD (P -NW to ADAMS RD)
32740 - MP 0.00 TO 3.02
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
16 :,:::14 STP(U).6065(003)
AIRWAY DRIVE (FAIRGROUNDS TO SR 17)
41690 - MP 1.89 TO 3.21
GRADE, DRAIN, SURFACE (ACK C & G; FINISHED WIDTH = 48 FT.
07 -.15 PINTO RIDGE (31 -NE TO COULEE CITY)
95025 - MP 10.14 TO MP 14,74
WIDEN AND SURFACE (BST); FINISHED WIDTH = 28 FT.
:16 MISCELLANEOUS PROJECTS
*INCL. COST SHARE PROJECTS
08 17 P -NW RD (10.5 -NW TO MARTIN RD)
93035 - MP 0.57 TO MP 2.03
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
09 18 P -NW RD (MARTIN RD TO 13 -NW)
30350 MP 9.20 TO MP 10.28
GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 34 FT
Page3 of 12
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date: June 28,1994
Adoption Date: June 28, 1994
Resolution No.: 94- -cc
I
U
PROJ-CT
COSTS IN THOUSANDS OF DOLLARS
M
S
T L
T C
FUND SOURCE INFORMATION
PT
T
OE
10
FEDERAL FUNDING
EXPENDITURE SCHEDULE:::: FEDERALLY FUNDED
R Y
A
T N
L D
RAP
(LOCAL AGENCY) PROJECTS ONLY
0 P
T
A G
I E
PROJECT
MONTH/
FEDERAL FEDERAL CAPP
RNV REQ
V E
U
L T
T S
PHASE
YEAR
FUND COST TIA STATE LOCAL
4th Y/N
M S
S
H
Y
PHASE
CODE BY UATA FUNDS FUNDS
TOTAL
1st
2nd 3rd thru ENVIR. DATE
STARTS
PHASE OTHER
6th TYPE MONTH/YR
-4 -
5- -
:6
7:
8.:'::.
9 —
10---- - -11--- ---- 12 -- - -:13 14::
115:
16- --:-17.
181- —19 20
03
F
3.02
P
PE
11/95
101
101.:_-_._10
----- :'0
T
FUW
1
11
: .
Cc
CONST
4M
1101
11011
110
EA_
TOTAL
11201
12011:--.---120
1 1 NA
03
F
1.32
P
PE
11/95
72 11
83
63
as_
T
RIW
STP(U)
CE X N
CONST
4196
651 102
7
753
EA_
TOTAL
723 1 1131
83611
831:
.7531 NA_
04
P
4.60
P
PE
45
5
501-
50
es _
T
RM
RAP
CE
CONST
765
85
8501
850
EA_
TOTAL
8101 901
goo 11
NA---
03
F
P
PE
EIS_
T
RAN
CE
CONST
1195-12100
12001
1200
;600 EA—
TOTAL
120fl
1200l
[:-:-200
NA
03
P
1.46
P
PE
221
3
251
25
EIS —
T
R/W
RAP
CE_
CONST203
22
2251
--225
EA_
TOTAL
1 2251 251
250 11
1:
2501 1 NA
03
P
1.08
P
PEDS_
'0
'01
T
R/W
CE
CONST
1
170
1701
170
EA—
TOTAL
1 1 1801
180[::j
80 NA
I
Page3 of 12
Agency
Grant County
YEAR
FUND
COST
County No. 13
PHASE
CODE
City No.
RNV REQ
TIA
STARTS
LOCAL
MPO
7
.8: ;::::.
9.-.
':.: -:: .:10
F
P:.
I
DATE
OTHER
U C::
R:: PROJECT IDENTIFICATION
M
S
T L
N L
!
PT
T
0E
C A
O A. PROJECT TITLE
R Y
A
T N
T S
R B. STREET/COUNTY ROAD NAME OR NUMBER
0 P
T
A G
I S :'A
C. TERMINAL BEGINNING AND END
V E
U
L T
0
f.: D. DESCRIBE WORK TO BE DONE
M S
S
H
N
Y. ':
T
NA —
P
PE
--------
--
5 1 ---5-
EIS-
09
19 BRIDGE #336, MONUMENT HILL
09
P
0.02
CE -
30350 - M P 9.72
CONST
25
25 25
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
TOTAL
I
09
20 BRIDGE #337, P -NW
09
P
0.02
22
30350 - MP 10.26
RNV
EIS -
RAP
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
CONST
CE —
08
21: 3 -SE RD (SR 17 TO R -SE)
03
P
3.28
EA_
22000 - MP 0.00 TO MP 3.28
PE
3691_.
411
26
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
RNV
STP(R)
07 :.
22 7 -NW RD (SR 283 TO DODSON RD)
03
P
6.30
363
39200 - MP 2.01 TO MP 8.31
TOTAL
CE -
I
389
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
PE
7501 750
1
07
23, Q -NE IN FRONTAGE TO 3 -NE)
03
P
2.84
NA -
43590 - M P 0.00 TO M P 2.84
CONST
STP(RRP) 1
125
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
TOTAL
07
24 Q -NE RR SIGNALIZATiON
15
P
---
--
43590 - MP 1.02
43590
420 420
EA -
RAILROAD CROSSING SIGNALIZATION
61 1
45011 1 :' ::301:::4201
NA
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date: June 28,1994
Adoption Date: June 28,1994
Resolution No.: 94- -CC
U PROJECT COSTS IN THOUSANDS OF DOLLARS
T C FUND SOURCE INFORMATION
10 FEDERAL FUNDING EXPENPITURE SCHEDULE FEDERALLY FUNDED
LD
I E PROJECT MONTH/ FEDERAL FEDERAL
T S
PHASE
YEAR
FUND
COST
Y
PHASE
CODE
BY
RNV REQ
TIA
STARTS
LOCAL
PHASE
7
.8: ;::::.
9.-.
':.: -:: .:10
11.:.:
P
PE
DATE
OTHER
T
RM/
TYPE
MONTHNR
12 :
: '.13
CONST
; :i5::.. .:.16.:.: ::;17. 18. :19
20:::::.''::-::::21:
TOTAL
5
51 '..--'-5
EIS—
P
PE
1
T
RNV
65
651 1 ` -65
CONST
.. -1
7al
TOTAL
NA —
P
PE
--------
--
5 1 ---5-
EIS-
T
RM
CE -
CONST
25
25 25
EA —
TOTAL
I
301
P
PE
1
22
T
RNV
EIS -
RAP
CONST
CE —
TOTAL
38
I
EA_
P
PE
3691_.
411
26
T
RNV
STP(R)
40 40
CONST
1
363
TOTAL
CE -
I
389
P
PE
7501 750
1
4
T
RNV
791
79011 1 790 I I
NA -
CONST
STP(RRP) 1
125
EiS —
TOTAL
L _ 129
RAP
.. �tocALAGENCY) `.
PROJECTS ONLY
LAPP
RNV REQ
TIA
STATE
LOCAL
4th
YM
UATA
FUNDS
FUNDS
TOTAL 1st 2nd 3rd thru
ENVIR.
DATE
OTHER
6th
TYPE
MONTHNR
12 :
: '.13
14:. .
; :i5::.. .:.16.:.: ::;17. 18. :19
20:::::.''::-::::21:
5
51 '..--'-5
EIS—
CE-
65
651 1 ` -65
EA —
.. -1
7al
70 L ---_L -.161 . _. _��
NA —
5
--------
--
5 1 ---5-
EIS-
CE -
25
25 25
EA —
1
301
3011 I 301 l
NA
22
3
25 25
EIS -
RAP
CE —
347
38
385 , 385
EA_
3691_.
411
4101 1::::.::;:410)-- _-
NA
364
40 40
E4S—
RAP
CE -
675
75
7501 750
EA_
7111
791
79011 1 790 I I
NA -
430
EiS —
s'
CE -
E -57
57
420 420
EA -
1
61 1
45011 1 :' ::301:::4201
NA
1
5 --51::.:::
M—
CE —
125 125
EA-
_
11
130u
NA T
Page 4 of 12
Agency
PHASE
Grant County
County No.
13
City No.
PHASE CODE
BY
MPO
;_.
STARTS
F
7.:
8
U C ;:::R
.
PROJECT IDENTIFICATION
N L .:.
I
C A :
Cl .
A. PROJECT TITLE
T S '
R ,
B. STREET/COUNTY ROAD NAME OR NUMBER
I 5 :.':I
I
C. TERMINAL BEGINNING AND END
0 ::T::
-7751
D. DESCRIBE WORK TO BE DONE
N
Y
20 ...':..
1:::1.;.
2
1001
16 :
25
VALLEY RD (CASCADE VALLEY PARK TO OTTMAR)
12011 I .`
41250 - MP 0.50 TO MP 0.75
iOo1
1800
GRADE, DRAIN, SURFACE (ACP), CURB AND GUTTER, AND
NA
SIDEWALKBIKE PATH: FINISHED WIDTH = 48 FT.
08 '
.26.
22nd AVE
EA_
45170 -MP 1.28 TO MP 1.61
NA
GRADE, DRAIN, SURFACE (ACP); FINISHED WIDTH = 40 FT
08 ::27
RANDOLPH AND TYNDALL RDS
45010 -MP 1.13 TO MP 2.85; 45080 - MP 0.00 TO MP 0.70
GRADE, DRAIN, SURFACE (ACP); FINISHED WIDTH = 40 FT
09
28
1 -SW (SILICA RD. TO V -SW)
NEW - MP 0.00 TO MP 1.00
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT.
m07
29
ADAMS RD (1-90 TO SR 26) T
91017 -MP 0.00 TO MP 14.51
SURFACE (ACP); FINISHED WIDTH = 34 FT.
09 30 MATTAWA AREA ROADS
S -S WiU-SW25-SW28-S W29 -SW
GRADE, DRAIN, SURF.(GRAVBST); FINISHED WIDTH = 26 FT
I
M S T L
PT T OE
RY A TN
OP T AG
VE U LT
MS S H
T
4 5 6
02 P 0.25
04 P 0.33
04 P 2.42
01 P 1.00
04 P 14.51
01 P 8.00
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date: June 28, 1994
Adoption Date: June 28,1994
Resolution No.: 94 -CC
U I PROJECT COSTS IN THOUSANDS OF DOLLARS
T C i FUND SOURCE INFORMATION
10 I FEDERAL FUNDING
LD
I E PROJECT MONTH/ FEDERAL FEDERAL
T S
PHASE
YEAR FUND
COST
Y
X01
PHASE CODE
BY
20 :;::.
;_.
STARTS
PHASE
7.:
8
9 10
I 11 ... .
P
PE
50
T
R/W
EA_
7751
CONST
EIS
I
CE_
TOTAL
-7751
P
PE
20 ...':..
1
T RNV
CONST
TOTAL 1
P PE
T RAN
CONST
TOTAL I
P PE
T RNV
CONST 1
TOTAL 1
P _PE
T RNV
CONST
TOTAL
P PE
T RNV
CONST
TOTAL
RAP
CAPP
TIA
UATA
OTHER
12
TIA
STATE LOCAL
FUNDS FUNDS TOTAL
13: 14
8 2
1 136 34
1 1441 361
1 181 2
RAP
1 1081 121
1 1261 141
451 5
RAP
1 6981 77
1 7431 821
1 1 201
I 1 1001
1 I 1201
CAPP 1
1800
I 18001 I
1 300
I l 3001
i
EXPENDITURESCHEDULE
(Loc! L AGENCY}
1st 2nd 3rd
15 j 16 17 18
1011 10
4th
thru
6th
19
_1701
RNV REQ
170
18011 1
X01
1701 1
2011
20 :;::.
;_.
EIS
12011
cE _
120
EA_
14011 I -
201
1201
50
CE_
EA_
7751
EIS
775
CE_
82511 1-6-S0l
-7751
201
20 ...':..
CE
1001
EA_
100
12011 I .`
: 201:`:::
iOo1
1800
EA_
NA
180011 I
:. 9oo 1
`.agw
1
300 -,::>:: 60 >::::,.> ::60 : -180
3001160.1 :: 601 ; 180
FEDERALLY FUNDED
PROJECTS ONLY
Page 5 of 12
RNV REQ
Y/N
ENVIR.
DATE
TYPE
MONTHNR
20 ..
21 :.
EIS
cE _
EA_
NA
EIS
CE_
EA_
NA_
EIS
CE_
EA_
NA
EIS
CE
EA_
NA
EIS
CE_
EA_
NA
EIS_
CE _
EA_
NA
Page 5 of 12
Agency Grant County
County No. 13
City No.
MPO
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date: June 28, 1994
Adoption Date: June 28,1994
Resolution No.: 94- -CC
F
. P. ,
I
U
PROD 'CT COSTS IN THOUSANDS OF DOLLARS
U C
;'R : PROJECT IDENTIFICATION
M S
T L
T C
FUND SOURCE INFORMATION
N L
:.I
PT T
OE
10
FEDERAL FUNDING
C A
O A. PROJECT TITLE
R Y A
TN
LD
RAP
TS
R B. STREET/COUNTY ROAD NAME OR NUMBER
0 P T
AG
I E
PROJECT MONTH/ FEDERAL FEDERAL CAPP
I
EJCPENDITURE SCHEDULE:: FEDERALLY FUNDED
�OCAL ncEricrf ::: ;;::_ ' PROJECTS ONLY
RNV REQ
I S
I C. TERMINAL BEGINNING AND END
VEULT
TS
PHASE
YEAR
FUND
COST
TIA
STATE
LOCAL
4th
Y/N
0
T . D. DESCRIBE WORK TO BE DONE
MS
S
H
Y
PHASE
CODE
BY
UATA
FUNDS
FUNDS
TOTAL 1st
2nd 3rd
thru
ENVIR. DATE
N
Y::
T
STARTS
PHASE
OTHER
6th
TYPE MONTH/YR
1 .:.:.
2::::: ... 3'...: ..
4.i.
5..:::'6:..:.:.:7
8 -
9:::
10.
11 ..
.12
13
.14.
15 16 .
1
.::17:::: .::.18 :: ::::.19:;::.:::::20::::::::::::':::;:::211::
09
31 BRIDGE #251, 2.7 -SE
09
P
0.02
P
PE
2
1
31
3
Eis_
22010 - MP 0.20 TO MP 0.22
T
RNV
BR
-::==
CE—
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
CONST
48
11
591
=_591
EA_
TOTAL
f(
I
50
1 1
121
621 1
C' 62
uA
09
32: BRIDGE #126, O -NE
09
P
0.05
P
PE
2
1
31
3
Eis�
54150 - MP 4.20 TO MO 4.25
T
RNV
BR I
cr. _
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
CONST
1
43
1
10
531
53
EA_
—
TOTAL
1
45
11l
5611 1
661
NA
09
^
33 E -SE RD (12 -SE TO SR 262)
02
P
3.28
P
PE
I
( 36
4
40
4Q
EIS_
20790 MP 4.12 TO MP 7.40
T
RNV
RAP
CE_
GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 28 FT.
CONST
1
1 486
54
540
540
EA_
TOTAL
1
( 5221
581
58011
:
NA
08
34 U -SW RD (24 -SW TO SR 243)
02
P
3.02
P
PE
1
1 36
4
40140
EIS_
10590 -MP 1.01 TO MP 3.02; 10540 - MP 0.00 TO MP 1.01
T
R/W
RAP
I
I
CE_
GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 28 FT.
CONST
1 324
36
3601
360
EA_
TOTAL
1 3601
401
40011 1
f 4001
NA
09
35 BRIDGE 0347, S -NW
09
P
0.10
P
PE
3
1
41
4
Ess_
31550 - MP 1.40 TO MP 1.50
T
RNV
BR
CE_
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
CONST
52
1
12
641
64
1
EA_
TOTALx.
_ 55
l _.1
13L
_._. �1 1
1=-==:=:: .1
NA
09
. 36. BRIDGE #234,2 -SE
09
P
0.19
P
PE
3
1
4
4.
EIS_
21820 - MP 0.15 TO MP 0.34
T
RMBR
CE_
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
CONST
52
1
S2
64
64
EA_
TOTAL
55
1
131
6811 1
F : :,:::"68'1
NA
Page 6 of 12
Agency
Grant County
County No.
13
City No.
MPO
F
P: -
U C
PROJECT IDENTIFICATION
N L
C A
A. PROJECT TITLE
T S-
R
B. STREETICOUNTY ROAD NAME OR NUMBER
I S
A
C. TERMINAL BEGINNING AND END
0
T
D. DESCRIBE WORK TO BE DONE
N
Y
2
:3
08
7 -NE (M -NE TO N -NE)
Resolution No.: 94- -cc
I
42700 -MP 0.00 TO MP 1.03
U
GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 26 FT.
16
38
PATTON BLVD TRAFFIC SIGNAL
M
45170 - MP 0.53
T L
TC
TRAFFIC/PEDESTRIAN SIGNAL
19 :�::.319 PATTON BLVD BIKE PATH (SR 17 TO AIRWAY)
BIKE PATH
09 .40 1 -SE (U -SE TO TIFLIS)
23400 - MP 0.00 TO MP 0.75
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
09 2 -SE (Q -SE TO R -SE)
92045 - MP 6.94 TO MP 7.95
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
08 :42 MCCONIHE RD (SR 17 TO F -NE)
46200 - MP 0.00 TO MP 0.81
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
Page7 of 12
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date: June 28,1994
Adoption Date: June 28,1994
Resolution No.: 94- -cc
I
U
PROD =CT COSTS IN THOUSANDS OF DOLLARS
M
S
T L
TC
FUND SOURCE INFORMATION
P T
T
0 E
10
FEDERAL FUNDING I
t.XP.lEkb*1Ty.RE SCHEDULE,:.,: FEDERALLY FUNDED
R Y
A
T N
L D
RAP
(LOCAL AGENCY) PROJECTS ONLY
0 P
T
A G
I E
PROJECT
MONTH/ FEDERAL FEDERAL CAPP
RM REQ
V E
U
L T
T S
PHASE
YEAR FUND COST TIA STATE LOCAL
4th YM
M S
S
H
Y
PHASE CODE BY UATA FUNDS FUNDS
TOTAL
1st 2nd 3rd thru ENVIR. DATE
T
STARTS PHASE OTHER
6th TYPE MONTHNR
4:
5
6
7
8
::9. 10 .11 12 13:
14*
15. 1
:16:: :::::17., ::18 -19 1 X 21..
04
P
1.03
P
PE
12
1
131
13 Els_
T
RM
I I RAP
CE—
CONST
1 108
12..
-.120]
EA_
TOTAL
1 1201
131
13311
1 1 Ml 1 NA
12
P
0.10
P
PE
1 1 6
2
81
8
Eis_
T
RM
UATA
CE—
CONST
1 54
181
721
72
i
EA_
TOTAL
601
201
8011
i 1::: 801 i
NA
05P
0.30
P
PE
I
1
21
21
2
as—
T
1—
13
3]
13
1 3
EA_
TOTAL
I
I 1
151
1511
1 17 .151 1
NA
03
P
0.75
P
PE
I 1
1111
1Els—
1i
Els—
T
T
RAN
1
I
CE—
CONST
1 1
104
041
104 1
104
1 EA_
TOTAL
1 1
1151
11511
i 1 1151 1 NA_
03
P
1.01
P
PE
1
15151
- 15
1 EIS_
T
RNV
RNVCE
I
135
1 351
1351
1 EA_
TOTAL
I 1
1501
15011
1 1-:-1501 I Na
03
P
0.81
P
PE
1 16
2
181
1t3
Els—
T
RIW
RAP
---
CE -
CONST
141
16
571
1571
EA
TOTAL
1 1571
181
17511
1 `:1751 NA
Page7 of 12
Agency
BY
Grant County
County No.
13
City No.
STARTS
PHASE
MPO
6th
F
P
ll'' -j....
U C
R.:
PROJECT IDENTIFICATION
N L
C A
O:
A. A. PROJECT TITLE
T S
R:
B. STREET/COUNTY ROAD NAME OR NUMBER
I S
C. TERMINAL BEGINNING AND END
0
T.
D. DESCRIBE WORK TO BE DONE
N
1 450 50
5WI SOD
1':'1::;2:::'.;;;
3
07
1 4771 531
SAGEBRUSH FLATS RD (J -NE TO 24 -NW)
NA
93047 - MP 9.37 TO 11.60; 93048 - MP 5.28 TO MP 6.62
RAP
1 36 4
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
07
44
10 -NE (STRATFORD TO SIR 17)
1 594 656
94040 - MP 0.00 TO MP 6.53
EA_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
09 ::45: BRIDGE #219,WSE
24650 - MP 0.00 TO MP 0.20
BRIDGE REPLACEMENT; FINISHED WIDTH 28 FT.
09 46: BRIDGE #241, M -NE
94030 - MP 5.83 TO MP 6.05
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
07 .::AT 5-NW/U-NW RDS (SR 281 TO SIR 28)
93010 - M P 14.07 TO 22.98
GRADE, DRAIN, SURFACE (8ST); FINISHED WIDTH = 34 FT.
07 ::::.48: BRIDGE #389,5 -NW
qW10-MP
16,02 TO MP MP 16,23
BRIDGE REPLACEMENT; FINISHED WIDTH 34 FT.
I
M S T L
PT T OE
R Y A TN
OP T AG
VE U LT
MS S H
T
4 15 ::.:6::
03 P 3.57
U I
TC
10
LD
IE
TS
Y
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date: June 28,1994
Adoption Date: June 28,1994
Resolution No.: 94- -cc
PROJECT COSTS IN THOUSANDS OF DOLLARS
FUND SOURCE INFORMATION
FEDERAL FUNDING EXPENDITURE SCHEDULE..:: FEDERALLY FUNDED
RAPPROJECTS ONLY
(LOCALAGENCY) ,::,�:...�,
PROJECT MONTH/ FEDERAL FEDERAL CAPP
RNV REQ
PHASE YEAR FUND COST TIA STATE LOCAL 4th YfN
7: 8
P PE
T RAN
CONST
04 P 6.53 P
T
09 P 0.20 P
T
09 P 0.22 P
T
03 P 8.91 P
T
09 P 0.21 P
T
PE
R/W
CONST
TOTAL
PE
RM
CONST
TOTAL
PE
R/W
CONST
TOTAL
PE
R/W
CONS
TOTAL
PE
RNV
CONST
TOTAL
PHASE CODE
T1
BY
UATA
FUNDS FUNDS
TOTAL 1st 2nd 3rd thru
ENVIR. DATE
STARTS
PHASE
OTHER
6th
TYPE MONTHNR
-:10
ll'' -j....
':z 13- -14--i:
19.:--�
20-
27 3
301 30
ES
RAP
CE -
1 450 50
5WI SOD
EA_
1 4771 531
53011 1 (_....5301 1
NA
RAP
1 36 4
40 40
EZ -
CE
1 594 656
660 .66 1 01
EA_
630 70
70011 1 1::,: ::.700I
NA-
10
1
2
1211
::4- F
RS
B R
CE -
1 307
1
47
35411
---.354
EA
317
1 1 491
W6 11 1 1:�: -I: :. -
12 3541
NA
10
21
12
11 - 2
us—
BR
CE
1251
1
321
1571
157
EA
1 1351
1 1 341
.16911
NA
67
8
751
EIS
RAP
CE—
945
105
JOWI
-1050
-
1 1
10121 1131
112511 1 1 1 ;1125
NA
1 51
1
1
61
ms—
BR
CE -
1 601
1
15
751
75
EA
1 651
1 1 161
8111 1 1 1, 81
NA
Page 8 of 12
Page 9 of 12
Six Year Transportation Improvement
Program
Agency
Grant County
1995
to 2000
County No.
13
Hearing Date: June 28,1994
City No.
Adoption Date: June 28, 1994
MPO
Resolution No.: 94 -CC
F
P::
I
U
PROJECT COSTS IN THOUSANDS OF
DOLLARS
U C
. R
PROJECT IDENTIFICATION
M
S
T L
T C
FUND SOURCE INFORMATION
N L.
I:..
PT
T
OE
10
FEDERAL FUNDING I
EXPENDITURE SCHEDULE,
FEDERALLY FUNDED
C A ::;0
A. PROJECT TITLE
R Y
A
T N
L D
RAP
`.:(iocuACEhicvt ;;
PROJECTS ONLY
T S .::R
.
B. STREET/COUNTY ROAD NAME OR NUMBER
OPT
A G
I E
PROJECT
MONTH/ FEDERAL FEDERAL CAPP
::..:
-- ;;:.-..
RNV REQ
I S .
I :
C. TERMINAL BEGINNING AND END
VE
U
LT
T S
PHASE
YEAR FUND COST TIA
STATE LOCAL
4th
Y/N
O
T
D. DESCRIBE WORK TO BE DONE
M S
S
H
Y
PHASE CODE BY UATA
FUNDS FUNDS
TOTAL
1st 2nd 3rd thru
ENVIR. DATE
N
Y--:
TSTARTS
PHASE OTHER
6th
TYPE MONTHNR
-4--.5
--;:;:6::.'
7_
:,::.-..8..---,::-;:.-:.9::
12 :.;
;:.f3... ,::
-.f4
15:;::.- :-;;t6;`::
': 17:,:: :.:::18 19:
20<;:,:. 21.
08
49
K -NW RD (SR 283 TO N FRONTAGE RD)
04
P
4.55
P
PE
31
4
35
_._s-35
Eis_
38550 - MP 0.00 TO MP 4.55
T
RM
RAP
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
CONST
284
31
315
315
EA_
TOTAL
3151
351
35011
1 1 1-:.-::;350
NA
08
50
K-SE/1-SE RDS (BASELINE -E TO SR 17)
03
P
2.55
P
PE
27
3
30
30
as_
21750 - MP 0.00 TO MP 0.4521780 - MP 0.00 TO MP 2.10
T
RNV
RAP
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
CONST
243
27
270
_ - ;270
EA_
TOTAL
1 2701
301
30011
1 1 1'- : 300
NA
16 ::;
51
VALLEY RD (OTTMAR TO COLE)
02
P
0.78
P
PE
1 45
5
501
501
Eisv
41250 - MP 0.70 TO MP 1.53
T
RMI
UATA
GRADE, DRAIN, SURFACE(ACP), AND CURB AND GUTTER;......
CONST
405
45
IIcE_
450,
4501
EA_
FINISHED WIDTH = 48 FT.
TOTAL
4501
501
50011
1 5001
NA
08 '::
52
BRIDGE #385, K -NW
09
P
0.23
P
PE
1
22
2
24
241
Eos_
93041 - MP 0.07 TO MP 0.30
T
RNV
RAP
CE_
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
CONST
19422
216
2l6
EA_
TOTAL
I 1
I_2161 _
241
2d01�
�Y
I 240 I
NA
08 -
53
MAE VALLEY RD (HIAWATHA TO WESTSHORE)
03
P
4.97
P
PE
64
7
71 I
<-:. -71:
EIS_
40560 - MP 0.00 TO MP 4.97
T
RNV
RAP
�'
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT
CONST
I
573
64
63711
637
EA_
TOTAL
1
li
1 6371
711
70811
1 1 1.::>:7081
NA
09
54
F -NE (N FRONTAGE TO MAE VALLEY)
01
P
0.95
P
PE
1
13
131
13
Ets_
NEW - MP 0.00 TO 0.95
T
RMI
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT.
CONST
117
117
117
EA_
_
TOTAL
1
1 1
1301
13011
1 1 1: `.:) 30
NA
Page 9 of 12
Agency
Grant County
Six Year Transportation Improvement Program
County No. 13
City No.
1995 to 2000
MPO
Hearing Date:
F
P.'
U C
R PROJECT IDENTIFICATION
M S
T L
N L
I.
PT T
OE
C A
:0::, A. PROJECT TITLE
R Y A
T N
T S .R
B. STREET/COUNTY ROAD NAME OR NUMBER
O P T
A G
I S
I C. TERMINAL BEGINNING AND END
V E U
L T
O
T D. DESCRIBE WORK TO BE DONE
M S S
H
N
Y
T
EXPENDITURE SCHEDULE::>
FEDERALLY FUNDED
4:.: 511lrwr6
09
55 BLACK SANDS AREA ROADS
01 P
2.00
PROJECTS ONLY
NEW
PROJECT
MONTH/ FEDERAL FEDERAL CAPP
GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 26 FT
RNV REQ
07
56. W -NE (3 -NE TO 12 -NE)
04 P
9.06
95035 - MP 0.00 TO MP 9.06
YM
Y
SURFACE (BST); FINISHED WIDTH = 24 FT.
FUNDS FUNDS
TOTAL
08
57 31 -NE (PINTO RIDGE TO R -NE)
04 P
3.99
STARTS PHASE OTHER
51600 -MP 0.00 TO MP 7.99
6th
TYPE MONTHNR
SURFACE (BST); FINISHED WIDTH = 28 FT.
:, :....8.....:.
9..:.:::::::::.10 ..... ........1.1.:...::...:...12 ;:.
08
58 6 -SE (M -SE TO J -SE)
04 P
2.01
P
20100-MPQ.00 TO MP 3.01
16
161
3R (BST); FINISHED WIDTH = 28 FT.
ELS_
T
08 59. 20 -NE RD (E -NE TO STRATFORD) 04 P 4.82
94046 - MP 4.44 TO MP 9.26
SURFACE (BST); FINISHED WIDTH = 28 FT.
08 60 P -NW RD (5 -NW TP SR 28) 04 P 5.03
36250 - MP 0.00 TO MP 5.03
SURFACE (BST); FINIDHED WIDTH = 34 FT.
Page 10 of 12
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date:
June 28, 1994
Adoption Date:
June 28,1994
Resolution No.:
94- -CC
U
PROJECT COSTS IN THOUSANDS OF DOLLARS
TC
FUND SOURCE INFORMATION
10
FEDERAL FUNDING I
EXPENDITURE SCHEDULE::>
FEDERALLY FUNDED
L D
RAPrACErcrl.....
::! :'
PROJECTS ONLY
I E
PROJECT
MONTH/ FEDERAL FEDERAL CAPP
RNV REQ
T S
PHASE
YEAR FUND COST TIA
STATE LOCAL
4th
YM
Y
PHASE CODE BY UATA
FUNDS FUNDS
TOTAL
1st 2nd 3rd thru
ENVIR. DATE
STARTS PHASE OTHER
6th
TYPE MONTHNR
7 .
:, :....8.....:.
9..:.:::::::::.10 ..... ........1.1.:...::...:...12 ;:.
;::..13 ........14 :..:.
..15..
16 ......17... ....18...::..::19::::..:::
;20 ..::: >.::::21
P
PE
16
161
16
ELS_
T
RNVCE_
CONST
144
1441
.. 144
EA_
TOTAL
1 1
V y -]'---l--60- r
160ll
i
1 { :160
NA
P
PE
1 1
50
8
581
58
EIS_
T
RNV
RAP
`'
CE_
CONST
1 1
891
99
9901
990
EA_
TOTAL
1
9411 1071
1048 l
I I I :1048
NA_
P
PE
1 1
31
4351
35
EIS_
T
RlW
I RAP
CE
CONST
1
284
31
3151__._:315
EA_
TOTAL
1 I
3151 351
35011
1
Na
P
PE
1
22 31
25
1 25
EIS_
T
RNV
RAP
cE_
CONST
1 1
202 23
225
225
EA_
TOTAL
2241 261
25011
1 1 1 :250
NA
P
PE
1
36
440
ao
EIS
T
RNV
1 RAP
' :': _
CE _
CONST
1
369
41
4101
410
EA
TOTAL
1
4051 451
45011
1 i 1 ;` .450.
NA
P
PE
40
5
45
; ;45
EIS_
T
RNV
1 RAP
CE_
CONST
1
364
41
405
405
EA
TOTAL
--
4041 461
45011
1 1 1 : d5 *1
Na
Page 10 of 12
Agency
RMI REQ
Grant County
County No.
13
City No.
TYPE
MONTHNR
MPO
21 1
EIS
F
P
U C
R::
PROJECT IDENTIFICATION
N L
Us
C A
O:
A. PROJECT TITLE
T S .
F2
B. STREET/COUNTY ROAD NAME OR NUMBER
I S
I
C. TERMINAL BEGINNING AND END
0
T
D. DESCRIBE WORK TO BE DONE
N
Y::
VS
CE
::3 .:..
09 :..
61
K -NW RD (SR 28 TO SR 283)
EIS
30410 - MP 0.00 TO MP 5.46
CE _
GRADE. DRAIN, SURFACE(6ST); FINISHED WIDTH = 28 FT.
19 :. 62. MAPLE DR (STRATFORD TO GRAPE)
42600 - MP 0.00 TO MP 0.75
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 40 FT.
19 63 GRAPE DR (SR 17 TO END)
42350 - MP 0.00 TO MP 0.71
GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 40 FT,
09 64 5 -NE (WESTSHORE DR TO F -NE)
NEW
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT.
07 65; O -NW RD (MOUNTAIN VIEW DR TO MARTIN RD)
32850 - MP 0.57 TO MP 1.92
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
07 66 DODSON RD (FRENCHMAN HILLS TO SR 26)
91030 - MP 0.00 TO MP 5.90
ACP OVERLAY; FINISHED WIDTH = 34 FT.
I
M S T L
PT T OE
R A TN
OP T AG
VE U LT
MS S H
T
4' 5: 6
03 P 5.46
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date: June 28,1994
Adoption Date: June 28,1994
Resolution No.: 94- -CC
U PROJECT COSTS IN THOUSANDS OF DOLLARS
T C FUND SOURCE INFORMATION
10 FEDERAL FUNDING
L D RAP
I E PROJECT MONTH/ FEDERAL FEDERAL CAPP
T S PHASE YEAR FUND COST TIA STATE LOCAL
Y PHASE CODE BY UATA FUNDS FUNDS TOTAL
STARTS PHASE OTHER
.7 ...::.8.: 9. :10.:: 1 :. 11 12. 13 : '` '14` ::15
P
T
03 P 0.75 P
T
03 P 0.71 P
T
01 P 0.40 P
T
03 P 1.35 P
T
04 P 5.90 P
T
PE
RAN
CONST
TOTAL
PE
RNV
CONST
TOTAL
PE
RAN
CONST
TOTAL
PE
RMI
CONST
TOTAL
PE
RAN
CONST
TOTAL
PE
RAN
CONST
TOTAL
STP(R)
I
15
1 132
147
65 65
FEDERALLY FUNDED
PROJECTS ONLY
Page 11 of 12
RMI REQ
YM
ENVIR.
DATE
TYPE
MONTHNR
20
21 1
EIS
CE
EA _
NA
Us
CE _
EA
NA
EIS
CE
EA_
NA
VS
CE
EA_
NA
EIS
CE _
EA _
NA
EIS
CE�
EA_
NA
Page 11 of 12
Agency Grant County
County No. 13
City No.
MPO
F
U C :R: PROJECT IDENTIFICATION
NL::
C A O. A. PROJECT TITLE
T S R B. STREETICOUNTY ROAD NAME OR NUMBER
I S I C. TERMINAL BEGINNING AND END
0 T D. DESCRIBE WORK TO BE DONE
N ':::Y
.1 2:
07 :67 DODSON RD (1-90 TO FRENCHMAN HILLS)
91030 - MP 5.90 TO MP 15.42
ACP OVERLAY; FINISHED WIDTH = 34 FT.
07 68. U -SE (1-90 TO EVAN HALL ST)
92035 - MP 4.82 TO MP 12.59
ACP OVERLAY; FINISHED WIDTH= 34 FT.
I
M S
PT T
R Y A
OP T
VE U
MS S
T
4. 5
03 P
TL
OE
TN
AG
LT
H
0
Six Year Transportation Improvement Program
1995 to 2000
Hearing Date: June 28, 1994
Adoption Date: June 28,1994
Resolution No.: 94- -cc
U PROD :-CT COSTS IN THOUSANDS OF DOLLARS
T C FUND SOURCE INFORMATION
10 FEDERAL FUNDING EXPENDITURE SCHEDULE
LD
(LOM AQENCY)
IE PROJECT
MONTH/
FEDERAL FEDERAL
T S PHASE
YEAR
FUND COST
Y
PHASE
CODE BY
OTHER
STARTS
PHASE
6- 7. 8. 9 10:1-
9.52 P PE 87
T RNV STP(R)
CONST 1730
TOTAL 1817
04 P 7.91 P PE
T RNV
CONST
TOTAL
RAP
(LOM AQENCY)
CAPP
TIA
STATE LOCAL
4th
UATA
FUNDS FUNDS
TOTAL 1st 2nd 3rd thru
OTHER
6th
12,:
13. A 4
15....l .16. :17 18 19
13
1001
--- 100
2702
2000
F2831 F
21-001 1 t t 2100
1 40
40"
40
CAPP
1 760
76011
760
8001
80011 Wo
FEDERALLY FUNDED
PROJECTS ONLY
RM REQ
Y/N
ENVIR. DATE
TYPE MONTHNR
. 20 21
US
CE_
EA
NA
EIS—
CE—
EA
NA
Page 12 of 12