Loading...
HomeMy WebLinkAboutResolution 09-071-CC�OARD OF COUNTY COM�VIIS�IONERS Grant County, Washington IN THE MATTER OF AMENDING A � COMPREHENSIVE SIX YEAR Resolution No. ��� ���'��..�° TRANSPORTATIONIMPROVEMENT PROGRAM FOR THE YEARS 2009-2014 WHEREAS, pursuant to the requirements of Section 6, Chapter 83, Laws of Extraordinary Session oF the State of Washington, Grant County did prepare a Comprehensive Transportation Improvement Program for the ensuing six years; and WHEREAS, priority array of projects prepared in accordance with County Road Administration Board Standards of Good Practice (WAC 136-14) was made available and was consulted by the Board during the preparation of the Six Year Program; and WHEREAS, the Engineer's report with respect to deficient bridges was available to the Board during the preparation of the Six Year Program; and WHEREAS, an environmental pre-assessment of the Six Year Program indicated that the social, economic and aesthetic values would not be disturbed; and WHEREAS, pursuant further to said Law, the Board of County Commissioners, being the legislative body of the County, did prepare, revi�e and extend said Six Year Program and did hold a public hearing on said Comprehensive Plan at 2:00 P.M. at the Courthouse, Ephrata, Washington on the 22nd day of July, 200a. NOW, THEREFORE BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington, that the Comprehensive Six Year Road Program presented at the public hearing be amended as shown. EFFECTIVE DATE: p' �� , 2009 DATED this '�� Day of , 2009. �OARD OF COUIVTY COMMISSIONEFtS GRANT COl1NTY, WASkIINGTON Yea Nay Abstain L"J ❑ 0 � ❑ ❑ Richard Stevens, Vice-Ch ir � � I ��p�. arbara Vasquez � ❑ ❑ � Clerk of the Board �•''` Carolann Swartz, Member � �r' Washington State Depariment of Transportation �/� Agency: Grant Co. Co_ No.: 13 Co. Name: Grant Co. City No.: 0000 MPO/RTPO: NON/QUAD Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 7/22/2008 Adoption Date: 7/22/2008 Amend Date: 8/18l2009 Resolutian No.: Project ldentiftcation ProjecY Costs in Thousands of Doltars Federalfy Funded A PIN/Federal Aid No_ B. Bridge No. � r m m Fund Source Information �xpenditure Schedule Projects Only � � a� m�, �, � o � (Loca( Agency) o� o� C_ Projeci Title m m 3 � � t Federal Funding R/W c � a� D. StreeURoad Name or Number ° F v� ;g `—_T' a Phase Federal Federal State 4th Required � Z � a — m State Local Total Envir_ Date E. Beginning MP or Road - Ending MP or Road _ F- � o Start Fund Cost by Fund Funds Funds Funds �st 2nd 3rd Thti Type �MM�yy� F. Describe Work to be Done a(mm/dd/yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 '13 14 15 16 17 18 19 20 2'I PE 'I!1/2010 STP(R) 2 'I 3 07 27 03 S o.3S P Rw virzoio � I � ( CE 3-NE Road (Safety Projecf) � 2 T CN 6/'I@010 STP(R) 66 10 76 Yes 9400D - Vcintiy of T-NE from: 9.71 to: �Q.09 6/1/20�0 Grade, Drain, Surtace (HMA): Finished Width = 34 Ft Totals sa �2 ao l6 62 '°`RRA-6065(004) - 06 S PE 3/1Y2009 5 5 5 0.48 P CN 6/1/2009 ARRA- 29 33 62 62 CE Fairgraunds Path No 41690 - ML Water Tower to N End Fairgrounds from: 1 _50 to: 1.98 HMA Path, Fnished Wid:h = 8'. Totais 2s as s� s� 07 63 07 S 0.86 p PE 8/1/2009 3 3 3 Potato Hili Road OveAay T CN 9/�5/2009 STP{R) 268 42 310 3�0 CE No 21590 - End of HMA to Baseline East rom: 024 to: 1.'10 HMA Overlay (025), Fnished Width=40'. TOtBIS 268 45 313 313 Grand Totals for Grant Co. 365 95 460 380 v. �.7 - Supersedes previous editions Report Date= January 31, 2008 Page 1