HomeMy WebLinkAboutResolution 00-004-CCRESOLUTION NO. 20oo-4—cc
BEFORE THE BOARD OF COMMISSIONERS OF GRAIVT COUNTY, WASHINGTON
In the matter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby and authorized io
report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.�30, 36.80.070)(Optional References).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county
engineer's estimates are hereby made in the amounts and for the purposes shown:
cv c2� c3> c4� cs> cfi> m c$> c9�
C D
ROAD NAME AND/OR ROAD PE OF N Y COST ESTIMATE (THOUSANDS) Ann. Const. CRP
_ BRIDGE NUMBER Log No. WORK R Const. Prog. No.
A L
M_P. TO M.P. c A
T B
O
R En in. Construction
(SEE COD� R.O.W. Federal Local Item No_
U-SW RD (24-SW TO 26 SV1l) 10590 1.01 3.02 ABCD X X $28 $255 $47 6 00-1
8-SE RD (WARDEN CITY LIMITS 92047 0.24 3.22 ABCD X X $50 $505 �95 _ 7 00-2
TO ADAMS COUNTY LINE)
ADAMS RD. (SR 28 TO I-90) 91017 14.78 23.68 AE X $30 $520 8 00-3
BEVERLY-BURKE RD (FRENCH 91013 14.52 20.69 AE X $30 $830 9 00-4
MAN HILL TO SR 281) 93000 5.07 6.54 X
ZO-NW RD PEDESTRIAN PATH 93032 2.28 2_64 H X $3 $22 10 00-5
(GINKO TO DIVISION)
HUNTER CANYON RD (8-NWTO NEW 0.00 1.10 ABCI X $10* 175 35 14 00-6
17.7-NVV)
L-NE RD (KITTLESON TO 7-NE) 94005 0.00 4.06 ACD X X$40* 1038 162 16 00-7
40005 0.00 2.01
BEVERLY-BURKE RD (SR 26 91013 7.22 14.52 ABCD X X$50* 1250 17 00-8
TO FRENCHMAN HILL)
BRIDGE #380, 7-NW (EAST OF 39200 1.18 1.39 1 X $20* 60 15 18 00-9
DODSON)
BRIDGE #158, 12-NE (BRIDGE 94030 8.91 9.13 1 X $30" 80 20 19 00-10
REPLACEMENT)
12-SE RD (SR 262 TO ADAMS ) 91027 4.00 11.56 ABCD X $80* 1168 182 13 00-11
COUNTY LINE)
NOTE: * Denotes PE Onlv in 2000 with Construction in 2001
(4) TYPE OF WORK CODE
A_ PRELIMINARY ENGINEERING
B. RIGHT-OF-WAY
C_ GRADING, DRAINING, SURFACING
D. LIGHT BIT. SURF. 7REATMENT
E. A.C_ OR P.C.C. PAVEMENT
F. CURBS 8 GUTTERS
G. SIDEWALKS
H. TRAFFIC FACILfT1ES
1. BRIDGE CONSTRUC710N
J. PATHS 8 TRAILS RCW 47.301
ADOPTED this llth day of January, Z000
ATTEST
, T
� ���1 /� �i �
Clerk of t� �'oard �i
(5) The construction is to be accomplished by con�tract
in accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county
forces in accordance with RCW 36.77.060 and WAC
136-18
Recommended for use in the connection with WAC 136-18-030,
For Multiple Project Initiation
BOARD OF COMMISSIONERS OF
GRANT COUNTY, WASHINGTON