Loading...
HomeMy WebLinkAboutResolution 09-025-CCBOARD OF COUNTY COMMISSIONERS Grant County, Washington IN THE MATTER OF INITIATING COUNTY ROAD PROJECT DESIGNATED AS CRP NO. 09-03 Resolution No. � f w d�5 ���' WHEREAS, IT IS HEREBY RESOLVED THAT Road L-NE, State Road Log No. 40050 from milepost 0.00 to milepost 2.01 be improved as follows: � This project will overlay L-NE from Kittleson to 3-NE with a 0.25' thickness Hot Mix Asphalt overlay in two lifts. This project is 2.01 miles long. This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070) NOW, THEREFORE, BE IT FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE Engineering Right of Way Acquisition PROGRAM SOURCE Local TOTAL (Not Subject to 36.77.060) Construction Construction 70TAL Federal ARRA Local AMOUNT OF APPROPIATION 15 000 .� 15 000 487 009 57 991 560 000 (Check appropriate box) ❑ This project is included in the officially adopted Annual Road Program as item No. _ � This project is hereby made a part of the officially adopted Annual Road Program in accordance with RCW 36,81.130 BE IT FURTHER RESOLVED: (Check appropriate box) ►/ U The construction is to be accomplished by contract in accordance with RCW 36.81.130 The construction is to be accomplished by county forces in accordance with RCW 36J7.060 and WAC 136-18 ADOPTED this ID Day of ./`�`�`���"'" , 2009. BOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON Yea Nay Abstain � ❑ ❑ � ❑ ❑ Lldd ❑ ❑ ATTEST: � ' UC � `B'� bara Vasquez Clerk of the Board ��� Carolann Swartz, Member