IN THE MATTER OF AMENDING A
COMPREHENSIVE SIX YEAR
TRANSPORTATION IMPROVEMENT RESOLUTION No. 13- �I I-CC
PROGRAM FOR THE YEARS 2013-2018
WHEREAS, pursuant to the requiremeilts oF Section 6, Chapter 83, Laws of Extraordinary
Session of the State of Washington, Grant County did prepare a Comprehensive Transportation
Improvement Program foi• the ensuing six years; and
WHEREAS, priority array of projects prepared in accot•dance with Cotulty Road
Administt•atio�l Board Standards of Good Practice (W�1C 136-14) was made available ai�d was consulted
by the Board during the preparation of the Six Year Program; and
WHEREAS, the Engineer's report with respect to de�cieirt briclges was available to the
Board during the pi°epar�tion of the Six Year Program; and
WHEREAS, an ei�vironmeiltal pre-assessment of the Six Yeac• Program iildicated that the
social, ,economic aud aesthetic vahles would not be disturbed; and .
WHEREAS, pursuant further to said Law, the Board of Cotuity Commissioners, being the
legislative body of the County, did prepare, revise and extend saicl Six Year Program and did hold � public
hearing on said Comprehensive Plan �t 2:00 p.m, at the Grant Couiity Courthouse, Ephrata, Wasl�ington .on
the 24t�' day of July, 2012.
NOW, THEREFORE BE IT RESOLVED by the Board of County Cominissioners of
Grant County, Wasliington, that the Compr�eheusive Six Year Road Program presented at the public
hearing be amended as shown.
EFFECTIVE DATE� � �� , 2013.
DATED this _��� day of� , 2013�
Yea Nay Abstain
L�X ❑ ❑
� ❑ ❑
�
❑ ❑
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
Richard Stevens, Member
Agency. Grant County
co. No.: 13 co. Nar„e: Grant County
City No. - - - MPO/RTPO: QUICICO
I Project Identification
� N�� A. Federal Aid No. B_ Bridge No.
� -- -fl C. Project Title
o �0 � �
c � D_ StreeNRoad Name of Number
LL a� E. Beginning MP or road - Ending MP or road
F. Describe Workto be Done
1 I 2 I 3
� = m
� m �
£ � � U
J
n � � � �
� � �
Page 1 of 1
STRATFORD RD. NE RV�
07 � Rd. No.: 94025 - Tyndall to 10-NE (eastbound) 07 S 2.69 p T CN
From: MP 4.36 To: MP 7.05
HMA Overiay (3"); Finished Width = 34 Ft.
Total Project Cost $ 911,000 TO'
STP(R)-E131(006) (2092ConstructionProject-Applyingfor PE
DODSON RD. SW Addnl Funds) RV1
07 � Rd. No.: 91030-4-SW to Frenchman Hills Rd. 07 S 4.70 p,T CN
From_ MP 5_90 To: MP 10.60
HMA Overlay (2"); Finished Width = 34 Ft.
� Total Project Cost $ 72,000 TO"
' denotes carryover for STIP TOTALS 7.39
Six Year Transporfiation Improvement Prograrn
From 2013 to 2018
Heanng Date: Juty 24, 2012 Adoption Date: July 24, 2012
Amend Date: Feb. �s, 20�3 Resolution No.: 2012- 047 - CC
Project Costs in Thousands of Dollars Federally Fundec
6cpenditure Schedule
Fund Source Information Projects Only
(Local Agency)
Federal Funding R/W
Phase Federal Federal State 4� thN Envir Required
Start Fund Costby Fund State Local Total 1st 2nd 3rd �t� Type Date
779
787
62
DOT Form'140-049 Rev. 9/95 Distribution: 2 TransAid; TIB; CRAB; RTPO; Planning; PUD; Irriga6on Districts; Telephone Compani
122 901 901;
124 911 911;
10 72 72
10 72 72
134 983 91'I� 72
CE No
911
CE NO
72