HomeMy WebLinkAboutResolution 09-023-CCBOARD OF COUNTY COMMISSIONERS
Grant County, Washington
IN THE MATTER OF AMENDING A ,�''�/)
COMPREHENSIVE SIX YEAR ResolutlOn NO. (/`/��� F�G
TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE YEARS 2009-2014
WHEREAS, pursuant to the requirements of Section 6, Chapter 83, Laws of Extraordinary
Session of the State of Washington, Grant County did prepare a Comprehensive Transportation
Improvement Program for the ensuing six years; and
WHEREAS, priority array of projects prepared in accordance with County Road Administration
Board Standards of Good Practice (WAC 136-14) was made available and was consulted by the Board
during the preparation of the Six Year Program; and
WHEREAS, the Engineer's report with respect to deficient bridges was available to the Board
during the preparation of the Six Year Program; and
WHEREAS, an environmental pre-assessment of the Six Year Program indicated that the social,
economic and aesthetic values would not be disturbed; and
WHEREAS, pursuant further to said Law, the Board of County Commissioners, being the
legislative body of the County, did prepare, revise and extend said Six Year Program and did hold a
public hearing on said Comprehensive Plan at 2:00 P.M. at the Courthouse, Ephrata, Washington on the
22nd day of JUIy, 2008.
NOW, THEREFORE BE IT RESOLVED by the Board of County Commissioners of Grant County,
Washington, that the Comprehensive Six Year Road Program presented at the public hearing be
amended as shown.
EFFECTIVE DATE
/ ��
DATED this / �
ATTEST:
�
� � m-r�tOv�..
Barbara Vasquez
%'��lerk of the Board
�
�1�� � � , 2009
Day of 1�' (�'�'��� 2009.
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
Yea Nay Abstain
� ❑ ❑
0� ❑ ❑
C� ❑ ❑
Richard Stevens, Vice-Chair
Carolann Swartz, Member
—
� WashingtonState DepartrreeniofTransportation Six Year Transportation Improverr�en� Prograrn
�ss
Agency: GrantCo_ FiOfTI 2009 t0 20�4
Co. No.: 13 Co. Name: Grant Co_ Nearing Date: 7/22/2008 Adoption Date: 7/22/2008
City No.: pp00 MPO/RTPO: NON/QUAD Amend Date: 3/17/2009 Resolution No.:
ProjeCt identification Project Costs in Thousands of Doilars Federally Funded
� �� A_ PINlFederal Aid No. B. Bridge No_ m^ � m � Fund Source Information Expendi�ure SCh@dUle Projects Only
N n r�
o� 'o � C. Project Title m m � � � � Federal Funding ( oCa genCy �
� � a z D. Streef/Road Name or Number Q� � ;� � a Phase Federal Federal State 4th Required
"' E. Beginning MP or Road - Ending MP or Road � � � o Start Fund Cost by Fund State Local Total �sf 2nd 3rd Thru Envir. Date
F. Describe Work to ba Done a(mm/dd/yyy» Code Phase Code Funds Funds Funds 6th T�e �MMNY�
'I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2009 ARRA- 30 10 40 45
07 4 09 S � �2 P CN 6/If2009 ARRA- 720 720 '140 580 CE
Bridge #244, 3-NE T No
94000 - O-NE to O-NE
from: 4.91 to: 5.03
Bnd9e Repfacement, �60.5 feet long single span, 3625 feetwide deck, 8
bulb "T" griders. Finished Width = 34'. Total Project Cost 5760,000
07 5
L-NE Road Overfay
40050 - 3-NE to Kittleson
from: 0.00 to: 2_01
HMA Oveday (025'), Pinished Width = 36'. Total Project Cost 5560,000
�6 62
Fairgrounds Path
41690 - ML Water Tower to N End Fairgrounds
from: t50 to: 1.98
HMA Path, Finished Width = 8'. Total Projec[ Cost 5'I00,000
07 S 2.01 P
T
06 S o.as P
I Totals
� PE 3/1/2009
� CN 5/'I/2009 ARRA-
Totals
PE 3/1/2009
CN 6/'I/2009 ARRA -
1 Totals
Grand Totals for Grant Co.
750
487
487
57
s�
10 760 185 580
5 5 5
68 555 555
73 560 560
5 5 5
38 95 95
43 100 '100
126 1,420 845 580
j CE
'I No
CE
No
RepoR Date: Jan!�ary 31, 2Q08 Pase'! v. 5.7 - Supersedes previous editions