HomeMy WebLinkAboutResolution 17-027-CC I30ARD OF COUNTY COMMISSIONERS
Grant County, Washington
RESOLUTION IN THE MATTER OF RESOLUTION No. 17- O�"� -CC
AMENDING A COMPREHENSIVE SIX
YEAR TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE YEARS 2017-2022
WHEREAS,pursuant to the requirements of Section 6, Chapter 83, Laws of
Extraordinary Session of the State of Washington, Grant County did prepare a Comprehensive
Transportation Improvement Program for the ensuing six years; and
WHEREAS, priority array of projects prepared in accordance with County Road
Administration Board Standards of Good Practice (WAC 136-14) was made available and was
consulted by the Board during the preparation of the Six Year Program; and
WHEREAS, the Engineer's report with respect to deficient bridges was available to the
Board during the preparation of the Six Year Program; and
WHEREAS, an environmental pre-assessment of the Six Year Program indicated that
the social, economic and aesthetic values would not be disturbed; and
WHEREAS, pursuant further to said Law, the Board of County Commissioners, being
the legislative body of the County, did prepare, revise and extend said Six Year Program and did
hold a public hearing on said Comprehensive Plan at 1:30 p.m. at the Grant County Courthouse,
Ephrata, Washington on the 29rd day of November, 2016.
'
NOW, THEREFORE BE IT HEREBY RESOLVED THAT the Grant County
Board of Commissioners APPROVE the attached amendment to the 2017-2022 °
Comprehensive Six Year Road Program presented at the public hearing. I
DATED this ��day of �2017.
������ I
i
�
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY WASHINGTON i
Yea Nay Abstain ' ,
� � ;
C�' ❑ ❑ ' '
Cindy Ca er, Chair i
;
,
ATTEST: � � �
������ �
Richard Stevens, Member I
Barba�i .V que � I
Clerlc of th acr � � � Tom
Ta,yl�r, Me ticr
� �z����� Six Y�ar Transportation Impravement Program
From 2a�7 to ao�2
Agency: Grant Co.
County: Grant
MPOIRTPO: Qaad-Co RTPO N tnsids Y Outside
m
� a
� a o
�
-p' � N � R -�I � ^xl
� —• A.PIWProject No. B.STIP ID � a � = � o `z
3 Z C,Project Title = A � �. � �e °i � ,�
� c D.Road Flame or Nurrntaer Q o g � � � �
w o 3 E_Begin 8�End Termini '* � � z K °o. � K "'
y v � F.Project Description G.Sfructure ID � �, R ? m � � �m a
'16 8 WA-09$27 11/29/16 11/29/16 03/14/17 04 P T 1.040 GE No
3 NE Overlay
940Q0
3.88 to 4.92
3-NE 94406 LocaBon:N»NE to.01 miles east of RR tracks.
From MP 3.85 to 4.92 FFC 06 AND 16.
2R CNertay-Work consists of HMA OverEay,Shoutder finishing,traffic controI and
other items.Total project cosY$400,000
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Coda Federal Funds State Fund Code State Funds Local FunBs Totai Funds
S PE 2017 0 D S,OOd 5,OQ0
S CN 2097 STP{US} 341,&�5 4 53,325 395,QQ0
Totais 341,675 0 58,325 400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6Yh
PE 5,4Q4 0 0 0 0
CN 395,000 0 0 0 0
Totals 400,000 0 0 0 0
Report Date:March 09,2017 Page 2