Loading...
HomeMy WebLinkAboutResolution 09-111-CCBOARD OF COUNTY COMMISSIONERS Grant County, Washington IN THE MATTER. OF ADOPTING THE 2010 ANNUAL ROAD PROGRAM R�SOLUTION NO. 09 -' � I -CC WHEREAS, pursuant to the requirements of R.C.W. 36.40.070, Grant County did prepare a 2010 Annual Road Construction Program, and a Comprehensive Road Program for the ensuing six years of 2010 - 2015, and WHEREAS, in accordance with W.A.C. 136.16 an environmental assessment was made on all work within the Annual Program, and WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearing was held and included the 2010 Annual Road Program, and WHEREAS, all comments and/or objections were heard and evaluated, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington that the 2010 Annual Road Construction Program attached hereto is hereby adopted. EFFECTIVE DATE: January 1, 2010 DATED this � day of �%�1�' , 2009. Yeay Nay Abstain � ❑ ❑ r� ❑ ❑ BOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON I �. Cindy C r er, Chair Richard Stevens, Vice Chair ❑ � Carolann Swartz, Member ANNUAL CONSTRUCTION PROGRAM FOR 2010 rora� $'s WAC 136-16 AGENCY ACTION: couN�v» GRANT (A) TOTAL CONSTRUCTION PROGRAM - columns (14)+(15) $2,897,676 DATE RECOMMENDED PROG. SUBMITTED _ ____ (B) PUBLISHED COUNTY FORCES LIMIT (see instructions) $1,198,701 _ DATE OF ENVIRONMENTAL ASSESSMENT 7/21/2009 _ (C) TOTAL COUNTY FORCES CONST PROGRAM - column (15) $912,000 DATE OF FINAL ADOPTION -- _ ORDINANCE/RESOLUTION NO. 2009 - - CC ** Line (C) must be smaller than Line (B) ** DATE OF AMENDMENT iO (2) _ i3 � - - O ,��_- i�) i$) i9� -(10) (11) 12 E S T I M A T E D E X P E N_ - 15 16 _ _ 4 �5) �6) - - - - �� DITURES- �� � �_ � � F� SOURCES OF FUNDS DOLLARS m ROAD/PROJECT NAME �� Z p w w � � p Z O w O cNi� ' O �� COUN� OTHER FUNDS • RIGHT CONSTRUCTION ROAD AND LOCATION Z >- a w L O G a J ' U v Y O w FUNDS � CONST. OF � GRAND W cO Q~ NO. (Include brief termini description � O � N AMOUNT PROGRAM ENGRING WAY COUNTY TOTAL , F- � or MP'S; Bridge #) (Miles) � W Q $1,234,567 $1,234,567 SOURCE 595.10 595.20 CONTRACT FORCES ALL 595. W1,234,567 $1,234,567 $1 234,557 51,234,557 I 01 2 42900 4-NE RD. (K-NE to L-NE) 1.00 08 ABC E 57,000 423,000 RAP 20,000 10,000 450,000 480,000 MP2.01 toMP3.01 I Grade, Drain, SurFace (HMA); Finished Width = 40 ft. I 02 3 20520 (2010 Gravel to BST Program) , 10.5-SE RD. (E-SE to F.5-SE) MP3.15toMP4.55 Grade, Drain, Surface (BST); Finished Width = 26 ft. 03 4 16870 (2010 Gravel to BST Program) K-NW/SW RD. (S Frontage to 1.5 miles S of S Frontage) MP 0.00 to MP 1.50 � Grade, Drain, Surface (BST); Finished Width = 26 ft. I 04 5 (2010 Gravel to BST Program) ROYAL CAMP STREETS I, 20530 Royal Camp (1 st to End) MP 0.40 to MP 0.55 20600 Linden St (1 st to 2nd) MP 0.00 to MP 0.15 , 20620 2nd Ave (Christensen to Royal Camp) MP 0.00 to MP 0.32 'i Grade, Drain, Surface (BST); Finished Width = 26 ft. �I 05 24 91030 DODSON RD (3-NW to 7-NW) MP 17.67 to MP 21.76 HMA Overlay (2"); Finished Width = 34 ft. � 06 1 95037 R-NE RD., BRIDGE #160 &#161 (Wilson Cr to 26.3-NE) MP2.99toMP6.21 Grade, Drain, Surface (BST); Finished Width = 28 ft. 07 17 95037 R-NE RD. (26.3-NE to 27-NE) '� I MP 6.21 to MP 6.90 I Grade, Drain, Surface (BST); Finished Width = 28 ft. 1.40 09 ABC E 1.50 09 ABC E 0.62 09 ABC E 4.09 07 D E 3.21 07 ABCI E 0.69 07 ABCI E 390,000 426,000 176, 000 171,676 1,100,000 STPR 3,000 27,000 RAP (PE only)I (PE only) 8, 000 (PE only)I (PE only) 10,000 11, 000 6, 000 24,000 30,000 8, 000 288,000 92,000 390,000 415,000 426,000 1,247,676 170,000 176,000 1,271,676 30,000 8.000 CRAB FORM #3, REVISED 06/09 1 of 4 Annual_2010 � � � "' ROAD/PROJECT NAME m � � o °z ROAD AND LOCATION z >- a W � LOG w `� ¢~ No. (Include brief termini description ~ � or MP's; Bridge #) i I 08 7 Various MISCEL�ANEOUS PROJECTS "Including Cost Share Projects I 09 8 NEW NEVA LAKE RD. (SR 28 to Landfill East Gate) , MP 0.80 to MP 1.50 Grade, Drain, SurFace (HMA - 4", two lifts); Fin Wid = 34 ft. �I 10 9 94000 (Safety Project) � 3-NE RD. (Vicinity of T-NE) MP9.71toMP10.09 I Grade, Drain, Surface (BST); Finished Width = 34 ft. � 11 10 22360 6-SE RD. (SR 17 to U-SE) , 25500 MP 0.00/0.00 to MP 1.81/2.00 Grade, Drain, Surface (BST); Finished Width = 28 ft. II 12 24 91030 DODSON RD (N Frontage to 3-NW) �, MP 15.88 to MP 17.67 HMA Overlay (2"); Finished Width = 34 ft. i5) �6) ��) i$) �9) I i10) I (11) 12 �= J � �, a F SOURCES OF FUNDS W� Q w Zz w � O Z O� O �� � COUNTY OTHER FUNDS � a J � g V O W FUNDS CONST. � U � � � AMOUNT PROGRAM ENGRING (Miles) � LL � W a $1,234,567 $1,234,567 SOURCE 595.10 $1,234.567 ' --- 09 ABC E 250,000I 15,000 0.70 08 ABD I 12,000 12,000 (PE only) 0.38 07 ABC E 1,000 3,000 STPR (PE only)I (PE only) 3.81 08 ABC E 15,000 45,000 RAP (PE,RW only)I (PE,RW only) 1.79 07 D E 1,620 10,380 STPR (PE only)I (PE only) ESTIMATED EXPENDITURES- DOLLARS RIGHT CONSTRUCTION OF WAY I COUNTY 595.20 CONTRACT FORCES St234.567 �1,234 567 51.234,567 � 235.000 4,000 50,000 10,000 12,000 GRAND TOTAL ALL 595. 250, 000 12,000 4,000 60,OOOI 12,000 CRAB FORM #3, REVISED 06/09 2 of 4 Annual_2010 0 � �w m � � � Z ROAD � z } a W LOG w �¢~ NO. O I � (4) (5) (6) (7) (8) (9) (10) (11) 12 13 14 15 I� ESTIMATED EXPENDITURES- �_ � � F F SOURCES OF FUNDS DOLLARS ROAD/PROJECT NAME i'� z p z w � W i -- AND LOCATION � z ��' O �� COUNTY OTHER FUNDS • RIGHT � CONSTRUCTION ' a-' Z v' Y � W FUNDS � CONST. ' OF _ (Include brief termini description !� � �� AMOUNT PROGRAM ENGRING i waY COUNTY or MP�S; B�Idg2 #) (MileS) LL � W a $1,234,567 `$1,234,567 SOURCE 595.10 595.20 CONTRACT FORCES � i 51,234,567 51,234,557 $1.234.567 I St234,567 GRAND TOTAL ALL 595. CRAB FORM #3, REVISED 06/09 3 of 4 Annual_2010 cl�— �2� _ �3� _ � �w � � � o Z ROAD Z � a W LOG w `�Q�= NO. F � �4� - i5) �6) ' __ i�) _ _ _ �$) �9) I i10) (11) 12 �= J � a F SOURCES OF FUNDS ROAD/PROJECT NAME W~ ¢ w z w AND LOCATION O Z O� O '�� COUNTY OTHER FUNDS � a J Z �' Y � W FUNDS CONST. (Include brief termini description LL p � N nMOUNT PROGRa,nn ENGRING or MP'S; Bridge #) (Miles) � W Q $1,234,567 I $1,234,567 ' SOURCE 595.10 �1,234 557 PAGE / PROGRAM TOTALS, CONSTRUCTION CRAB FORM #3, REVISED 06/09 4 of 4 ESTIMATED EXPENDITURES- DOLLARS RIGHT CONSTRUCTION OF GRAND WAY COUNTY TOTAL 595.20 CONTRACT FORCES ALL 595. �1,234.557 � $t234,567 I 51.234,567 Annual_2010