Loading...
HomeMy WebLinkAboutResolution 95-173-CCBOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON IN THE MATTER OF ADOPTING THE 1996 ANNUAL ROAD PROGRAM RESOLUTION NO. 95 -173 -CC WHEREAS, pursuant to the requirements of R.C.W. 36.40.070, Grant County did prepare a 1996 Annual Road Construction Program, and a Comprehensive Road Program for the ensuing six years of 1996 - 2001, and WHEREAS, in accordance with W.A.C. 136.16 an environmental assessment was made on all work within the Annual Program, and WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearing was held and included the 1996 Annual Road Program, and WHEREAS, all comments and/or objections were heard and evaluated, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington that the 1996 Annual Road Construction Program attached hereto is hereby adopted. DONE THIS 12th DAY OF December n�/! A ATTEST: . O .)d.! U / "7 �lerk of the Board - .......... 19 95 LA Chairman Commissioner Commissioner Constituting the Board of County Commissioners of Grant County, Washington CRAB FORM NO.3 (REV 11/91) ANNUAL CONSTRUCTION PROGRAM FOR 1996 (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT 1. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 6 YEAR Date of Submittal of ROAD (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (Include brief termini description of MP's; Bridge #) ITEM ITEM LOG NO. NO. NO. (C) TOTAL DAY LABOR PROGRAM -column (15) 1 Carryover 92015 M -SE RD (SR 17 TO SR 262) Assessment June 15 , 1995 92015 - MP 0.00 TO MP 6.46 SURFACE (ACP); FINISHED WIDTH = 34 FT. 2 Carryover 92015 BRIDGE #238, MCDONALD RD Resolution No. 92015 - MP 1.47 TO MP 1.68 (5) (6) (7) (8) (9) (10) I (11) BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 3 Carryover 92015 BRIDGE #230, MCDONALD RD ESTI B A T E D : X P E N D I T U R E S 92015 - MP 4.64 TO MP 4.85 PROJECT U L OF N S COUNTY OTHER FUNDS BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 4 Carryover 20200 BRIDGE #234, 2 -SE RD PRELIMINARY RIGHT 20200 - MP .50 TO MP 0.61 GRAND C S 1 E AMOUNT BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 5 1 21700 BASELINE EAST RD (POTATO HILL TO SR 17) (Moes) T S (seewom R S MAW) (51,000) 21740 21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.60 595.20 CONTRACT DAY LABOR 595.00 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 36 FT. 6 2 93047 SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NW) 6.46 7 D E $132 93047 - MP 3.10 TO MP 9.37 STP(R) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 7 3 93047 SAGEBRUSH FLATS RD (J -NW TO 24 -NW) 93048 93047 - MP 9.37 TO MP 11.60; 93048 - MP 5.28 TO MP.6.62 0.21 7 1 E $7 $43 STP(R) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 8 8 46200 McCONIHE RD (SR 17TO F -NE) $58 BROS 46200 - MP 0.00 TO MP 0.81 $67 $67 2.37 7 ABC E $60 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 9 4 93035 P -NW RD (10.5 -NW TO MARTIN RD) $442 6.27 7 ABC E $422 $533 93035 - MP 0.57 TO MP 2.03 $5 $800 $150 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. CRAB FORM NO.3 (REV 11/91) ANNUAL CONSTRUCTION PROGRAM FOR 1996 Page 1 of 3 , AGENCYACTION DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) $5,672,000 Recommended Program June 7 , 1995 (B) COMPUTED DAY LABOR LIMIT (see back) $850,800 Date of Environmental (C) TOTAL DAY LABOR PROGRAM -column (15) $783,000 Assessment June 15 , 1995 Date of Final Adoption Dec. 1995 11 - Line (C) must be smaller than Line (B) " 11 Resolution No. 95- -CC (5) (6) (7) (8) (9) (10) I (11) (12) I (13) (14) (151_ (16) F C TYPE E A SO JRCES OF FUNDS ESTI B A T E D : X P E N D I T U R E S ($1,000's) PROJECT U L OF N S COUNTY OTHER FUNDS CONSTPUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S 1 E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Moes) T S (seewom R S MAW) (51,000) SOURCE 595.10 595.20 CONTRACT DAY LABOR 595.00 Codes) N S 6.46 7 D E $132 $843 STP(R) $975 $975 020 7 1 E $9 $61 STP(R) $70 $70 0.21 7 1 E $7 $43 STP(R) $50 $50 0.11 9 1 E $9 $58 BROS $67 $67 2.37 7 ABC E $60 $382 STP(R) $390 $52 $442 6.27 7 ABC E $422 $533 RAP $5 $800 $150 $955 3.57 7 ABC E $85 $450 RAP $10 $20 $415 $90 $535 0.81 8 ABC E $18 $157 RAP $17 $131 $27 $175 1.46 8 ABC E $25 $225 RAP $27 $185 $38 $250 Page 1 of 3 , ANNUAL CONSTRUCTION PROGRAM FOR 1996 (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT I. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 6 YEAR (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) $5,672,000 ROAD Recommended Program ROAD/PROJECT NAME AND LOCATION (B) COMPUTED DAY LABOR LIMIT (see back) PROGRAM ROAD (Include brief termini description of MP's; Bridge #) ITEM ITEM LOG $783,000 NO. NO. NO. June 15, 1995 10 5 93035 P -NW RD (MARTIN RD TO 13 -NW) Date of Final Adoption 9 995 II " Line (C) must be smaller than Line (B) " 30350- MP 9.20 TO MP 10.28 Resolution GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 11 6 30350 BRIDGE #336 - MONUMENT HILL (1.41 (1.s (16) F C TYPE E A SO JRCES OF FUNDS 30350- MP 9.72 _ X P E N D I T U R E S ($1,000's) PROJECT U L OF N S COUNTY BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 12 7 30350 BRIDGE #337 - P -NW LENGTH N A WORK V S FUNDS PRELIMINARY 30350- MP 10.26 GRAND C S I E BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 13 10 94030 BRIDGE #241, M -NE (wes) T S (see work R S ($1,000) ($1,000) SOURCE %5.10 94030 - MP 5.73 TO MP 6.11 CONTRACT DAYLABOR 595.00 codes) N S BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 14 11 91017 ADAMS RD (FRENCHMAN HILLS TO 1-90) 1.08 9 ABC E $180 $10 91017 -MP 6.28 TO MP 14.51 $141 $29 $180 0.02 9 1 E $70 ACP OVERLAY; FINISHED WIDTH = 34 FT. 15 45 20790 E -SE RD (12 -SE TO SR 262) 0.02 9 1 E $30 $5 20790 - MP 4.12 TO MP 7.40 $25 $30 0.38 8 1 E $62 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 16 38 00017 SR 17 BIKEIPEDESTRIAN PATH (PATTON BLVD TO RANDOLPH) 8.23 7 D E $502 $740 CAPP $42 00017 - MP 20.91 TO MP 23.18 $1,200 $1,242 3.28 9 ABC E $146 SURFACE (PCC); FINISHED WIDTH = 10 FT. 17 12 93010 5-NW/U-NW RDS (SR 281 TO SR 28) 2.27 6 H E $100 PATHS & $5 93010 - MP 14.07 TO MP 22.98 $95 $100 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 18 13 93010 BRIDGE #389 - 5 -NW 8.91 7 ABC E $7 $62 RAP $69 93010 -MP 16.12 TO MP 16.13 $69 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. ANNUAL CONSTRUCTION PROGRAM FOR 1996 CRAB FORM NO.3 (REV 11/91) Page 2 of 3 AGENCY ACTION DAY LABOR COMPUTATION COUNTY. GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) $5,672,000 Recommended Program June 7 , 1995 (B) COMPUTED DAY LABOR LIMIT (see back) $850,800 Date of Environmental (C) TOTAL DAY LABOR PROGRAM -column (15) $783,000 Assessment June 15, 1995 Date of Final Adoption 9 995 II " Line (C) must be smaller than Line (B) " Resolution 9y (5) (6) (7) (8) (9) (10) I (11) (12) i (13) (1.41 (1.s (16) F C TYPE E A SO JRCES OF FUNDS ESTIMATE D _ X P E N D I T U R E S ($1,000's) PROJECT U L OF N S COUNTY OTHER FUNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (wes) T S (see work R S ($1,000) ($1,000) SOURCE %5.10 %5.20 CONTRACT DAYLABOR 595.00 codes) N S 1.08 9 ABC E $180 $10 $141 $29 $180 0.02 9 1 E $70 $5 $65 $70 0.02 9 1 E $30 $5 $25 $30 0.38 8 1 E $62 $249 BROS $12 $280 $19 $311 8.23 7 D E $502 $740 CAPP $42 $1,200 $1,242 3.28 9 ABC E $146 $34 COST SHARE $2 $178 $180 2.27 6 H E $100 PATHS & $5 $95 $100 TRAILS 8.91 7 ABC E $7 $62 RAP $69 $69 (PE ONLY) 0.01 7 1 E $1 $5 RAP $6 $6 (PE ONLY) CRAB FORM NO.3 (REV 11/91) Page 2 of 3 CRAB FORM NO.3 (REV 11/91) (n TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT 1. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 6 YEAR ROAD ROADIPROJECT NAME AND LOCATION AGENCYACTION • PROGRAM ROAD (Include brief termini description of MP's; Bridge #) ITEM ITEM LOG NO. NO. NO. 19 16 45010 RANDOLPH - TYNDALL RDS (19th ST TO STRATFORD RD) 45080 45010 - MP 1.13 TO MP 2.85; 45080 - MP 0.00 TO MO 0.70 (A) TOTAL CONSTRUCTION PROGRAM -column (14) + (15) $5,672,000 SURFACE (ACP); FINISHED WIDTH = 40 FT. 20 17 45010 RANDOLPH RD (PATTON BLVD TO 19th ST) (B) COMPUTED DAY LABOR LIMIT (see back) 45010 -MP 0.75 TO MP 1.13 SURFACE (ACP); FINISHED WIDTH = 40 FT. 21 14 45170 22ND AVE (PATTON BLVD TO FORBES) $783,000 45170 - MP 1.28 TO MP 1.61 Assessment June 15. 1995 SURFACE (ACP); FINISHED WIDTH = 40 FT. 22 15 45170 22ND AVE (FORBES TO RANDOLPH RD) Date of Final Adoption 45170 - MP 1.61 TO MP 1.88 11 " Line (C) must be smaller than Line (B) - SURFACE (ACP); FINISHED WIDTH = 40 FT. 23 18 94040 10 -NE RD (STRATFORD RD TO SR 17) 95- -CC (5) (6) (1) (8) (9) 94040 -MP 0.00 TO MP 6.53 (11) (12) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 24 19 91030 DODSON RD (FRENCHMAN HILLS TO 4 -SW & 1 -SW TO 1-90) OF FUNDS E S T I 91030 - MP 5.90 TO MP 10.60; MP 13.60 TO MP 15.42 : X P E N D I T U R E S ($1,000's) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 36 FT. 25 33 31700 BRIDGE #388,7 -NW CONSTRUCTION 31700 -MP 3.90 TO MP 4.12 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 26 23 32300 BRIDGE #306 - WILLOW SPRINGS C S I E AMOUNT 32300 - MP 20.00 TO MP 20.02 ENGINEERING OF WAY BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 27 20 - - - MISCELLANEOUS PROJECTS' SOURCE 595.10 'INCLUDES COST SHARE PROJECTS CRAB FORM NO.3 (REV 11/91) page 3 of 3 w - • ANNUAL CONSTRUCTION PROGRAM FOR 1996 AGENCYACTION • DAY LABOR COMPUTATION COUNTY. GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM -column (14) + (15) $5,672,000 Recommended Program June 7 , 1995 (B) COMPUTED DAY LABOR LIMIT (see back) $850,800 Date of Environmental (C) TOTAL DAY LABOR PROGRAM -column (15) $783,000 Assessment June 15. 1995 Date of Final Adoption Dee, 1995 11 " Line (C) must be smaller than Line (B) - Resolution No. 95- -CC (5) (6) (1) (8) (9) (10), (11) (12) (13) (14) I (15) (16) F C TYPE E A SO JRCES OF FUNDS E S T I B A T E D : X P E N D I T U R E S ($1,000's) PROJECT U L OF N S COUNTY OTHER FUNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Moes) T S (seework R S ($1.000) ($1.000) SOURCE 595.10 595.20 CONTRACT DAYLABOR 595.00 codes) N S 2.42 7 D E $10 $40 RAP $50 $50 (PE ONLY) 0.38 16 D E $1 $9 STP(U) $10 $10 (PE ONLY) 0.33 8 D E $4 $16 RAP $20 $20 (PE ONLY) 0.27 17 D E $1 $9 STP(U) $10 $10 (PE ONLY) 6.53 8 ABC E $4 $36 RAP $40 $40 (PE ONLY) 6.52 7 ABC E $14 $86 STP(R) $100 $100 (PE ONLY) 0.22 8 1 E $4 $16 BROS $20 $20 (PE ONLY) 0.02 8 1 E $3 $12 BROS $15 $15 (PE ONLY) - - - - - - ABC E $160 $40 COST SHARE $200 $200 Program Totals =====> $2.066 $4.106 $480 $20 $4.889 $7831 $6.172 page 3 of 3 w -