HomeMy WebLinkAboutResolution 07-173-CCBOARD OF COUNTY COMMISSIONERS
Grant County, Washington
IN THE MATTER OF ADOPTING
THE 2008 ANNUAL ROAD PROGRAM
RESOLUTION NO. 2007- /73-CC
WHEREAS, pursuant to the requirements of R.C.W. 36.40.070, Grant County did
prepare a 2008 Annual Road Construction Program, and a Comprehensive Road Program for the
ensuing six years of 2008 - 2013, and
WHEREAS, in accordance with W.A.C. 136.16 an environmental assessment was
made on all work within the Annual Program, and
WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearing was
held and included the 2008 Annual Road Program, and
WHEREAS, all comments and/or objections were heard and evaluated,
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners
of Grant County, Washington that the 2008 Annual Road Construction Program attached hereto
is hereby adopted.
EFFECTIVE DATE: January 1, 2008
DATED this � day of ,�2 , 2007.
Ye�Nay Abstain
❑ ❑
� ❑ ❑
ATTEST:
� ❑ ❑
Clerk o the o r
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
Kfchard 5tevens, Member
� I
Cindy Cart , Member
ANNUAL CONSTRUCTIOId PROGRAM FOR 2008
DAY LABOR CONSTRUCTION S�,000s:
(A) 70TALCONSTRUCTIONPROGRAM-column('14j+{'IS) $6£72
(B) COMPUTED DAY LABOR LIMR (see instructions) �1,001
(C) TOTAIDAYLABORPROGRAM-wlumn('IS) $863
" Line (C) must be smailer fhan Line (B) "
� -
= m � '
: � ;� C7 O;
: a O z : ROAD =
e z i} a w: LOG c
i � -� O F- NO.
: tL i Q —
. r . � _
ROAD/PROJECT NAME
AND LOCATION
(Include brief termini description
or MP's; Bridge #)
?:Carryover : 97027 ; �2 SE RD_ (F-SE TO ADAMS CO.LINE) Adams Co_ Lead Agency
= 99027 - MP 9.02T0 MP'11.56 STP(R)-C131
' GRADE, DRA1N, SURFACE (HMA); FIN. W1D. = 34 FT.
= 2:Carryover i 3�790 c BRlD6E#1425, CRESCENTBAR BROS-13CN
� 3179D - MP Z.50 TO MP 2.72 Br#08253500
: BRIDGE REHAB. HMA (4"); FINISHED WIDTH = 44 FT.
= 3=Carryover ; 21880 ; BRIDGE �228, 4 SE RD Q.35 mi W of M SE) BROS-2013
: 2'I880 - MP 025 TO MP 0_36 Br#08272500
: BRIDGE REPLACEMENT, HMA; FINISHED WIDTH = 28 FT.
; 4� 1 E 42350 c lARSON TRAIL (GRAPE DR)
; 42350 - MP 0_00 TO MP 1.80
GRADE. DRAIN, SURFACE (Conc.MMA); FIN. WID. = 12 FT.
.. 34 ; 12370 ; ROAD I SW (SR 26 TO'12 SW)
72370 - MP 0.00 TO MP 1.02
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 Ff.
, 4 ; 39050 ; E NW RD (SR 28 TO N. FRONTAGE)
: 39050 - MP 0.00 TO MP '10.36
E GRADE, DRAIN, SURPACE {BS7); FW. WID. = 34 FT.
, 5 : 509'10 E BRIDGE#1'18, F-NE BROS-2013:
: 509'10 - MP 0.51 TO MP 0.54 Br#08053200:
� BRIDGE REPLACEMENT, HMA; FINISHED WIDTH = 24 FT.
� E= 6 : 91013 : BEVERLY-BURKE RD SW (SR 243 to SR 26)
� 91013-MPO.00TOMP722
E 6RADE, DRAIN, SURFACE (BST); FlNISHED WIDTH = 34 FT_
., 7 = 94000 : BRIDGE #244, 3-NE (Easf of O-NE) STP-P130�
94000 - MP 4_9] TO MP 5_03
; BRIDGE REPLACEMEM, HMA; FINISHED UUIDTH = 34 FT.
GRAVEL TO BST SURFACING PROGRAM for 2008
,,. 8 : 31650 : VNW(6NWT07.5NW)MPO.00TOMP7.50 FIN.WID_=26ft. ;
. 9 � 14200 ; 10-SW (A SW TO DODSON) MP 3.34 TO MP 5.8"I FIN.W ID. = 26 ft. ;
�.. "10 :'1'1020- ; BEVERLY STREETS MP 0.00 TO MP 0.99 FIN.WID. = 24 ft. ;
: 'I'I'110 ;
... '11 ; 10800- � SCHAWANA STREETS (MP 0.00 TO MP 7.89) FIN.W ID. = 24 ft. �
; 10930 :
CR.4B FORM NO. 3(REV 08/05)
.:.._ .:.:......:....:.:.........:.:. ... ......i......,:.:..»...f
. .. :. .
: : � •: J
:v =' � : �n : F Z� SOUI
F : Z i w : z -•• ...............
'O Z = � � � O : � � COUNTY '
'a �: U U: y ; O W FUNDS �
i� i � : � v�j
� (Mles) : �- � : Z Q (1D00's)
:w
2.54; 07 ; ABCD : E SiQ3:
0.02: 08 : I E
0.1'I i 09 ; I E "
'1.80: 08 ; ABDG : E $58:
09 ;
'1.02; 09 ; ABC ; E $'136;
'10.369 OS ' ABC : E $1$5;
0.22= 09 � I E
7225 08 ; ABC = E $'I:.6c
0_'I'li 09 � I E u�380c
0.73� 09 � ABC ; E 5990;
2.47; 09 : ABC : E $371 c
0.99: U9 ; ABC ; E $'129:
'1.899 09 9 ABC : E � $246�
, ;PAGETOTALS S1.E54i
AGENCY ACTION: COUNTY> GRANT
Current Population: a2,soo
DATE RECOMMENDED PROG. SUBMifTED .November 20, 2007
DATE OF ENVIRONMENTAL ASSESSMENT July 24, 2007
DATE OF FINAL ADOPTION December � 1, 2007
ORDINANCElRESOLUTION NO. 2007- -CC
DATE OF AMENDMENT
. OTHER FUNDS
AMOUNT �PROGRAM
('1000'S) ; SOURCE
5657; STPti2;
$756; 8�
$'165: 1D0`,>�
ERCS
$�92: STPiEi
; LOCi,L
�1.665; P.,'-.�
$480� iDO:�
: 6FtvS
.........................._........................._......--'--•.................
(t2) (13) (14j (15} ('I6)
..........» .............._................................. _....................:
E S T I M A T F D E X P E N D i T U R� S .
PRELIM. ; -pF .......:.:....::... .:..:..:....� GRAND
ENGR. � WAY � DAY TOTAL
595.10 � 59520 �CONTR,4CTE LABOR ALL595.00 �
�iaoos) ; �i000�s) : (l000•s) = (i.000s)
$45( $715;
a
$28
$'12
$'I5
$1,218: � tii;P $'100
� L��Cr".L $30
: �ec�� $s
: LOC�iL $15
: L'JCfiL $8
: LOG%L $11
$728�
$'153:
$235;
$1,700:
$390:
$965'
$350:
$76:
$257�
$81:
$159�
$'131
�289
$29
$99
$40
$76
$760:
$756:
$'16S
$250:
$'136:
$1,850 �
v,aso�
$1,354=
�380:
$»o=
$371:
$129�
$246:
Page 9 of 2
INSTRUCTIONS FOR USE OF THE ANNUAL CONSTRUCTION PROGRAM FORM
(CRAB FORM #3, REVISED 8/05) WAC 136-16-010 through 042
**** GENERAL DATA REQUIREMENTS ****
AGENCY ACTION blocks; - complete all items as shown
- — ---------- --------- --------- — ---- ---
DAY LABOR COMPUTATION block - Line (A) is the grand total of contract and day labor construction from the totals of columns (15) and (16). Line (B) is
the computed day labor limit as per RCVV 36.77.065; compute as follows and enter in the Line (B) space (use the laraer of the dollar amount or percent
I(mit calculation) ; The digital form makes this selection automatically.
Counties > 50,000 in population: Counties < 50,000 in population:
Line A amount Limit� L mit of Line A Line A amount Limit�% Li�mit of Line A
> $4 million (> $4 M) $800,000 15°/a > $4 million (> $4 M) $880,000 25°/a
> $1.5 M to < $4 M $525,000 20% > $1.5 M to < $4 M $577,000 30%
> $500,000 to < $1.5 M $250,000 35% > $500,000 to < $1,5 M $275,000 45%
Less than $500,000 $250,000 (or $35,000 per project Less than $500,000 $275,000 (or $38,500 per project
_ ___ for entire program) _ _________________for entire program) ^____
**** COLUMNAR DATA REQUIREMENTS ****
(1) Item No. Use consecutive numbers beginning with 1. No priority is assumed.
(2) 6 Year Road propram item No. - Use the priority number from column 1 on your most recent 6 year transportation improvement program
(DOT Form 140-049). No number is necessary for miscellaneou,s projects as permitted under WAC 136-16-025.
(3) Road Lop No. - County road log number (when applicable) as per the current road log as maintained by each county.
(4) Road/Proiect Name and Location - Enter the road or project name and location information as assigned by the county. As appropriate,
fnclude mileposts (from county road log), bridge numbers and etc.
(5) Proiect lenqth - Enter the project length in miles.
(6) Functional Class - Enter the functional class for the
road on which the project (s to be located. The codes
listed below can be found in the road log.
RURAL
02 Principal Arterial
06 Minor Arterial
07 Major Collector (FAS)
08 Minor Collector
09 Local Access
URBAN
12 Principal Arterial
13 Principal Arterial
14 Major Arterial
15 Principal Arterial
16 Minor Arterial
17 Collector Arterial
19 Local Access
--------- __ _ --- - -- --• - .. _.. --- ...-- ------ --------------
(7) Tvpe of Work - Use one or more of the codes listed. List major work
items first reflecting the nature of the anticipated final project,
A. GRADING & DRAINAGE G. TRAFFIC FACILITIES
B. BASE & TOP COURSE H. PATHS, TRAILS, BIKEWAYS
C. B.S.T. / SEALS I. BRIDGES
D. A.0 ./ P.C.C. PAVEMENT J. FERRY FACILITIES
E. CURBS AND GUTTERS K, ENVIRONMENTAL MITIGATION
F. SIDEWALKS L. FISH PASSAGE
I) Environmental Assessment - Use the following assessment codes (Reference: State Environmental Policy Act)�
S= Signif(cant I= Insignificant E= Exempt
"** PLEASE iVOTE THAT THE DOLLARS IN COLUMNS 9 through 16 REFLECT ONLY TH� AMOUNiS AND SOURCES
EXPECTED TO BE SPENT DURING THE APPLICABLE CALENDAR YEAR
(9) Source of Funds - Countv - Enter the total amount of county funds estimated for the project (use columns 10 and 11 for RID, developer
contributions, and similar non-county funds).
(10) Source of Funds - Other Funds - Enter the total amount of other funds estimated for the project. If more than one "other" source (such as
RAP + FAS), show each "other" amount separately.
(11) Source of funds - Other Funds Proqram Source - For each "other" source shown in column 10, enter the abbreviation for the source type
(ex: RAP, FAS, CAPP, BROS, UAB, TIB, RID, PVT, PWTF, etc,)
(12) Estimated Exaenditures - Preliminaru Enqineerina - Enter the estimated amount of preliminary engineering expenditures for the project
this year. All engineering costs incurred prior to contract award are considered preliminary engineering,
(13) Estimated Expenditures - Riaht of Wav - Enter the estimated amount of right of way expenditures for the project this year.
(14) Estimated Expenditures - Construction - Contract - Enter the estimated amount of contract construction expenditures, inciuding
construction administration and engineering, to be incurred by the county.
(15) Estimated expenditures - Construction - Day Labor - Enter the estimated amount of day labor expenditures, includii7g construction
administration and engineering, for the project in the program year. Materiais incorporated into a day labor project, even though created or
supplied by a separate co�tract (ex: crushing) are to be included in the day labor construction amount.
(16) Estimated exoenditures - Grand Total - Enter the total estimated expenditures for the proJect this year. This must equal the sum of
columns 12 through 15 and also the sum of columns 9 through 10. The program total of this column should also equal the amount of
construction shown in the final annual road budget.
Please note that total anticiaated costs for Maintenance is reauired lines aer WAC 136-16-035
Please calculate and show vour dav labor calculations• totai all fundinq and expenditure columns at the bottom of 4he last paqe
submitted.
DAY LABOR CONSTRUCTION
(A) TOTALCONSTRUCTIONPROGRAM-column('14j+(�5j
(B) COMPUTED DAY LABOR LIMR (See insUuctions)
(C) TOTAL DAY LABOR PROGRAM- column (�� -
ANNUAL CONSTRUCTION PROGRAM FOR 2008
� S�,000s:
$6,672
$1,00'I
$863
" Line (C) must be smaller than Line (B) "
i � : a
: m : � � p: ROAD/PROJECT NAME
°�� Q � Z� ROAD : AND LOCATION
: z :} a w: LOG
� W: CO Q�; NO. (Include brief tertnini description
: f- = p� or MP's; Bridge #)
,- 3 ' NEW .� NEVA LAKE RD NW (SR 28 TO EAST GATE OF LANDFILL)
; 37312 - MP 0.00 TO MP 0.75
; GRADE, DRAIN, SURFACE (HMA 4" two Iifts); FIN. WID. = 34 FT.
� 15 = �3 : 20670 : D SE (�2 SE to SR 26) .
: 2067D - MP 0.00 TO MP 5.1�
E GRADE, DRAIN, SURFACE (BS"n; FINISHED WIDTH = 34 FT.
?�!G ? �4 E 42350 = GRAPE DR_ NE (SR 17T0 LORING) ',
; 42350 - MP 0.00 TO MP 1.00
? GRADE, DRAIN, SURFACE (BS'n; FINISHED WIDTH = 34 FT.
; GRAVEL TO BST SURFACING PR06RAM for 2009
, 15 : 94030 : M NE (10 NE TO'i2 NE) MP 6.16 TO MP 824 FIN_W ID. = 28 ft:
�? 8 ' '16 : 32740 : 13 NVJ (MON. HILL TO ADAMS) MP 0_00 TO MP 3_02 FIN.WID. = 26 ft. :
' 1� ' 17 � 11910 : OSW(9SWT01'ISW)MPO.00TOMP2.03 FIN.WID_=26ft.:
MAPLE DR VICINf1Y STREETS:
., '18 : 42420 :a BUTLER (BEACON TO END) MP 0.00 TO MP 0.09 FIN_W ID. = 24 R:
: 4240'I ; b STEVJART (BEACON TO MAPLE) MP 0.00 "f0 MP 0.'18 FIN.WID. = 24 ft. :
; 42690 E c ROB W(BEACON TO END) MP 0.00 TO MP 0_04 FM.WID_ = 24 8. c
; 427"10 :.d DOUGHERTY (ORCHARD-END) MP 0.00 TO MP 0.06 FIN.WID. = 24 ft. :
. �9 : 94025 � STRATFORD RD NE {20 NE to SR 28)
94025 - MP'1724 TO MP 21.70
: GRADE, DRAIN, SURFACE (BST); FINISNED WIDTH = 30 FT.
��2 = 20 ? 3'1'160 : COMMUNITY ST NW PATH (RNER DR TO CHUKAR)
; 3'I 160 - MP 0.00 TO MP 0.'13 �
: GRADE, DRAIN, SURFACE (HMA -3"): FINISHED WIDTH = 12 FT.
= ZS � 6� : NEV+J � NEPPEL RD NE EXi'ENSION
; NEW - MP 0.00 TO MP 1.�0 (7.5 NE to McCONIHE)
g GRADE, DRAIN, SURFACE (BS�; FIMSHED WIDTH = 34 FT_
- ?� = 12 --- : MISCELLANEOUS PROJECTS'
'INCLUDES COST SHARE PROJECTS
_ . . � GRADE, DRAIN, SURFACE (BST) _
CRAB FORM tJ0_ 3(REV OS/OS)
AGENCYACTION: COUNTY> GR.4NT
Current Population: s2.soo
DATE RECOMMENDED PROG. SUBMITTED November 20, 2007
DATE OF ENVIRONMENTAL ASSESSMENT July 24, 2007
DATE OF FINAL ADOPTION December ��, 2007
ORDINANCE/RESOLUTION NO. 2007- -CC
DATE OF AMENDMENT
: _ _ -- _'� = � � STIMATED EXP E ND ITU RES
r _¢ r SOURCES OF FUNDS E '
' _ : J : fn F .
.� � c a i w : iz W� ............... ......••......._......•-•-_.•• ALL /N$]000's
- --
. 'z mE o '
:O Z = � � � fl � � � CQUNTY : OTHER FUNDS ? RIGHT ; CONS�UCTION
'a � e v U � Y ' p W FUNDS r..-�-•••-.. __ . _... ....••-..... PRELIM. � OF - . .... .......-• - GRAND :
: _ � � = � � � AMOUNT =PROGRAM ENGR. , WAY ; DAY TOTAL =
i�,r,��� = �- � ; Z ¢ �i000�s7 (1000's) = SOURCE 595.10 E 595.20 ;CONTRACT, i.ABOR ALL595.00 �
, , : w . . S�000s) i ryaoo•s) � (�aoo•s) _ (i.000s) _
0.75:
5.'I 1:
1.00:
2.08 �
3.02:
2.03 ;
0.09:
0.18:
0.04 �
0_06 ;
4.469
09 E ABD
�$ ` ii6C -
OS � ABD ,
09 ;
OS ; ABC '
09 � ABC :
09 : ABC i
09 : ABC ;
09 ? ABC :
09 ; ABC :
09 : ABC i
07 ; ABC 9
09 � ABC ?
08 : ABC E
--: ABC �
PAGE/PROGRAM TOTALS,C
WAC '136-16-035,
E
E
f
E
E
E
E
E
E
E
E
E
$12:
.�`jJ:
�
$25:
"�'I 1 =
$'!5;
$10=
$12;
$47=
$5:
$�5'
$215'
�
: SGL1D $'12
:.'ASiE
(ap vtJ� •-
58p: RkP $89
: r�e or-r• �?
� � 1
: LOCF;L $25
� ar p�iL �.
: LGCAL $1'I
,nF'v'rrt'r; $15
� $10 :
_ ' $'IZ :
L i'l.f�L $47
ipp pri' v:
�rCfit $5
!PE OA._ .:
LOCAL $15 I
,P��:�i ,' I
LvCi;L � $�5� . � �200
$89�
$25�
$11:
$15:
$10;
$12;
$47'
$5:
$15�
$2'I5:
Page 2 of 2
INSTRUCTIONS FOR USE OF THE ANNUAL CONSTRUCTION PROGRAM FORM
(CRAB FORM #3, REVISED 8/05) WAC 136-16-010 through 042
**** GENERAL DATA REQUIREMENTS ****
AGENCY ACTION blocks; - complete all items as shown
- --- -- ------- - --------- --_ __ -- _ _ --....-- - - - ----- -------------- __
DAY LABOR COMPUTATION block - Line (A) is the grand total of contract and day labor construction from the totals of columns (15) and (16). Line (B) is
the computed day labor limit as per RCW 36.77.065; compute as follows and enter in the Line (B) space (use the larqer of the dollar amount or percent
limit calculation) : The digital form makes thfs selection automatically.
Counties > 50,000 in population:
Line A amount
> $4 mfllion (> $4 M)
> $1.5 M to < $4 M
> $500,000 to < $�,5 M
Less than $500,000
or
Limitr%L mit of Line A
$800,000 15°/a
$525,000 20%
$250,000 35%
$250,000 (or $35,000 per project
for entire program)
Counties < 50,000 in population:
Line A amount
> $4 million (> $4 M)
? $1.5Mto<$4M
> $500,000 to < $1.5 M
Less than $500 000
or
Limit�% Li�mit of Line A
$880,000 25%
$577,000 30%
$275,000 45%
$275,000 (or $38,500 per project
for entire program)
**** COLUMNAR DATA REQUIREMENTS ****
(1) Item No. Use consecutive numbers beginning with 1. No priority is assumed.
(2) 6 Year Road proqram item No. - Use the priority number from column 1 on your most recent 6 year transportation improvement program
(DOT Form 140-049). No number is necessary for miscellaneous projects as permitted under WAC 136-16-025.
(3) Road Loa No. - County road log number (when applicable) as per the current road log as maintained by each county.
(4) Road/Proiect Name and Location - Enter the road or project name and location iriformation as assigned by the county. As appropriate,
include mileposts (from county road log), bridge numbers and etc.
(5) Proiect lenqth - Enter the project length in miles,
(6) Functional Class - Enter the functional class for the
road on which the project is to be located. The codes
listed below can be found in the road log.
RURAL
02 Principal Arterial
06 Minor Arterial
07 Major Collector (FAS)
08 Mfnor Collector
09 Local Access
URBAN
12 Principal Arterial
13 Princ(pal Ar#erial
14 Major Arterial
15 Principal Arteria
16 Minor Arterial
17 Collector Arterial
19 Local Access
(7) Tvpe of Work - Use one or more of the codes listed. List major work
items first reflecting the nature of the anticipated final project.
A. GRADING & DRAINAGE
B. BASE & TOP COURSE
C. B,S.T. / SEALS
D. A.0 ./ P.C.C. PAVEMENT
E. CURBS AND GUTTERS
F. SIDEWALKS
G. TRAFFIC FACILITIES
H. PATHS, TRAILS, BIKEWAYS
I. BRIDGES
J. FERRY FACILITI�S
K. ENVIRONMENTAL MITIGATION
L. FISN PASSAGE '
(8) Environmental Assessment - Use the following assessment codes (Reference: State Environmental Policy Act);
S= Significant I= Insignificant E= Exempt
*"* PLEASE NOiE THAT THE DOLLAR3 IN COLUMNS 9 through 16 REFLECT ONLY THE AMOUNTS AND SOURCES
EXPECTED TO BE SPEN7 DURING THE APPLICABLE CALENDAR YEAR
(9) Source of Funds - Countv - Enter the total amount of county funds estimated for the project (use columns 10 and 11 for RID, developer
contributions, and similar non-county funds).
(10) Source of Funds - Other Funds - Enter the total amount of other funds estimated for the project. If more than one "other" source (such as
RAP + FAS), show each "other" amount separately.
(11) Source of funds - Other Funds Proaram Source - For each "other" source shown in column 10, enter the abbreviation for the source type
(ex: RAP, FAS, CAPP, BROS, UAB, TIB, RID, PVT, PWTF, etc.)
(12) Estimated Expenditures - Preliminart Enqineerina - Enter the estimated amount of preliminary enginee.ring expenditures for the project
this year. All engineering costs incurred prior to contract award are considered prelfmfnary engineering.
(13) Estimated Expenditures - Riqht of Wa� - Enter the estimated amount of right of way expenditures for the project this year,
(14) Estimated Expenditures - Construction - Contract - Enter the estimated amount of contract construction expenditures, iriciudinc�
construction adm(nistration and engineering, to be incurred by the county.
(15) Estimated ex enditures - Construction - Da Labor - Enter the estimated amount of day labor expenditures, ina{uding construction
administration and engineering, for the project in the program year. Materials incorporated into a day labor project, even though created or
suppl(ed by a separate contract (ex: crushing) are to be included in the day labor construction amount.
(16) Estimated expenditures - Grand Total - Enter the total estimated expenditures for the project this year. This must equal the sum of
columns 12 through 15 and also the sum of columns 9 through 10. The program total of this column should also equal the amount of
construction shown in the final annual road budget.
Please note that total anticipated costs for Maintenance is reauired lines per WAC 136 16 035
Please calculate and show vour dav labor calculations• total all fundinq and expenditure columns at the bottom of the last paae
submitted.