Loading...
HomeMy WebLinkAboutResolution 94-142-CCBOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON IN THE MATTER OF ADOPTING THE 1995 ANNUAL ROAD PROGRAM RESOLUTION NO. 94 -142 -CC WHEREAS, pursuant to the requirements of R.C.W. 36.40.070, Grant County did prepare a 1995 Annual Road Construction Program, and a Comprehensive Road Program for the ensuing six years of 1995 - 2000, and WHEREAS, in accordance with W.A.C. 136.16 an environmental assessment was made on all work within the Annual Program, and WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearing was held and included the 1995 Annual Road Program, and WHEREAS, all comments and/or objections were heard and evaluated, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington that the 1995 Annual Road Construction Program attached hereto is hereby adopted. DONE THIS DAY % - 19-? Zi rf ATTEST; \11Z�V—Au AJ "YV Chairman Clerk of the Board ^ ) Commissioner �_.. Commissioner Constituting the Board of County Commissioners of Grant County, Washington V. CRAB FORM NO. 3 (REV 11/91) ANNUAL CONSTRUCTION PROGRAM FOR 1995 (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT 1. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILIIIES (1) (2) (3) (4) 6 YEAR Date of Submittal of ROAD $5,138,000 ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (Include brief termini description of MPs; Bridge #) ITEM ITEM LOG NO. NO. NO. 1 1 34200 BRIDGE #122, 19 -NW June 15 , 1994 34200 - MP 2.32 TO MP 2.64 Date of Final Adoption BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 2 2 95037 BRIDGE #130, R -NE Resolution No. 94- -CC 95037 - MP 18.87 TO MP 19.08 (10)_ 1 f111 (12) BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 3 3 93035 BRIDGE #338 - MONUMENT HILL B A T E D X P E N D f T Lf R E S ($1,000's) 93035 - MP 1.34 TO MP 1.55 OTHER FUNDS BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 4 4 93025 BRIDGE #345, R -NW PRELIMINARY RIGHT 93025 - MP 0.67 TO MP 0.88 C S I E AMOUNT PROGRAM BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 5 5 91030 DODSON RD (1-90 TO 9 -NE) ($1,000) SOURCE 595.10 91030 - MP 15.88 TO MP 23.79 CONTRACT DAY LABOR 595.00 count N S ACP OVERLAY; FINISHED WIDTH = 34 FT. 6 53 40560 MAE VALLEY RD (WESTSHORE DR TO E -NE) 0.34 8 1 E $163 93047 - MP 0.00 TO MP 1.93 $265 $13 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 7 7 93045 B -NW RD (SR 28 TO WEST CANAL BRIDGE) 93045 - MP 0.00 TO MP 1.31 $85 BR $0 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 8 8 21700 BASELINE EAST RD (POTATO HILL TO SR 17) RAP 21740 21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.60 021 8 1 E $30 $45 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 36 FT. 9 9 92015 M -SE RD (SR 17 TO SR 262) 0.21 8 1 E $28 $41 RAP 92015 -MP 0.00 TO MP 6.46 $69 $0 $69 SURFACE (ACP); FINISHED WIDTH = 34 FT. CRAB FORM NO. 3 (REV 11/91) ANNUAL CONSTRUCTION PROGRAM FOR 1995 1.93 8 ABC E 1.31 7 ABC E 2.37 7 ABC E 6.46 7 D E $27 $249 RAP $14 $20 $205 RAP $11 $45 AGENCYACnON DAY LABOR COMPUTA77ON $17 $126 $803 STP(R) COUNTY. GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) $5,138,000 Recommended Program June 7,19M (B) COMPUTED DAY LABOR LIMIT (see back) - $800,000 Date of Environmental (C) TOTAL DAY LABOR PROGRAM -column (15) $731,000 Assessment June 15 , 1994 Date of Final Adoption Dec. , 1994 11 - Line (C) must be smaller than Line (B) - Resolution No. 94- -CC (51 (61 (7) (8) 1.9.11 (10)_ 1 f111 (12) 1 (13) (14) ( (15) ( (16) F C TYPE E A SO JRCES OF FUNDS E S T I B A T E D X P E N D f T Lf R E S ($1,000's) PROJECT U L OF N S COUNTY OTHER FUNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Mises) T S (see wo(k R S ($1.000) ($1,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 count N S 0.34 8 1 E $163 BROS $265 $13 $278 $115 RAP 0.21 7 1 E $2 $85 BR $0 $104 $0 $104 $17 RAP 021 8 1 E $30 $45 RAP $0 $75 $0 $75 0.21 8 1 E $28 $41 RAP $0 $69 $0 $69 7.91 7 D E $355 $740 CAPP $48 $1,047 $0 $1,095 1.93 8 ABC E 1.31 7 ABC E 2.37 7 ABC E 6.46 7 D E $27 $249 RAP $14 $20 $205 RAP $11 $45 $285 STP(R) $17 $126 $803 STP(R) $50 $218 $44 $276 $178 $36 $225 $260 $53 $879 $0 $330 $929 Rona 1 M'2 CRAB FORM NO 3 (REV 11191) ANNUAL CONSTRUCTION PROGRAM FOR 1995 (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS. TRAILS & BIKEWAYS D. A.C.1P.C.C. PAVEMENT 1. BRIDGES E- CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 6 YEAR Date of Submittal of ROAD ROADIPROJECT NAME AND LOCATION (A) TOTAL CONSTRUCTION PROGRAM -column (14) r (15) PROGRAM ROAD (include brief termini description of MF"s; Bridge #) ITEM ITEM LOG NO. NO. NO. 10 10 92015 BRIDGE #238, MCDONALD RD Date of Environmental 92015 - MP 1.47 TO MP 1.68 (C) TOTAL DAY LABOR PROGRAM - column (15) BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 11 11 92015 BRIDGE #230, MCDONALD RD June 15 , 1994 92015 -MP 4.64 TO MP 4.85 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 12 36 20200 BRIDGE #234,2 -SE RD Dec. , 1994 U " Line (C) must be smaller than Line (B) " 20200 - MP .50 TO MP 0.61 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 13 12 43750 BRIDGE #246, S -NE (5) (6) (7) (8) (9)(10) 43750 - MP 0.00 TO MP 0.25 (12) j (13) BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 14 13 32740 13 -NW (P -NW TO ADAMS RD) OF FUNDS E S T I M A T E D 32740 - MP 0.00 TO MP 3.02 E S ($1,000's) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT 15 14 41690 AIRWAY DRIVE (FAIRGROUNDS TO SR 17) CONSTRUCTION 41690 -MP 1.89 TO 3.21 LENGTH N A WORK V S FUNDS GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER; PRELIMINARY RIGHT FINISHED WIDTH = 50 FT. 16 6 93047 SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NW) AMOUNT PROGRAM 93047 - MP 3.10 TO MP 9.37 OF WAY GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 17 43 93047 SAGEBRUSH FLATS RD (J -NW TO 24 -NW) SOURCE 93048 93047 - MP 9.37 TO MP 11.60; 93048 - MP 5.28 TO MP 6.62 CONTRACT DAY LABOR 595.00 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. CRAB FORM NO 3 (REV 11191) ANNUAL CONSTRUCTION PROGRAM FOR 1995 6.27 7 ABC E $7 $70 RAP $77 $0 $0 $77 (PE ONLY) 3.57 7 ABC E $3 $27 RAP $30 $0 $0 $30 (PE ONLY) P-3oe 2 of 3 AGENCY ACTION DAY LABOR COMPUTATION COUNTY' GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM -column (14) r (15) $5,138,000 Recommended Program June 7 . 1994 (B) COMPUTED DAY LABOR LIMIT (see back) $800,000 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) $731,000 Assessment June 15 , 1994 Date of Final Adoption Dec. , 1994 U " Line (C) must be smaller than Line (B) " Resolution No. 94- -CC (5) (6) (7) (8) (9)(10) (11) (12) j (13) (14) j (15) I (16) F C TYPE E-A SO JRCES OF FUNDS E S T I M A T E D = X P E N D I T U R E S ($1,000's) PROJECT U L OF N S COUNTY OTHERFUNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (►.rues) T S (see work R S ($1,000) ($1,000) SOURCE 695.10 595.20 CONTRACT DAY LABOR 595.00 axles) N S 020 7 1 E $15 $95 STP(R) $9 $101 $0 $110 0.21 7 1 E $9 $61 STP(R) $6 $64 $Q $70 0.11 9 1 E $17 $68 BROS $5 $67 $13 $85 025 9 1 E $32 $160 BR $12 $180 $0 $192 3.02 9 ABC E $90 $30 COST SHARE $0 $0 $120 $120 1.32 16 ABDEF E $818 STP(U) $46 $900 $0 $946 $128 TIA 6.27 7 ABC E $7 $70 RAP $77 $0 $0 $77 (PE ONLY) 3.57 7 ABC E $3 $27 RAP $30 $0 $0 $30 (PE ONLY) P-3oe 2 of 3 (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. tP.C.C. PAVEMENT I. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 6 YEAR COUNTY: ROAD ROADIPROJECT NAME AND LOCATION PROGRAM ROAD (include brief termini description of MP's; Bridge 9) ITEM ITEM LOG NO. NO. NO. 18 27 45010 RANDOLPH - TYNDALL RDS (PATTON BLVD TO STRATFORD RD) 45080 45010 - MP 1.13 TO MP 2.85; 45080 - MP 0.00 TO MO 0.70 Recommended Program 45010 -MP 0.72 TO MP 1.13 (B) COMPUTED DAY LABOR LIMIT (sae bads) SURFACE (ACP); FINISHED WIDTH = 40 FT. 19 26 45170 22ND AVE (PATTON BLVD TO RANDOLPH RD) 45170 -MP 1.28 TO MP 1.61 45170 - MP 1.61 TO MP 1.88 SURFACE (ACP); FINISHED WIDTH = 40 FT. 20 17 93035 P -NW RD (10.5 -NW TO MARTIN RD) Assessment 93035 - MP 0.57 TO MP 2.03 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT, 21 47 93010 5-NW/U-NW RAS (SR 281 TO SR 28) 93010 - MP 14.07 TO MP 22.98 Dec. , 1994 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 22 42 46200 McCONIHE RD (SR 17 TO F -NE) 42600 - MP 0.00 TO MP 0.81 Resolution No. GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 23 - - - - MISCELLANEOUS PROJECTS* (11) 'INCLUDES COST SHARE PROJECTS kNNUAL CONSTRUCTION PROGRAM FOR 1995 Program Totals =____> $1,200 $4,428 $490 $0 $4,407 $731 $5.628 rDAP FnDy,A mn Z /RGi! iitoi\ Pana 3 of 3 AGENCY ACTION DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION.PROGRAM -column (14) t (15) $5,138,000 Recommended Program June 7 , 1994 (B) COMPUTED DAY LABOR LIMIT (sae bads) $800,000 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) $731,000 Assessment June 15, 1994 Date of Final Adoption Dec. , 1994 11 - I ine (C) must be smaller than Line (B) " Resolution No. 94- -CC (5)_ (6) (7) (8) (9) (10) 1 (11) (12) (13) (14) 1 (15) 1 (16) F C TYPE E A SO JRCES OF FUNDS E S T I A A T E D EXPENDITURES ($1,000's) PROJECT U L OF N S COUNTY OTHER FUNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Mika) T S (see work R S ($1.000) ($1.000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 coded N S 2.83 7 D E $3 $30 RAP $40 $0 $0 $40 16 $6 STP(U) $1 TIA (PE ONLY) 0.60 8 D E $1 $5 RAP $10 $0 $0 $10 17 $3 STP(U) $1 TIA (PE ONLY) 1.46 8 ABC E $3 $22 RAP $25 $0 $0 $25 (PE ONLY) 8.91 7 ABC E $8 $67 RAP $75 $0 $0 $75 (PE ONLY) 0.81 8 ABC E $2 $13 RAP $15 $0 $0 $15 (PE ONLY) --- --- ABC E $377 $T5 COST SHARE $0 $0 $452 $452 Program Totals =____> $1,200 $4,428 $490 $0 $4,407 $731 $5.628 rDAP FnDy,A mn Z /RGi! iitoi\ Pana 3 of 3