Loading...
HomeMy WebLinkAboutResolution 95-046-CCRESOLUTION NO. 95-46—CC BEFORE THE BOARD OF COUNTY COMMISSIONERS of GRANT COUNTY, WASHINGTON In the matter of initiating County Road Project designated as CRP NO. 95-12 10592 10595 IT IS HEREBY RE�SO,V,L,ED THAT the Coun �,t y Road '241 ; Road, State Road Log No. 10596 11_lAl �_ j' '24. , from Milepost To Milepost be improve? as ollows 1 SW 0.00 0.63 Grade, drain, place additional crushed surfacing, and apply a two (2) shot bituminous surface treatment for a finished roadway width of 26 feet. This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36 75.050, 36 80.030, 36.80.070) (Optional References) IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE Engineering Right of Way Aquisition TOTAL (Not subject to 36.77.060) Construction TOTAL (Check appropriate box) AMOUNT OF APPROPRIATION 611111 41,500 This project is included in the officially adopted Annual Road Program as item No. 23—C 500 42.000 0 This project is hereby made a part of the officially adopted Annual Road Program in accordance with RCW 36.81.130. IT IS FURTHER RESOLVED that: /Check appropriate box) aThe construction is to accomplished by contract in accordance with RCW 36.81.130 an The contract is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18. ADOPTED this 75t-11 day of April , 19--95 Q4ATTEST: Cor th480.r / BOARD OF COUNTY COMMISSIONERS ,ANT COUNTY, WASHINGTON •i Tim Snead, Chairman HI ancher, Commissioner e oy ATiison, Commissioner J J project site 24—sw A—sw 24.1—sw 22 23 24 25 26 27 T 14N �O T13N 20 I MATTAWA � I I� ------------------- 30 U 31 T Q P 0 N