Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution 95-101-CC
RESOLUTION NO. 95-101—CC BEFORE THE BOARD OF COUNTY COMMISSIONERS of GRANT COUNTY, WASHINGTON In the matter of initiating County Road Project designated as CRP NO. 95-16 IT IS HEREBY RESOVLED THAT the 111 NW Road, State Road Log No. 30990 from Milepost 5.95 To Milepost 8.07 be improved as follows: Grade, drain, place additional crushed surfacing, and apply a two (2) shot bituminous surface treatment for a finished width of 28 feet. This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070) (Optional References) IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT OF APPROPRIATION Engineering 500 Right of Way Aquisition TOTAL (Not subject to 36.77.060) 500 Construction 119,500 TOTAL 119,500 (Check appropriate box) ®X This project is included in the officially adopted Annual Road Program as item No. 23—G ® This project is hereby made a part of the officially adopted Annual Road Program in accordance with RCW 36.81.130. IT IS FURTHER RESOLVED that: (Check appropriate box) © The construction is to accomplished by contract in accordance with RCW 36.81.130 ® The contract is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18. ADOPTED this 8th day of August , 19 95. t ATTEST: "a4-1 CI f the Board BOARD OF COUNTY COMMISSIONERS G NT COUNTY, WASHINGTON r J �jT' Snead, Chairman Helen Fancher, Commissioner LeRoy Allison, Commissioner II 0 0 - / nnn irnT rirr 1 -NW ROAD VICINITY MAP