HomeMy WebLinkAboutResolution 95-173-CCBOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
IN THE MATTER OF
ADOPTING THE 1996
ANNUAL ROAD PROGRAM
RESOLUTION NO. 95 -173 -CC
WHEREAS, pursuant to the requirements of R.C.W. 36.40.070, Grant County
did prepare a 1996 Annual Road Construction Program, and a Comprehensive Road Program
for the ensuing six years of 1996 - 2001, and
WHEREAS, in accordance with W.A.C. 136.16 an environmental assessment
was made on all work within the Annual Program, and
WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearing
was held and included the 1996 Annual Road Program, and
WHEREAS, all comments and/or objections were heard and evaluated,
NOW, THEREFORE, BE IT RESOLVED by the Board of County
Commissioners of Grant County, Washington that the 1996 Annual Road Construction Program
attached hereto is hereby adopted.
DONE THIS 12th DAY OF December
n�/! A
ATTEST: . O .)d.!
U / "7 �lerk of the Board
- ..........
19 95
LA
Chairman
Commissioner
Commissioner
Constituting the Board of County Commissioners
of Grant County, Washington
CRAB FORM NO.3 (REV 11/91)
ANNUAL CONSTRUCTION PROGRAM FOR 1996
(7) TYPE OF WORK CODE
A. GRADING AND
DRAINING F. SIDEWALKS
B. BASE AND TOP COURSE G. TRAFFIC FACILITIES
C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS
D. A.C. /P.C.C. PAVEMENT
1. BRIDGES
E. CURBS AND GUTTERS
J. FERRY FACILITIES
(1)
(2)
(3)
(4)
6 YEAR
Date of Submittal of
ROAD
(A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15)
ROAD/PROJECT NAME AND LOCATION
PROGRAM
ROAD
(Include brief termini description of MP's; Bridge #)
ITEM
ITEM
LOG
NO.
NO.
NO.
(C) TOTAL DAY LABOR PROGRAM -column (15)
1
Carryover
92015
M -SE RD (SR 17 TO SR 262)
Assessment
June 15 , 1995
92015 - MP 0.00 TO MP 6.46
SURFACE (ACP); FINISHED WIDTH = 34 FT.
2
Carryover
92015
BRIDGE #238, MCDONALD RD
Resolution No.
92015 - MP 1.47 TO MP 1.68
(5) (6) (7) (8) (9)
(10) I
(11)
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
3
Carryover
92015
BRIDGE #230, MCDONALD RD
ESTI
B A T E D
: X P E N D I T U R E S
92015 - MP 4.64 TO MP 4.85
PROJECT U L OF N S COUNTY
OTHER FUNDS
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
4
Carryover
20200
BRIDGE #234, 2 -SE RD
PRELIMINARY
RIGHT
20200 - MP .50 TO MP 0.61
GRAND
C S 1 E
AMOUNT
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
5
1
21700
BASELINE EAST RD (POTATO HILL TO SR 17)
(Moes) T S (seewom R S MAW)
(51,000)
21740
21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.60
595.20
CONTRACT DAY LABOR
595.00
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 36 FT.
6
2
93047
SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NW)
6.46 7 D E $132
93047 - MP 3.10 TO MP 9.37
STP(R)
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
7
3
93047
SAGEBRUSH FLATS RD (J -NW TO 24 -NW)
93048
93047 - MP 9.37 TO MP 11.60; 93048 - MP 5.28 TO MP.6.62
0.21 7 1 E $7
$43
STP(R)
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
8
8
46200
McCONIHE RD (SR 17TO F -NE)
$58
BROS
46200 - MP 0.00 TO MP 0.81
$67
$67
2.37 7 ABC E $60
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
9
4
93035
P -NW RD (10.5 -NW TO MARTIN RD)
$442
6.27 7 ABC E $422
$533
93035 - MP 0.57 TO MP 2.03
$5
$800 $150
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
CRAB FORM NO.3 (REV 11/91)
ANNUAL CONSTRUCTION PROGRAM FOR 1996
Page 1 of 3 ,
AGENCYACTION
DAY LABOR COMPUTATION
COUNTY:
GRANT
Date of Submittal of
(A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15)
$5,672,000
Recommended Program
June 7 , 1995
(B) COMPUTED DAY LABOR LIMIT (see back)
$850,800
Date of Environmental
(C) TOTAL DAY LABOR PROGRAM -column (15)
$783,000
Assessment
June 15 , 1995
Date of Final Adoption
Dec. 1995
11 - Line (C) must be smaller than Line (B) " 11
Resolution No.
95- -CC
(5) (6) (7) (8) (9)
(10) I
(11)
(12)
I (13)
(14) (151_ (16)
F C TYPE E A SO JRCES
OF FUNDS
ESTI
B A T E D
: X P E N D I T U R E S
($1,000's)
PROJECT U L OF N S COUNTY
OTHER FUNDS
CONSTPUCTION
LENGTH N A WORK V S FUNDS
PRELIMINARY
RIGHT
GRAND
C S 1 E
AMOUNT
PROGRAM
ENGINEERING
OF WAY
TOTAL
(Moes) T S (seewom R S MAW)
(51,000)
SOURCE
595.10
595.20
CONTRACT DAY LABOR
595.00
Codes) N S
6.46 7 D E $132
$843
STP(R)
$975
$975
020 7 1 E $9
$61
STP(R)
$70
$70
0.21 7 1 E $7
$43
STP(R)
$50
$50
0.11 9 1 E $9
$58
BROS
$67
$67
2.37 7 ABC E $60
$382
STP(R)
$390 $52
$442
6.27 7 ABC E $422
$533
RAP
$5
$800 $150
$955
3.57 7 ABC E $85
$450
RAP
$10
$20
$415 $90
$535
0.81 8 ABC E $18
$157
RAP
$17
$131 $27
$175
1.46 8 ABC E $25
$225
RAP
$27
$185 $38
$250
Page 1 of 3 ,
ANNUAL CONSTRUCTION PROGRAM FOR 1996
(7) TYPE OF WORK CODE
A. GRADING AND
DRAINING F. SIDEWALKS
B. BASE AND TOP COURSE G. TRAFFIC FACILITIES
C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS
D. A.C. /P.C.C. PAVEMENT
I. BRIDGES
E. CURBS AND GUTTERS
J. FERRY FACILITIES
(1)
(2)
(3)
(4)
6 YEAR
(A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) $5,672,000
ROAD
Recommended Program
ROAD/PROJECT NAME AND LOCATION
(B) COMPUTED DAY LABOR LIMIT (see back)
PROGRAM
ROAD
(Include brief termini description of MP's; Bridge #)
ITEM
ITEM
LOG
$783,000
NO.
NO.
NO.
June 15, 1995
10
5
93035
P -NW RD (MARTIN RD TO 13 -NW)
Date of Final Adoption
9 995
II " Line (C) must be smaller than Line (B) "
30350- MP 9.20 TO MP 10.28
Resolution
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
11
6
30350
BRIDGE #336 - MONUMENT HILL
(1.41 (1.s
(16)
F C TYPE E A SO JRCES OF FUNDS
30350- MP 9.72
_ X P E N D I T U R E S
($1,000's)
PROJECT U L OF N S COUNTY
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
12
7
30350
BRIDGE #337 - P -NW
LENGTH N A WORK V S FUNDS
PRELIMINARY
30350- MP 10.26
GRAND
C S I E
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
13
10
94030
BRIDGE #241, M -NE
(wes) T S (see work R S ($1,000)
($1,000) SOURCE
%5.10
94030 - MP 5.73 TO MP 6.11
CONTRACT DAYLABOR
595.00
codes) N S
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
14
11
91017
ADAMS RD (FRENCHMAN HILLS TO 1-90)
1.08 9 ABC E $180
$10
91017 -MP 6.28 TO MP 14.51
$141 $29
$180
0.02 9 1 E $70
ACP OVERLAY; FINISHED WIDTH = 34 FT.
15
45
20790
E -SE RD (12 -SE TO SR 262)
0.02 9 1 E $30
$5
20790 - MP 4.12 TO MP 7.40
$25
$30
0.38 8 1 E $62
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
16
38
00017
SR 17 BIKEIPEDESTRIAN PATH (PATTON BLVD TO RANDOLPH)
8.23 7 D E $502
$740 CAPP
$42
00017 - MP 20.91 TO MP 23.18
$1,200
$1,242
3.28 9 ABC E $146
SURFACE (PCC); FINISHED WIDTH = 10 FT.
17
12
93010
5-NW/U-NW RDS (SR 281 TO SR 28)
2.27 6 H E $100
PATHS &
$5
93010 - MP 14.07 TO MP 22.98
$95
$100
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
18
13
93010
BRIDGE #389 - 5 -NW
8.91 7 ABC E $7
$62 RAP
$69
93010 -MP 16.12 TO MP 16.13
$69
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
ANNUAL CONSTRUCTION PROGRAM FOR 1996
CRAB FORM NO.3 (REV 11/91) Page 2 of 3
AGENCY ACTION
DAY LABOR COMPUTATION
COUNTY.
GRANT
Date of Submittal of
(A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) $5,672,000
Recommended Program
June 7 , 1995
(B) COMPUTED DAY LABOR LIMIT (see back)
$850,800
Date of Environmental
(C) TOTAL DAY LABOR PROGRAM -column (15)
$783,000
Assessment
June 15, 1995
Date of Final Adoption
9 995
II " Line (C) must be smaller than Line (B) "
Resolution
9y
(5) (6) (7) (8) (9)
(10) I (11)
(12) i
(13)
(1.41 (1.s
(16)
F C TYPE E A SO JRCES OF FUNDS
ESTIMATE D
_ X P E N D I T U R E S
($1,000's)
PROJECT U L OF N S COUNTY
OTHER FUNDS
CONSTRUCTION
LENGTH N A WORK V S FUNDS
PRELIMINARY
RIGHT
GRAND
C S I E
AMOUNT PROGRAM
ENGINEERING
OF WAY
TOTAL
(wes) T S (see work R S ($1,000)
($1,000) SOURCE
%5.10
%5.20
CONTRACT DAYLABOR
595.00
codes) N S
1.08 9 ABC E $180
$10
$141 $29
$180
0.02 9 1 E $70
$5
$65
$70
0.02 9 1 E $30
$5
$25
$30
0.38 8 1 E $62
$249 BROS
$12
$280 $19
$311
8.23 7 D E $502
$740 CAPP
$42
$1,200
$1,242
3.28 9 ABC E $146
$34 COST SHARE
$2
$178
$180
2.27 6 H E $100
PATHS &
$5
$95
$100
TRAILS
8.91 7 ABC E $7
$62 RAP
$69
$69
(PE ONLY)
0.01 7 1 E $1
$5 RAP
$6
$6
(PE ONLY)
CRAB FORM NO.3 (REV 11/91) Page 2 of 3
CRAB FORM NO.3 (REV 11/91)
(n TYPE OF WORK CODE
A. GRADING AND DRAINING F. SIDEWALKS
B. BASE AND TOP COURSE G. TRAFFIC FACILITIES
C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS
D. A.C. /P.C.C. PAVEMENT
1. BRIDGES
E. CURBS AND GUTTERS
J. FERRY FACILITIES
(1)
(2) (3)
(4)
6 YEAR
ROAD
ROADIPROJECT NAME AND LOCATION
AGENCYACTION •
PROGRAM ROAD
(Include brief termini description of MP's; Bridge #)
ITEM
ITEM LOG
NO.
NO. NO.
19
16 45010
RANDOLPH - TYNDALL RDS (19th ST TO STRATFORD RD)
45080
45010 - MP 1.13 TO MP 2.85; 45080 - MP 0.00 TO MO 0.70
(A) TOTAL CONSTRUCTION PROGRAM -column (14) + (15)
$5,672,000
SURFACE (ACP); FINISHED WIDTH = 40 FT.
20
17 45010
RANDOLPH RD (PATTON BLVD TO 19th ST)
(B) COMPUTED DAY LABOR LIMIT (see back)
45010 -MP 0.75 TO MP 1.13
SURFACE (ACP); FINISHED WIDTH = 40 FT.
21
14 45170
22ND AVE (PATTON BLVD TO FORBES)
$783,000
45170 - MP 1.28 TO MP 1.61
Assessment
June 15. 1995
SURFACE (ACP); FINISHED WIDTH = 40 FT.
22
15 45170
22ND AVE (FORBES TO RANDOLPH RD)
Date of Final Adoption
45170 - MP 1.61 TO MP 1.88
11 " Line (C) must be smaller than Line (B) -
SURFACE (ACP); FINISHED WIDTH = 40 FT.
23
18 94040
10 -NE RD (STRATFORD RD TO SR 17)
95- -CC
(5) (6) (1) (8) (9)
94040 -MP 0.00 TO MP 6.53
(11)
(12)
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
24
19 91030
DODSON RD (FRENCHMAN HILLS TO 4 -SW & 1 -SW TO 1-90)
OF FUNDS
E S T I
91030 - MP 5.90 TO MP 10.60; MP 13.60 TO MP 15.42
: X P E N D I T U R E S
($1,000's)
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 36 FT.
25
33 31700
BRIDGE #388,7 -NW
CONSTRUCTION
31700 -MP 3.90 TO MP 4.12
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
26
23 32300
BRIDGE #306 - WILLOW SPRINGS
C S I E
AMOUNT
32300 - MP 20.00 TO MP 20.02
ENGINEERING
OF WAY
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
27
20 - - -
MISCELLANEOUS PROJECTS'
SOURCE
595.10
'INCLUDES COST SHARE PROJECTS
CRAB FORM NO.3 (REV 11/91)
page 3 of 3 w -
•
ANNUAL CONSTRUCTION PROGRAM FOR 1996
AGENCYACTION •
DAY LABOR COMPUTATION
COUNTY.
GRANT
Date of Submittal of
(A) TOTAL CONSTRUCTION PROGRAM -column (14) + (15)
$5,672,000
Recommended Program
June 7 , 1995
(B) COMPUTED DAY LABOR LIMIT (see back)
$850,800
Date of Environmental
(C) TOTAL DAY LABOR PROGRAM -column (15)
$783,000
Assessment
June 15. 1995
Date of Final Adoption
Dee, 1995
11 " Line (C) must be smaller than Line (B) -
Resolution No.
95- -CC
(5) (6) (1) (8) (9)
(10),
(11)
(12)
(13)
(14) I (15)
(16)
F C TYPE E A SO JRCES
OF FUNDS
E S T I
B A T E D
: X P E N D I T U R E S
($1,000's)
PROJECT U L OF N S COUNTY
OTHER FUNDS
CONSTRUCTION
LENGTH N A WORK V S FUNDS
PRELIMINARY
RIGHT
GRAND
C S I E
AMOUNT
PROGRAM
ENGINEERING
OF WAY
TOTAL
(Moes) T S (seework R S ($1.000)
($1.000)
SOURCE
595.10
595.20
CONTRACT DAYLABOR
595.00
codes) N S
2.42 7 D E $10
$40
RAP
$50
$50
(PE ONLY)
0.38 16 D E $1
$9
STP(U)
$10
$10
(PE ONLY)
0.33 8 D E $4
$16
RAP
$20
$20
(PE ONLY)
0.27 17 D E $1
$9
STP(U)
$10
$10
(PE ONLY)
6.53 8 ABC E $4
$36
RAP
$40
$40
(PE ONLY)
6.52 7 ABC E $14
$86
STP(R)
$100
$100
(PE ONLY)
0.22 8 1 E $4
$16
BROS
$20
$20
(PE ONLY)
0.02 8 1 E $3
$12
BROS
$15
$15
(PE ONLY)
- - - - - - ABC E $160
$40 COST SHARE
$200
$200
Program Totals =====> $2.066
$4.106
$480
$20
$4.889 $7831
$6.172
page 3 of 3 w -