Loading...
HomeMy WebLinkAboutResolution 97-210-CCBOARD OF COUNTY CO�VVIMISSIONERS Grant County, Washington IN THE MATTER OF ADOPTING THE 1998 ANiVUAL ROAD PROGRAM Resolution IVo. 9�-Zlo-cc WHEREAS, pursuant to the requirements of R.C.W. 36.40.070, Grant County did prepare a 1998 Annual Road Construction Program, and a Comprehensive Road Program for the ensuing six years of 1998 - 2003, and WHEREAS, in accordance with W.A.C. 136.16 an environmental assessment was made on all work within the Annual Program, and WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearirag was held and included the 1998 Annual Road Program, and 4 WHEREAS, all comments and/or objections were heard and evaluated, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington that the 1998 Annual Road Construction Program attached hereto is hereby adopted. DONE THIS 16th DAY OF Dacember , 1997. .a � ATTEST: �'�� ' �.� '� Cl�erk of the Boa'�d �, - �_i LeRoy Allison, Chairman Helen Fancher _� f � � � �� Tim Snead Constituting the Board of County Commissioners af Grant County, Washington (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES G. BITUM. SURF. TREATMENT H. PATHS, 7RAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT I. BRIDGES �. E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4 6 YEAR ROAD ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (include brief termini description of MP's; Bridge *) ITEM ITEM LOG NO. NO. NO. 1 Carryover 32300 BRIDGE i�306, WILLOW SPRINGS 32300 - MP 20.00 TO MP 20.02 BRIDGE REPLACEMENT; F�NISHED WIDTH = 28 FT. 2 Carryover 52500 BRIDGE M153, TURKEY RANCH RD 52500 - MP a.16 TO MP 4.18 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 3 8 41250 VALLEY RD. (CASCADE PARK TO OTYMAR); (Joint Agency Project) 41250 - MP 0.50 TO MP 0.75 I �GRADE, DRAIN, SURFACE (ACP-); FINISHED WIDTH = 48 FT. 4 2 93000 BASELINE W RD (SIUCA RD TO BEVERLY-BURKE RD) 93000 - MP 0,00 TO MP 5.07 GRADE, DRAIN, SURFACE (BS�; FINISHED WIC7TH = 34 FT. 5 1 22000 3-SE RD (SR 17 TO R-SE) 22000 - MP 0,00 TO MP 3.28 GRADE, DRAIN, SURFACE (BS'n; FINISHED WIDTH = 34 FT. 6 9 91027 12-SW/SE RD (Gi-SW TO SR 262) 10270 91027 - MP 0.00 TO MP 4.00; 10260 - MP 0.00 TO MP 3.91 GRADE, DRAIN, SURFACE (BS'n; FINISHED WIDTH = 34 FT. 7 10 95025 PINTO RIDGE (31-NE TO COULEE CIT� 95025 - MP 10.14 TO MP 14.74 WIDEN AND SURFACE (BS'�; FINISHED WIDTH = 28 FT. 8 11 92035 USE RD (I-90 70 EVAN HALL STt.) 92035 - MP 4.82 TO MP 14.74 ACP OVERLAY; FINISHED WIDTH = 34 FT. 9 3 45170 22ND AVE (PATTON BLVD TO FORBES) 45170 - MP 1.28 70 MP 1.61 SURFACE (ACP); FINISHED WIDTH = 40 FT. 10 4 45170 22ND AVE (FORBES TO RANDOLPH RD) 45170 - MP 1.61 TO MP 1.88 SURFACE (ACP); FINISHED WIDTH = 40 FT. CRAB FORM NO. 3(REV 11/91) ANNUAL CONSTRUCTION PROGRAM FOR 1998 AGENCYACTION DAYLABOR COMPUTAT/0N COUNN: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) +(15) $6,810,000 Recommended Program July 8,1997 (8) COMPUTED DAY LABOR LIMIT (see back) 51,021,500 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) 5689,000 Assessment July 15, 1997 --. -- - Date of Final Adoption Dec. ,1997 "" Line C must be smaller than Line B"" Resolution No. 97- -CC (5) (6) (� (8) 9) (10) (11) (12) (13) (14 (15) (16 F C TYPE E A SOURCES OF FUNDS E S T I M A T E D E X P E N D I T U R E S a1,000's PROJECT U L OP N S COUNTY OTHER FUNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRANd C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Mlles) T S (seewax R S (S1,000) (S1,000) SOURCE 595.10 5s5.2o CONTRACT DAYLABOR 6s5.00 codes) N S 0.02 8 I E �19 j116 BROS S15 5120 512 0.02 9 I E �40 s160 BROS ;2 5198 52( 0.25 16 ABDEF E 5113 5113 S11 5.07 7 ABC E 5149 Z639 RAP $39 5615 $134 S7i 3.28 8 ABC E 5193 s369 RAP S24 5450 S� S5t 7.91 7 ABC E $317 $1,019 STP(R) S� 51,250 51,3; 4.60 7 ABC E S90 $810 RAP S51 $726 5123 S9� 7.77 7 D E a129 5811 CAPP $40 $� $9� 0.33 8 ABDE E S13 $112 RAP $5 5120 $1; e 0,27 17 ABOE E $16 $98 STP(U) $9 $105 $1 Page 1 of 3 � (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACIIITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS d, BIKEWA`lS D. A.C.lP.C.C. PAVEMENT I. BRIDGES � E. CURBS AND GUTTERS J. FERRY FACILITIES (1) 2) (3) 4) 6 YEAR ROAD ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (Include brief tennini description of MP's; Bridge *) ITEM ITEM LOG NO. NO. NO. 11 5 45010 RANDOIPH - TYNDALL RDS (191h ST TO STRATFORD RD) 45080 45010 - MP 1.13 TO MP 2,85; 45080 - MP 0.00 TO MO 0,70 SURFACE (ACP); FINI5HED WIDTH = 40 FT. 12 6 45010 RANDOLPH RD (PATTON BLVD TO 19th S'n 45010 - MP 0.75 TO MP 1.13 SURFACE (ACP); FINISHED WIDTH = 40 FT. 13 7 NEW 7-NE RD. (RANDOLPH TO STRATFORD) 40300 NEW - MP 0.00 TO MP 0.40; 40300 - MP 0.00 TO MP 0.48 GRADE, DRAIN, SURFACE (BS'i); FINISHED WIDTH = 34 FT. 14 19 46219 D.5-NE RD (7.8-NE TO MCCONIHE RD) 46219-MPO.00TOMP0.81 GRADE, DRAIN, SURFACE (BS�; FINISHED WIDTH = 26 FT. 15 19 46223 E-NE RD (7.&NE TO NEPPEL RD) 46223 - MP 0.00 TO MP 0.52 GRADE, DRAIN, SURFACE (BS'f); FINISHED WIDTH = 26 FT. 16 12 46780 BRIDGE *120,18-NE 46780 - MP 1,50 TO MP 1.52 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 17 13 93041 BRIDGE �385, K-NW 30410 - MP 5.53 TO MP 5.76 BRIDGE REPLACEMENT; FINISHEO WIDTH = 34 FT. 18 15 94040 10-NE RD (STRATFORD RD TO SR 1� 94040 - MP 0.00 TO MP 6.53 GRADE, DRAIN, SURFACE (BS�; FINISHED WIDTH = 28 FT. 19 14 37690 BRIDGE �314, C.8-NW; (Joint Agency Project) 37690 - MP 0.08 TO MP 0.11 BRIDGE REPLACEMENT 20 17 39200 7-NW RD (SR 283 TO DOpSON RD) 39200 - MP 2.01 TO MP 8,31 GRADE, DRAIN, SURFACE (BS'n; FINISHED WIDTH = 28 FT. ANNUAL CONSTRUCTION PROGRAM FOR 1998 AGENCYACTION DAYLABOR COMPUTATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) +(15) $6,810,000 Recommended Program Juty 8, 1997 (B) COMPUTED DAY LABOR LIMIT (see back) $1,021,500 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) $689,000 Assessment July 15,1997 Date of Finai Adopfion Dec. ,1997 " Une C must be smaller than L ne 8"" Resolution No. 97- -0C (5) (6) (� (8) (9) (10) (11) (12) (13) (14) (15) (16) F C TYPE E A SOURCES OF FUNDS E S T 1 M A T E D E X P E N D I T U R E S $1,000's PROJECT U L OF N S COUNTY OTHER FUNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMiNARY RIGHT GRAND C S I E MAOUNT PROORAM ENGINEERiNG OF WAY TOTAL (Miles) T S �seewwic R S (St,oao) (S1,000) SOURCE ss5.10 595.20 CONTRACT DAY LABOR 5s5.00 codes) N S 2.42 7 - ABD E =82 ;743 RAP S50 5775 �825 0.38 16 ABDE E $18 5117 STP(ln S10 $125 $135 0.88 8 ABC E a146 ;16 =104 S26 5146 0.81 9 ABC E S62 $8 COST SHARE S1 S69 ;70 0.52 9 ABC E S41 ;9 COST SHARE S1 S49 $50 0.02 9 I E 5200 BROS $20 $230 $250 a50 RAP 0.23 8 I E ;246 BROS S20 �290 $310 s64 RAP 6.53 8 ABC E $4 �36 RAP $40 $40 (PE ONL 1� 0.03 9 I E $2 � S14 BROS $16 $16 9 (PE ONL}� 6.30 8 ABC E $4 $36 RAP $40 $40 (� oN�v� CRAB FORM NO. 3(REV 11/91) Page 2 of 3 e (7) TYPE OF WORK CODE A. GRADING AND DRAINING B. BASE AND TOP COURSE �, BITUM. SURF. TREATMENT D. A.C. /P.C.C. PAV�MENi E. CURBS AND GUTTERS F. SIDEWALKS G. TRAFFIC FACILITIES H. PATHS, TRAILS & BIKEWAYS I. BRIDGES J. FERRY FACILITIES ANNUAL CONS7RUCTION PROGRAM FOR 1998 DAY LABOR COMPUTATION (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) (B) COMPUTED DAY LABOR LIMIT (see back) (C) TOTAL DAY LABOR PROGRAM - column (15) '"' Une C must be smaller than Line B"" $6,810,000 $1,021,500 s689,000 AGENCYACTION COUNTY: GRANT Date of Submittal of Recommended Program July 8,1997 Dale of Envi�onmenfal Assessment July 75,1997 Date of Final Adoption _,. Dec. , 1997 Resolution No. 97- -CC (1) 2) (3) (4) (5) (6) (� (8 (9) (10) (11) (12) (13) 14) (15) (16) 6 YEAR F C TYPE E A SOURCES OF FUNDS E S T 1 M A T E D E X P E N D I T U R E S $1,000's ROAD ROAD/PROJECT NAME AND LOCATION PROJECT U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD (Inciude brief termini description of MP's; Bridge *) LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND ITEM ITEM LOG C S ( E AMOUNT PROGF2AM ENGINEERING OF WAY TOTAL NO. NO. NO. (Mlles) T S (seework R S ($t,000) (S1,000) SOURCE 5s5.10 es5ao CONTRACT DAYLABOR 5s5.00 codes) N S 21 16 00017 SR 17 BIKE/PEDESTRIAN PATH (PATTON BLVD TO RANDOLPI� 2.27 6 H E S5 PATHS d� S5 55 00017 - MP 20.91 TO MP 23.18 TRAILS SURFACE (PCC); FINISHED WIDTH = 10 FT. (PEONLI� 23 18 93047 SAGEBRUSH FLATS RD (J-NW TO 24-NV1n ' 3.57 7 ABC E S3 S27 RAP S10 S20 ;30 93048 93047 - MP 9.37 TO MP 11.60; 93048 - MP 5.28 TO MP 6.62 (PE ONL1� GRADE, DRAIN, SURFACE (BS'n; FINISHED WIDTH = 28 FT. 24 19 --- MISCELLANEOUS PROJECTS' --- --- ABC E 5150 S50 COST SHARE 5200 ;200 "INCLUDES COST SHARE PROJECTS Program Totals =____> 51,596 55,734 S� $20 56,121 S�9 57,330 F m CRAB FORM NO. 3(REV 11/91) e Page 3 oi 3 �, . ;