IN THE MATTER OF AMENDING A
COMPREHENSIVE SIX YEAR RESOLUTION No. 12- Q�`�-CC
TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE YEARS 2012�2017
WIIEREAS, pursuant to the requirements of Section 6, Chapter 83, Laws of Extraordinary
Session of the State of Washington, Grant Cotulty did prepare a Comprehensive Transportation
Iinproveinent Pr•ogram for the ensuing six years; and
WHEREAS, pt�iority array of projects prepared in accordance with Cotulty Road
Administration Board Standards of Good Practice (WAC 136-14) was inade available and was consulted
by the Board during the preparation of the Six Year Progr�m; and
WHEREAS, the Engineer's report with respect to de�cient bridges was available to the
Board durulg the preparation of the Six Year Program; and
WIIEREAS, an environmental pre-assessment of the Six Year Program indicated that the
social, economic and aesthetic values would not be disturbed; and
WHEREAS, pm•suant fiu-ther to said Law, the Board of Cotulty Commissioners, being the
legislative body of the County, did prepare, revise and eYtend said Six Year Program and did hold a pltblic
hearing on said Comprehensive Plan at 2:00 p.m. at the Grant County Courthouse, Ephrata, Washingtozl on
the 26t�' day of Ju1y, 2011.
NOW, TIIEREFORE BE IT RESOLVED by the Board of Cotulty Commissioners of
Grant County, Washingtoii, that the Comprehensive Six Yea�• Road Program pz•esented at the public
l�earing be amended as shown.
EFFECTIVE DATE: October 16 , 2012,
DATED this �,t day of �C� �ber , 2012.
Yea Nay Abstain
� ❑ ❑
� ❑ ❑
� ❑ ❑
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WAS�IINGTON
Agency:
Co. No.:
Grant County
13 Co. Name: Grant County
Page 1 of 1
Six Year Transportation Inlproerement Program
From 2012 to 2017
Hearing Date: July 26, 2011 Adoption Date: July 26, 2011
City No. --- MPO/RTPO: QUadCO Amend Date: Oct. 16, 2012 Resolution No.: 2011- 059 - CC
Project Costs in Thousands ofi Dollars Federall Funded
� Project Identification : Expenditure Schedule (Local pro e t OnI
` ` c = ' � y Fund Source Information 1 y
� ` A. Federal Aid No. B. Bridge No. ;��_ ; � a y Agency) ----�--�-�-
c (ntwa� s E�€ N: c o �a
� N� � s= C. Project Title a� �; 3 � V � Federal Fundin ____ ___,____ �
. �:oE' ,>Q: �: a — :
� U: � : ' ° '�= cn ' ;a_ � Phase Federal Federal State � Envir ; Re uired
LL , a Z; D. Street/Road Name of Number ; Q i- ; o = � ` : ` 4th thru q
E. Beginning MP or road - Ending MP or road '� ~ � � Start Fund Cost by Fund State Local Total 1st; 2nd; 3rd; �h Type : Date
a : (mm/YY)
—�-----
` F. Describe Work to be Done___.__._ _.___.____.�__;,__�.,,_,.____.;____ mm/dd/ Code Phase Source Funds Funds Funds
1 2 _ : s €
� - ------3 -------- --._.� 4 _� 5 � 6..._..�-�- �-- = --.._..9..---- - 10__._.. 11 12.._. 13_ ._14_ __ 15 _ .. 16 17 --- 18 19 20 _21---
PE 59 6 65 65;
i 7-NE RD (Project not funded) RW
�� ; Rd. No.: 94030 - Stratford Rd to M-NE = CN 990 110 1100 � 1100;
3g 03 P 3.00 P,T
�$ From: MP 0.00 To: MP 3.00
; ; Grade, Drain, SurFace (HMA); Finished Width = 34 Ft. ; ' ______._._._____.._.._.._____ _..._.___ __—_.__.___�.---__ ___ ---- ---
i- + +
: _ Total PrJect Cost___ $1,165,000 __._.___ ._._..__.:._.. : _;__..._._______ TOTALS _____.___..________..__._ RAP _„_ 1049__ 116 ..._._ 1165 �.___+ 1165 ___.__ _._.____
PE 41 4 45 45;
sADAMS RD. NW (Projectnotfunded); RW
�$ : Rd. No.: 91017 - SR 28 to Br#330 ; 03 = CN 990 110 1100 ; 1100;
3g 09 _ P 1.86 P,T
? From: MP 23.68 To: MP 25.54
' ; Grade, Drain, Surf (HMA), Br Repl.; Finished Width = 28 Ft. � ; ; ---„----.----..-.-.--.------.-. -.------ --.--.._..-.-- _---+--..-�--_;_.---.._..
:Total Project Cost .__$1. 1, 45,000 �_.._...---- ------.-._—��.._._..._.._..-_�—._ TOTALS---._._.._..-----.--.-.--------�P ---..1031 114_.___1145 ---+--..-.-+--114b.+_--_ ..--. —
PE 45 5 50 50;
iS FRONTAGE RD (Projectnotfunded); RW
08 Rd. No.: 16720 - Dodson Rd to Winchester Wasfeway CN 495 55 550 550;
40 03 P 3.15 P,T
' From: MP 9.92 To: MP 13_07
; ; Grade, Drain, Surface (BST); Finished Width = 30 Ft. ` ; --._._.._....------.-_.------.- -..-.----.._..----.._._..--.-.-.- --.- ---.-.F.---+�.
-f.
s €Total Project Cost ----$600 000 �---...--�-- ---_.. -��---_.:..---- TOTAL_S_.-------------.._._ _.�. �P---- 540__.._.. 60 __^_600 ._.._..�.. +--600+..-�-�-�- - ----
PE 75 75 75;
s MARTIN RD NW (Project not funde�; RW
O$ ': Rd. No.: 30400 - Adams Rd to H-NW ' 03 CN 750 150 900 900;
41 09 P 5.13 P,T
; From: MP 7.32 To: MP 12_45
; ; Grade, Drain, SurF. (BST), Br. Repl.; Finished Width = 24 Ft. ; : : € -,---.----...---._.._..._...______._.—..----..__��_.�__._._....--.-.-.-.-- -...---_.j__._.._;—�_._+.—.._.._.
..
;._� Total ProiectCost� $97 ,5 000 .-..----- --.-.; ; TOTALS__---.._..---..._..._.___ �...._.�P .._.. 750__ 225..._.___975 __ ? __�__ 975y- -�—
TOTALS
Report Date: July 25, 2006
6.57
ERR 3370 515 3885 3885
NCRegion H&LP; TIB; CRAB; RTPO; Planning; PUD; Irr. Dists; Tel. Cos.
v. 5.6 - Supersedes prev. editio