Loading...
HomeMy WebLinkAboutResolution 13-002-CCBOARD OF COUNTY COMMISSIONERS ;,s�� � ��. � �.� i.�-�� � Grant County, Washington � :. �g Iy-{,�:yY =-'��_-��.� ��...,Fi-" �/Nf��' .�{;,9, , ��,; `��'���1' ,'�� - �J-- �� y4, ;;;� � f��,y.'��:<Fsr�t��'� fC IN THE MATTER OF AMENDING A COMPREHENSIVE SIX YEAR RESOLUTION No. 13-(�OZ,-CC TRANSPORTATION IMPROVEMENT PROGRAM FOR THE YEARS 2013-2018 WHEREAS, pursuant to the requirements of Section 6, Chapter 83, Laws of �xtraordinaiy Sessioil of the St�te of Washington, Grant County did prepare a Comprehensive Transportation Improvement Prograul for the ensuing six years; and WHEREAS, priority art•ay of projects prepared in accoi•dance with County Road Administration Boarcl Standards of Good Practice (WAC 136-14) was made available and was consulted by the Board dtuing the preparation oI'the Six Year Program; and WHEREAS, the Eilgineer's report with respect to deficient bridges was available to the Board diuing the preparation of the Six Year Prograin; and WHEREAS, an environmental pre-assessment of the Six Year Program indicated that the social, econoinic and aesthetic values would not be disturbed; aiid WHEREAS, pursuant further to said Law, the Board of County Commissioners, being the legislative body of the County, did prepare, revise and extend said Six Year Program aud did hold a public hearin� on said Comprehensive Plan at 2:00 p.m. at the Grant County Cotu�thouse, Ephrlta, Washington on the 24t' day of July, 2012. , NOW, THEREFORE BE IT RESOLVED by the Bo2rc1 of Cotulty Commissioners of Grant County, Washington, that the Comprehensive Six Year Road Program presanted at the public hearing be amended as shown. EFFECTIVE DATE: , � , 2013. DATED this n� day of � , 2013. Y� Nay ❑ � ❑ L�( ❑ BOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON Abstain ❑ Cindy Cart , Chair ❑ C o-1 Swartz, Vice la'r � J Richard Stevens, Membar Page 1 of 1 Six Year Transportation Irr�provement Program From 2013 to 2018 agency: Grant County Co. No.: 13 co. Name: Grant County Hearing Date: July 24, 2012 Adoption Date: July 24, 2012 City No. --- MPO/RTPO: QUadCO Amend Date: .lanuary a, zo�3 Resolution No.: 2012- 047 - CC Project Identification Project Costs in Thousands of Dollars Federally J = � � �n Fxpenditure Schedule � A_ Federal Aid No. B. Bridge No. � o� a R Fund Source Information Funded Projects (LocalAgency) � � � � � C. Project Title � �' � � �j a Federal Fundin � p� P D. Street/Road Name of Number o�`� � � � Phase Federal Federal State Envir Required � d z, a �:Q — � 4th thru u_ E. Beginning MP or road - Ending MP or road � � � o Start Fund Cost by Fund State Local Total "Ist 2nd 3rd 6th Type Date I F. Describe Work to be Done a (mm/dd/yy Code Phase Source Funds Funds Funds (mm/yy) 1 � 2 � 3 4 5 6 7 8 9 10 1'I 12 13 14 15 '16 97 18 19 20 21 PE 2'l 3 24 24t ADAMS RD. SW (Funded in 2093) RW 07 �� Rd. No.: 91017 - Frenchman Hills to 3-SW 07 S 427 p,T CN 1087 170 1257 � 1257; CE No From: MP 6.28 To: MP 10.55 HMA Overlay (2"); Finished Width = 34 Ft. Total Pro'ect Cost $ 1,281,000 TOTALS STP R 1108 173 128'I ; 1281; PE 17 3 20 20; N-NE/SE RD (Funded in 201� RW 07 19 Rd.No.: 92025-2-NEtoSR'17 07 S 4.03 p,T CN 741 1'16 857 857j CE No From: MP 0.00 To: MP 4.03 HMA Overlay (2"); Finished W idth = 34 Ft Total Pro'ect Cost $ 877,000 TOTALS STP R) 758 119 877 877i STP(R)-E133 PE 35 5 40 40� ADAMS RD. SW (Funded in 2014) RW 07 25 Rd. No.: 91017 - SR 26 to Frenchman Hill Rd. 07 S 628 P,T CN 1595 249 1844 ; 1844; CE No From: MP 0.00 To: MP 6.28 HMA Overlay (2"); Finished Width = 34 Ft. Total Pro'ect Cost $ 1,884,000 TOTALS STP(R) 1630 254 1884 � �884� BROS-2013 Bridge No_: 08753400 PE 29 29 29 BRIDGE #399, W NW (Funded in 2013) RW 09 43 Rd. No.: 32390 - 027 mi N of Baird Springs 09 S 021 p,T CN 4072 72.8 480 480 CE No From: MP 0.17 To: MP 0.38 Bridge Replacemerrt-60 If, guardrail, approaches; Fin. Width = 26 Ft. CON Total Pro'ect Cost $ 509,000 TOTALS BRS 407.2 101.8 509 509 ' denotes carryover for STIP TOTALS 14.79 3903.2 647.8 4551 2158 1884 509 DOT Form 140-049 Rev. 9/95 Distribution: 2 TransAid; TIB; CRAB; RTPO; Planning; PUD; Irrigation Districts; Telephone Compani