Loading...
HomeMy WebLinkAboutResolution 95-127-CC (002)BOARD OF COUNTY COMMISSIONERS GRANT COUNTY. WASHINGTON IN THE MATTER ADOPTING A POLICY CONCERNING THE ACCOMMODATION OF UTILITIES RESOLUTION NO. 95- 127 -CC ON COUNTY ROAD RIGHT- OF -WAY WHEREAS, in order to effectively administer authority to grant utility franchises and permits on county roads as provided in Chapter 36.55 RCW; and WHEREAS, in order to effectively administer authority to exercise overall responsibility for county roads and bridges as provided in chapter 36,75 RCW; and WHEREAS, in order to effectively administer authority to exercise its police power by adopting a generally applicable written policy ("utility policy") to provide administrative, procedural, and technical guidance for the installation, replacement, adjustment, relocation, and maintenance of all above and below ground utilities and other transmission or transport facilities located within all county road rights of way, and WHEREAS, the Grant County utility policy shall, in accordance with WAC 136, Chapter 40, at a minimum address or include the following: (1) Address all public and private utilities and other transmission or transport facilities which are installed, replaced, adjusted, relocated and/or maintained within the county road right of way pursuant to franchises, permits, and/or exemptions from the permit process including but not limited to electric power, telephone, television, telegraph, communication, water, gas, all petroleum products, steam, chemicals, sewage, drainage, and irrigation; (2) Include general standards and requirements for the location, design, and construction of each utility; (3) Incorporate a written permit process for all utility work not exempted by the provisions of the utility policy, and specify exemptions from such permit process, if any; (4) Include specific requirements for underground utilities which shall include location and alignment, depth of burial and cover, encasement marking, appurtenances and related installation procedures; (5) Include specific requirements for above ground utilities which shall include location and alignment and vertical clearances; (6) Include specific requirements for all utilities which shall include aesthetic/scenic considerations, installations on roadway bridges and structures, site restoration and cleanup, traffic control and public safety, and both normal and emergency repairs, and. WHEREAS, the County Road Administration Board has provided this county a copy of a model utility policy, which will meet the minimum requirements of WAC 136 Chapter 40 and may be amended as necessary to meet the specific needs of this county, WHEREAS, WAC 136-40-030 requires each county legislative authority to formally adopt a utility policy regarding accommodation of utilities on county road rights of way that includes all the requirements enumerated in WAC 136-40-020, and that a copy of such utility policy shall be forwarded to the County Road Administration Board, and WHEREAS, should any existing, adopted utility policy be updated, amended or otherwise modified, said action shall be formally accomplished by the county legislative authority, and that a copy of the officially adopted updated, amended, or modified utility policy shall be forwarded to the County Road Administration Board within thirty days of such adoption. NOW, THEREFORE, BE IT RESOLVED the following utility policy is approved, adopted, and made effective this date.. Done this a ya day of ��J , 1995, r 17/Oierk of tbAAoard nan Commissioner Commissioner Constituting the Board of County Commissioners of Grant County, Washington