Loading...
HomeMy WebLinkAboutResolution 96-177-CCBOARD O� COUIVTY COMM1SSlONERS GRANT CQUIVTY, WASHINGTON IN THE MATTER OF ADOPTING THE 1997 RE50LLTTI4N NO. 96-177-CC ANN�UAL Rl7AD PROGRAM WHEREAS, pursuant to tfie�requirements of R.C.W. 36.40.070, Grant County did prepare a 1997 Annual Road Canstructian Pragram, and a Comprehensive Raad Program for the ensuing six years of 1997 - 2002, and WHEIZEAS, in accordance with W. A. C. 136.16 an environmental assessment was made on all work within the Annual Program, and WHEREAS, pursuant to the requirements of l�. G W. 36.40. 80, a public hearing was held and included the 1997 Annual Road Program, and Wf3EREAS, alI comments andlor objections were heard and evaluated, NOW, THEREFORE, BE IT RESOLVED by the Board of Caunty Commissianers af Grant County, Washington that the 1997 Annual Raad Construction Program attached hereto is hereby adopted. � DONE 7H15_1 ��— DAY OF December , 19.,_21 f ;./1 RTl'EST: � • � r �lt'ft� �_✓�-�?:__. � v%� � �� Clork af the Board t .�r,- > .. .....,,.. ,_. _ .w...... � Cpmmissioner d� j/�/�� 1 � Cqmmissioner Constituting the Baard of County Commissioners of Grant County, Washington � (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A,C. /P.C.C. PAVEMENT' I. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES 1 2 3 4 6 YEAR RbAD ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (Include brief termini description of MP's; Bridge #) ITEM ITEM lOG NO. NO. NO. 1 Carryover 93035 P-NW RD (10.5-NW TO MARTIN RD) 93035 - MP 0.57 TO MP 2.03 GRAOE, ORAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 2 Carryover 93035 P-NW RD (MARTIN RD TO 13-NW) 30350- MP 9.20 TO MP 10.28 GRAbE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 3 10 32300 BRIDGE #306, WILLOW SPRINGS : 32304 - MP 20.00 TO MP 20.02 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 4 12 15910 BRIDGE #393, O-SW 15910-MPO.00TOMP0.08 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 5 NEW 93000 BASELINE W RD (SILICA RD TO BEVERLY-BURKE RD) 93000 - MP 0.00 TO MP 5.07 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 6 2 93010 5-NW/U-NW RDS (SR 281 TO SR 28) 7 3 93010 8 8 91030 9 11 22000 93010 - MP 14,07 TO MP 22.98 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 36 FT. BRIDGE #389, 5-NW 93010-MP16.12TOMP16.13 BRIDGE REPLACEMENT; FINISHED WIDTH = 3�1 FT. DODSON RD (FRENCHMAN HILLS TO 4-SW & 1-SW TO i-90) 91030 - MP 5.90 TO MP 10.60; MP 13.60 TO MP 15.42 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 36 FT. 3-SE RD (SR 17 TO R-SE) 22000 - MP 0.00 TO MP 3.28 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. ANNUAL CONSTRUCTION PROGRAM FOR 1997 AGENCY ACiCON DAY LABOR COMPUTATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) +(15) $7,009,000 Recommended Program June 4, 1996 (B) COMPUTEO DAY LABOR LIMIT (see back) $1,051,350 Date of Environmental (C) TOTAL DAY LABOR PROGRAM - column (15) $675,000 Assessment June 11, 1996 � Date of Final Adoption Dec. , 1996 "' Line C must be smaller than Line B*" ' Resolutlon No. 96- -CC 5 6 7 8 9 10 11 12 13 14 15 16 ' F C TYPE E A SOURCESOFFUNDS ESTIMATED EXPENOITURES $1,000's PROJECT U L OF N S COUNTY OTHERFUNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S i E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL (Miles) T S(seework R S ($t,000) ($1,000) SOURCE 595.10 595.20 CONTRACT DAYLABOR 595,00 codes N S 1.46 8 C E $45 $45 $45 1.08 9 C E $35 $35 $35 0.02 8 I E $19 $116 BROS $15 $120 $135' 0,08 9 I E $156 BROS $20 $175 $195 $39 RAP 5.07 7 ABC E $75 $679 RAP $39 $715 $754 8.91 7 ABC E $372 $977 RAP $39 $1310 $1349 0.01 6.52 3.28 7 7 8 I ABC ABC E E E $8 $140 $95 $71 $898 $369 RAP STP(R) RAP $7 $100 $25 $72 $758 $324 $79 $1,038 $464 � CRAB FORM NO. 3(REV 11/91) Page 1 of3 (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIOEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILiTIES C. BITUM. SURF. TREATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C, /P.QC. PAVEMENT I. BRIDGES E. CURE3S AND GUTTERS J, FERRY FACILITIES 1 2 3 4 6 YEAR ROAD � ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (Include brief termini description of MP's; Bridge #) ITEM ITEM LOG NO. NO. NO. 10 19 91030 DODSON RD (SR 26 TO FRENCHMAN HILLS) 91030-MPO.00TOMP5.90 ACP OVERLAY; FINISHED WIDTH = 34 FT. , 11 9 91017 ADAMS RD (SR 26 TO FRENCHMAN HILLS) ', 91017-MPO.00TOMP6.28 �, ACP OVERLAY; FINISHED WIDTH = 34 FT. I 12 4 45170 22ND AVE (PATTON BLVD TO FORBES) • I 45170-MP1.28TOMP1.61 I� SURFACE (ACP); FINISHED WIDTH = 40 FT. �II 13 5 a5170 22ND AVE (FORBES TO RANDOLPH RD) 45170 - MP 1.61 TO MP 1.88 SURFACE (ACP); FINISHED WIDTH = 40 FT. 14 6 45010 RANDOLPH - TYNDALL RDS (19th ST TO STRATFORD RD) 45080 45010 - MP 1.13 TO MP 2.85; 45080 - MP 0.00 TO MO 0.70 SURFACE (ACP); FINISHED WIDTH = 40 FT. 15 7 45010 RANDOLPH RD (PATTON BIVD TO 19th ST) 45010-MP0.75T0 MP 1.13 SURFACE (ACP); FINISHED WIDTH = 40 FT. 16 Carryover 00017 SR 17 BIKE/PEDESTRIAN PATH (PATTON BLVD TO RANDOLPH) 00017 - MP 20.91 TO MP 23.18 SURFACE (PCC); FINISHED WIDTH = 10 FT. 17 NEW 52500 BRIDGE #153, TURKEY RANCH RD 52500 - MP 4.16 TO MP 4.18 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. I' 18 NEW 46780 BR�DGE #120, 18-NE I 46780 - MP 1.50 TO MP 1.52 � BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. i� i � i w:RAB FORM NO. 3(REV 11/91) ANNUAL CONSTRUCTION PROGRAM FOR 1997 AGENCY ACTION DAYLABOR COMPUTATION COUNTY: GRANT Date of Submittal of (A) TOTAL CONSTRUCTION PROGRAM - column (14) +(15) $7,009,000 Recommended Program June 4, 1996 (B) COMPUTED DAY LABOR LIMIT (see back) $1,051,350 Date of Environmental (C) TOTAL DAY L�BOR PROGRAM - column (15) $675,000 Assessment June 11, 1996 � Date of Final Adoption Dec. , 1996 "* Line C mu'sf be smaller than Line 8** Resolution No. 96- -CC 5 6 7 8 9 10 11 12 13 14 15 16 F C TYPE E A SOURCES OF FUNDS E S T I M A T E D E X P E N D i T U R E S $1,000's PROJECT U L OF N S COUNTY OTHERFUNDS CONSTRUCTION LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTA� (nnues) T S�seewonc R S �$i,000) ($�,000) SOURCE 595.10 sss.2o CONTRACT OAYLABOR 595.00 codes N S 5.90 7 D E $800 $50 $750 $80( 6.28 7 D E $110 $740 CAPP $50 $800 $85( 0.33 8 A�D E $13 $112 RAP $5 $120 $12'. 0.27 17 ABD E $16 $98 STP(U) $9 $105 $11� 2.42 7 ABD E $82 $743 RAP $50 $775 $82: 0.38 16 ABD E $18 $117 STP(U) $10 $125 $13! 2.27 6 H E $100 PATHS & $5 $95 $10( TRAILS 0.02 9 I E $87 BROS $10 $90 $10( $13 RAP 0.02 9 I E $14 BROS $16 $1f $2 RAP (PE ONLY) Page 2 of 3 (7) TYPE OF WORK CODE A. GRADING AND DRAINING B. BASE AND TOP COURSE C. BITUM. SURF. TREATMENT D. A.C. /P.C.C. PAVEMENT E. CURBS AND GUTTERS F. SIDEWALKS G. TRAFFIC FACILITIES H. PATHS, TRAILS & BIK�WAYS I. BRIDGES • - J. FERRY FACIL.ITIES ANNUAL CONSTRUCTION PROGRAM FOR 1997 DAY LABOR COMPUTATION (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) $7,009,000 (B) COMPUTED DAY LABOR LIMIT (see back) $1,051,350 (C) TOTAL DAY LABOR PROGRAM - column (15) $675,000 ** Line C must be smaller than Line B*" AGENCY ACTf ON COUNTY: GRANT Date of Submittal of Recommended Program June 4, 1996 Date of Environmental Assessment June 11, 1996 Date of Final Adoption Dec. , 1996 Resolution No. 96- -CC 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 6 YEAR F C TYPE E A SOURCES OF FUNDS E S T I M A T E D E X P E N D I T U R E S $1,000's ROAD ROAD/PROJECT NAME AND LOCATION PROJECT U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD (Include brief termini description of MP's; Bridge #) LENGTH N A WORK V S FUNDS PRELIMINARY RIGHT GRANO IT�M ITEM LOG C S I E AMOUNT PROGRAM ENGINEERING OF WAY TOTAL NO. NO. NO. (Miles) T S(see work R S (S1,000) ($1,000) SOURCE 595.10 ss5.2o CONTRACT DAY LABOR 595.00 codes N S 19 29 93041 BRIDGE #385, K-NW 0.23 8 I E $14 BROS $16 $16 93041 - MP 0.07 TO MP 0.30 $2 Rqp BRIDGE REP�ACEMENT; FINISHED WIDTH = 34 FT. �Pe oN�Y) PO NEW 37690 BRIDGE #314, C.8-NW 0.03 9 .I . E $2 $14 BROS $16 $16 37690 - MP 0,08 TO MP 0.11 (PE ONLV) BRIDGE REPL'ACEMENT; FINISHED WIDTH = 28 FT. 21 13 91027 12-SW/SE RD (G-SW TO SR 262) ' 7.91 7� ABC E $73 STP(R) $85 . $85 10270 91027 - MP 0.00 TO MP 4.00; 10260 - MP 0.00 TO MP 3.91 � $12 RAP GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. �Pe oN�Y) 22 28 39200 7-NW RD (SR 283 TO DODSON RD) 6.3 8 ABC E $4 $36 RAP $40 $40 39200 - MP 2.01 TO MP 8.31 (PE ONLY) • ' GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 23 14 94040 10-NE RD (STRATFORD RD TO SR 17) 6.53 8 i16C E $4 $36 RAP $40 $40 94040-MP 0.00 TO MP 6.53 (PE ONLV) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 24 15 95025 PINTQ RIDGE (31-NE TO COULEE CITY) 3.57 7 ABC E $5 STP(R) $50 $50 95025 - MP 10.14 TO MP 14.74 - $45 RAP WIDEN AND SURFACE (BST); FINISHED WIDTH = 28 FT. (Pe oN�v) 25 1 93047 SAGEBRUSH FLATS RD (J-NW TO 24-N1M 3.57 7 ABC E $3 $27 RAP $10 $20 $30 93048 93047 - MP 9.37 TO MP 11.60; 93048 - MP 5.28 TO MP 6.62 (PE ONLY) GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 26 16 - - - MISCELLANEOUS PRO:IECTS` - - - - - - ABC E $240 $60 COST SHARE $300 $300 "INCLUDES COST SHARE PROJECTS ' Program Totals =___=> $2 181 $5 555 $707 $20 $6 334 $675 $7 736 0 ` CRAB FORM NO. 3(REV 11/91) Page 3 of 3 1997 Annual Construction Program - $7,736,000 REVENUE SOURCE & DISTRIBUTION $3,163,000 (40.9%) Rural Arterial Program $100,000 (1.3%) Paths and Trails Fund $740,000 (9.6%) County Arteriai Preservation Program $60,000 (0.8%) Gost Share Program $401,000 (5.2°/a) Bridge Replacement - Off System $0 (0.0%) Bridge Replacement - On System $976,000 (12.6%) STP(Rural) $215,000 (2.8%) STP(Urban) $880,000 (11.4%) Local Only (No Matching Funds) $1,201,000 (15.5%) Local Matching Funds