HomeMy WebLinkAboutResolution 94-142-CCBOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
IN THE MATTER OF
ADOPTING THE 1995
ANNUAL ROAD PROGRAM
RESOLUTION NO. 94 -142 -CC
WHEREAS, pursuant to the requirements of R.C.W. 36.40.070, Grant County
did prepare a 1995 Annual Road Construction Program, and a Comprehensive Road Program
for the ensuing six years of 1995 - 2000, and
WHEREAS, in accordance with W.A.C. 136.16 an environmental assessment
was made on all work within the Annual Program, and
WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public
hearing was held and included the 1995 Annual Road Program, and
WHEREAS, all comments and/or objections were heard and evaluated,
NOW, THEREFORE, BE IT RESOLVED by the Board of County
Commissioners of Grant County, Washington that the 1995 Annual Road Construction
Program attached hereto is hereby adopted.
DONE THIS DAY % - 19-? Zi
rf
ATTEST; \11Z�V—Au AJ
"YV
Chairman
Clerk of the Board ^ )
Commissioner
�_..
Commissioner
Constituting the Board of County Commissioners
of Grant County, Washington
V.
CRAB FORM NO. 3 (REV 11/91)
ANNUAL CONSTRUCTION PROGRAM FOR 1995
(7) TYPE OF WORK CODE
A. GRADING AND
DRAINING F. SIDEWALKS
B. BASE AND TOP COURSE G. TRAFFIC FACILITIES
C. BITUM. SURF.
TREATMENT H. PATHS, TRAILS & BIKEWAYS
D. A.C. /P.C.C. PAVEMENT
1. BRIDGES
E. CURBS AND GUTTERS
J. FERRY FACILIIIES
(1)
(2)
(3)
(4)
6 YEAR
Date of Submittal of
ROAD
$5,138,000
ROAD/PROJECT NAME AND LOCATION
PROGRAM
ROAD
(Include brief termini description of MPs; Bridge #)
ITEM
ITEM
LOG
NO.
NO.
NO.
1
1
34200
BRIDGE #122, 19 -NW
June 15 , 1994
34200 - MP 2.32 TO MP 2.64
Date of Final Adoption
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
2
2
95037
BRIDGE #130, R -NE
Resolution No.
94- -CC
95037 - MP 18.87 TO MP 19.08
(10)_ 1
f111
(12)
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
3
3
93035
BRIDGE #338 - MONUMENT HILL
B A T E D
X P E N D f T Lf R E S
($1,000's)
93035 - MP 1.34 TO MP 1.55
OTHER FUNDS
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
4
4
93025
BRIDGE #345, R -NW
PRELIMINARY
RIGHT
93025 - MP 0.67 TO MP 0.88
C S I E
AMOUNT
PROGRAM
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
5
5
91030
DODSON RD (1-90 TO 9 -NE)
($1,000)
SOURCE
595.10
91030 - MP 15.88 TO MP 23.79
CONTRACT DAY LABOR
595.00
count N S
ACP OVERLAY; FINISHED WIDTH = 34 FT.
6
53
40560
MAE VALLEY RD (WESTSHORE DR TO E -NE)
0.34 8 1 E
$163
93047 - MP 0.00 TO MP 1.93
$265 $13
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
7
7
93045
B -NW RD (SR 28 TO WEST CANAL BRIDGE)
93045 - MP 0.00 TO MP 1.31
$85
BR
$0
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
8
8
21700
BASELINE EAST RD (POTATO HILL TO SR 17)
RAP
21740
21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.60
021 8 1 E $30
$45
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 36 FT.
9
9
92015
M -SE RD (SR 17 TO SR 262)
0.21 8 1 E $28
$41
RAP
92015 -MP 0.00 TO MP 6.46
$69 $0
$69
SURFACE (ACP); FINISHED WIDTH = 34 FT.
CRAB FORM NO. 3 (REV 11/91)
ANNUAL CONSTRUCTION PROGRAM FOR 1995
1.93 8 ABC E
1.31 7 ABC E
2.37 7 ABC E
6.46 7 D E
$27 $249 RAP
$14
$20
$205
RAP
$11
$45
AGENCYACnON
DAY LABOR COMPUTA77ON
$17
$126
$803
STP(R)
COUNTY.
GRANT
Date of Submittal of
(A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15)
$5,138,000
Recommended Program
June 7,19M
(B) COMPUTED DAY LABOR LIMIT (see back) -
$800,000
Date of Environmental
(C) TOTAL DAY LABOR PROGRAM -column (15)
$731,000
Assessment
June 15 , 1994
Date of Final Adoption
Dec. , 1994
11 - Line (C) must be smaller than Line (B) -
Resolution No.
94- -CC
(51 (61 (7) (8) 1.9.11
(10)_ 1
f111
(12)
1 (13)
(14) ( (15)
( (16)
F C TYPE E A SO JRCES OF FUNDS
E S T I
B A T E D
X P E N D f T Lf R E S
($1,000's)
PROJECT U L OF N S COUNTY
OTHER FUNDS
CONSTRUCTION
LENGTH N A WORK V S FUNDS
PRELIMINARY
RIGHT
GRAND
C S I E
AMOUNT
PROGRAM
ENGINEERING
OF WAY
TOTAL
(Mises) T S (see wo(k R S ($1.000)
($1,000)
SOURCE
595.10
595.20
CONTRACT DAY LABOR
595.00
count N S
0.34 8 1 E
$163
BROS
$265 $13
$278
$115
RAP
0.21 7 1 E $2
$85
BR
$0
$104 $0
$104
$17
RAP
021 8 1 E $30
$45
RAP
$0
$75 $0
$75
0.21 8 1 E $28
$41
RAP
$0
$69 $0
$69
7.91 7 D E $355
$740
CAPP
$48
$1,047 $0
$1,095
1.93 8 ABC E
1.31 7 ABC E
2.37 7 ABC E
6.46 7 D E
$27 $249 RAP
$14
$20
$205
RAP
$11
$45
$285
STP(R)
$17
$126
$803
STP(R)
$50
$218 $44 $276
$178 $36 $225
$260 $53
$879 $0
$330
$929
Rona 1 M'2
CRAB FORM NO 3 (REV 11191)
ANNUAL CONSTRUCTION PROGRAM FOR 1995
(7) TYPE OF WORK CODE
A. GRADING AND DRAINING
F. SIDEWALKS
B. BASE AND TOP COURSE G. TRAFFIC FACILITIES
C. BITUM. SURF. TREATMENT H. PATHS. TRAILS & BIKEWAYS
D. A.C.1P.C.C. PAVEMENT
1. BRIDGES
E- CURBS AND GUTTERS
J. FERRY FACILITIES
(1)
(2) (3)
(4)
6 YEAR
Date of Submittal of
ROAD
ROADIPROJECT NAME AND LOCATION
(A) TOTAL CONSTRUCTION PROGRAM -column (14) r (15)
PROGRAM ROAD
(include brief termini description of MF"s; Bridge #)
ITEM
ITEM LOG
NO.
NO. NO.
10
10 92015
BRIDGE #238, MCDONALD RD
Date of Environmental
92015 - MP 1.47 TO MP 1.68
(C) TOTAL DAY LABOR PROGRAM - column (15)
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
11
11 92015
BRIDGE #230, MCDONALD RD
June 15 , 1994
92015 -MP 4.64 TO MP 4.85
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
12
36 20200
BRIDGE #234,2 -SE RD
Dec. , 1994
U " Line (C) must be smaller than Line (B) "
20200 - MP .50 TO MP 0.61
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
13
12 43750
BRIDGE #246, S -NE
(5) (6) (7) (8) (9)(10)
43750 - MP 0.00 TO MP 0.25
(12) j
(13)
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
14
13 32740
13 -NW (P -NW TO ADAMS RD)
OF FUNDS
E S T I M A T E D
32740 - MP 0.00 TO MP 3.02
E S
($1,000's)
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT
15
14 41690
AIRWAY DRIVE (FAIRGROUNDS TO SR 17)
CONSTRUCTION
41690 -MP 1.89 TO 3.21
LENGTH N A WORK V S FUNDS
GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER;
PRELIMINARY
RIGHT
FINISHED WIDTH = 50 FT.
16
6 93047
SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NW)
AMOUNT
PROGRAM
93047 - MP 3.10 TO MP 9.37
OF WAY
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
17
43 93047
SAGEBRUSH FLATS RD (J -NW TO 24 -NW)
SOURCE
93048
93047 - MP 9.37 TO MP 11.60; 93048 - MP 5.28 TO MP 6.62
CONTRACT DAY LABOR
595.00
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
CRAB FORM NO 3 (REV 11191)
ANNUAL CONSTRUCTION PROGRAM FOR 1995
6.27 7 ABC E $7 $70 RAP $77 $0 $0 $77
(PE ONLY)
3.57 7 ABC E $3 $27 RAP $30 $0 $0 $30
(PE ONLY)
P-3oe 2 of 3
AGENCY ACTION
DAY LABOR COMPUTATION
COUNTY'
GRANT
Date of Submittal of
(A) TOTAL CONSTRUCTION PROGRAM -column (14) r (15)
$5,138,000
Recommended Program
June 7 . 1994
(B) COMPUTED DAY LABOR LIMIT (see back)
$800,000
Date of Environmental
(C) TOTAL DAY LABOR PROGRAM - column (15)
$731,000
Assessment
June 15 , 1994
Date of Final Adoption
Dec. , 1994
U " Line (C) must be smaller than Line (B) "
Resolution No.
94- -CC
(5) (6) (7) (8) (9)(10)
(11)
(12) j
(13)
(14) j (15)
I (16)
F C TYPE E-A SO JRCES
OF FUNDS
E S T I M A T E D
= X P E N D I T U R
E S
($1,000's)
PROJECT U L OF N S COUNTY
OTHERFUNDS
CONSTRUCTION
LENGTH N A WORK V S FUNDS
PRELIMINARY
RIGHT
GRAND
C S I E
AMOUNT
PROGRAM
ENGINEERING
OF WAY
TOTAL
(►.rues) T S (see work R S ($1,000)
($1,000)
SOURCE
695.10
595.20
CONTRACT DAY LABOR
595.00
axles) N S
020 7 1 E $15
$95
STP(R)
$9
$101
$0
$110
0.21 7 1 E $9
$61
STP(R)
$6
$64
$Q
$70
0.11 9 1 E $17
$68
BROS
$5
$67
$13
$85
025 9 1 E $32
$160
BR
$12
$180
$0
$192
3.02 9 ABC E $90
$30
COST SHARE
$0
$0
$120
$120
1.32 16 ABDEF E
$818
STP(U)
$46
$900
$0
$946
$128
TIA
6.27 7 ABC E $7 $70 RAP $77 $0 $0 $77
(PE ONLY)
3.57 7 ABC E $3 $27 RAP $30 $0 $0 $30
(PE ONLY)
P-3oe 2 of 3
(7) TYPE OF WORK CODE
A. GRADING AND DRAINING F. SIDEWALKS
B. BASE AND TOP COURSE G. TRAFFIC FACILITIES
C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS
D. A.C. tP.C.C. PAVEMENT
I. BRIDGES
E. CURBS AND GUTTERS
J. FERRY FACILITIES
(1) (2) (3)
(4)
6 YEAR
COUNTY:
ROAD
ROADIPROJECT NAME AND LOCATION
PROGRAM ROAD
(include brief termini description of MP's; Bridge 9)
ITEM ITEM LOG
NO. NO. NO.
18 27 45010
RANDOLPH - TYNDALL RDS (PATTON BLVD TO STRATFORD RD)
45080
45010 - MP 1.13 TO MP 2.85; 45080 - MP 0.00 TO MO 0.70
Recommended Program
45010 -MP 0.72 TO MP 1.13
(B) COMPUTED DAY LABOR LIMIT (sae bads)
SURFACE (ACP); FINISHED WIDTH = 40 FT.
19 26 45170
22ND AVE (PATTON BLVD TO RANDOLPH RD)
45170 -MP 1.28 TO MP 1.61
45170 - MP 1.61 TO MP 1.88
SURFACE (ACP); FINISHED WIDTH = 40 FT.
20 17 93035
P -NW RD (10.5 -NW TO MARTIN RD)
Assessment
93035 - MP 0.57 TO MP 2.03
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT,
21 47 93010
5-NW/U-NW RAS (SR 281 TO SR 28)
93010 - MP 14.07 TO MP 22.98
Dec. , 1994
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
22 42 46200
McCONIHE RD (SR 17 TO F -NE)
42600 - MP 0.00 TO MP 0.81
Resolution No.
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
23 - - - -
MISCELLANEOUS PROJECTS*
(11)
'INCLUDES COST SHARE PROJECTS
kNNUAL CONSTRUCTION PROGRAM FOR 1995
Program Totals =____>
$1,200 $4,428
$490 $0 $4,407 $731 $5.628
rDAP FnDy,A mn Z /RGi! iitoi\
Pana 3 of 3
AGENCY ACTION
DAY LABOR COMPUTATION
COUNTY:
GRANT
Date of Submittal of
(A) TOTAL CONSTRUCTION.PROGRAM -column (14) t (15)
$5,138,000
Recommended Program
June 7 , 1994
(B) COMPUTED DAY LABOR LIMIT (sae bads)
$800,000
Date of Environmental
(C) TOTAL DAY LABOR PROGRAM - column (15)
$731,000
Assessment
June 15, 1994
Date of Final Adoption
Dec. , 1994
11 - I ine (C) must be smaller than Line (B) "
Resolution No.
94- -CC
(5)_ (6) (7) (8) (9)
(10) 1
(11)
(12)
(13)
(14) 1 (15)
1 (16)
F C TYPE E A SO JRCES
OF FUNDS
E S T I
A A T E D
EXPENDITURES
($1,000's)
PROJECT U L OF N S COUNTY
OTHER FUNDS
CONSTRUCTION
LENGTH N A WORK V S FUNDS
PRELIMINARY
RIGHT
GRAND
C S I E
AMOUNT
PROGRAM
ENGINEERING
OF WAY
TOTAL
(Mika) T S (see work R S ($1.000)
($1.000)
SOURCE
595.10
595.20
CONTRACT DAY LABOR
595.00
coded N S
2.83 7 D E $3
$30
RAP
$40
$0 $0
$40
16
$6
STP(U)
$1
TIA
(PE ONLY)
0.60 8 D E $1
$5
RAP
$10
$0 $0
$10
17
$3
STP(U)
$1
TIA
(PE ONLY)
1.46 8 ABC E $3
$22
RAP
$25
$0 $0
$25
(PE ONLY)
8.91 7 ABC E $8
$67
RAP
$75
$0 $0
$75
(PE ONLY)
0.81 8 ABC E $2
$13
RAP
$15
$0 $0
$15
(PE ONLY)
--- --- ABC E $377
$T5
COST SHARE
$0
$0 $452
$452
Program Totals =____>
$1,200 $4,428
$490 $0 $4,407 $731 $5.628
rDAP FnDy,A mn Z /RGi! iitoi\
Pana 3 of 3