HomeMy WebLinkAboutResolution 96-003-CCHESULU f ION NO. 95-3—CC _
BEFORE THE BOARD OF COUNTY COMMISSIONERS of GRANT _County, Washington.
Irl the matter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVEO THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to
report and proceed thereon as by law provided. (RCIV 36.75.050, .36.80.030, 36.80.070) (Optional Rcjerences).
IT IS FURTHER RESOLVED that appropriations from the officially adapted road fund budget and based on the county
engineer's estimates are hereby made in the amounts and for the purposes shown:
(1)
ROAD NAME AND/OR
BRIDGE NUMBER
Dodson Road
Bridge No. 234, '2' SE
Sagebrush Fiats
Randolph/Tyndall
22nd Ave.
P -NW Road
5-NW/U-NW
Mr-Conihe Road
(2) (3)
ROAD
LOG
NO.
M.P. TO M.P.
91030 15.88 23.79
20200 0.50 0.61
(4}
(5)
(6)
A,C,D x
93048
5.28
TYPE OF
tr
45010
WORK
it
A,C,E x
(See Code)
C
1.13
A,E
x
1.28
A,I
x
93035
0.57
2.03
x
93047
9.37
11.60
A,C,D x
93048
5.28
6.62
1. BRIDGE CONSTRUCTION
45010
1.13
2.85
A,C,E x
45080
0.00
1.13
95--/-
45170
1.28
1.88
A,C,E x
93035
0.57
2.03
A,C,D x
93010 14.07 22.98, A,C,D x
46200 0.00 0.81 A,C,D x
-',Indicates P.E. only authorized in 1995
0) TYPE OF WORK CODE
A. PRELIMINARY ENGINEERING
F. CURBS & GUTTERS
B. RIGHT-OF-WAY
G. SIDEWALKS
C. GRADING, DRAINING, SURFACING
H. TRAFFIC FACILITIES
D. LIGHT BIT. SURF. TREATMENT
1. BRIDGE CONSTRUCTION
E. A.C. OR P.C.C. PAVEMENT
J. PATHS &TRAILSRCVV
CRP
47.301
ADOPTED this 10th day of January,1995
ATTEST
l� 0/0
Clerk p the Boaill
Recommended for use in connection with WAC 136-18-030,
For Multiple Project Initiation
x
x
FN
x
12
30-* 370 17 95-33-
100
5-3100
40-,- 35 825 18 95-4
1U',
(7)
(e)
(9)
COST ESTIMATE (THOUSANDS)
Annual
Const.
20
95-f:
Pro9-
CRP
ENGIN.
CONSTRUCrMN
Item
No
95--/-
:la.0 4c:.. vc
No.
22
R.O.W.
FEDERAL LOCAL
30
48
1.047
5
95-1
5
68
12
95-2
12
30-* 370 17 95-33-
100
5-3100
40-,- 35 825 18 95-4
1U',
115 130
19
9`r`
25%,
208
20
95-f:
17
75%;
1050
21
95--/-
15*
180
22
954
30
(5) The construction is to be accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county
forces in accordance with RCW 36.77.060 and WAC
136.18.
BOARD OF COUNTY COMMISSIONERS OF
C-_� 4XT COUNTY, WASH.
A/AA