HomeMy WebLinkAboutResolution 08-058-CCBOARD OF COUNTY COMMISSIONERS �,4��T �°U�,�
Grant County, Washingfion
�.
�rAt� or�eiec�o
1N THE MATTER OF ADOPTING A
COMPRET-IENSIVE SIX YEAR RESOLUTION No. 2008- o��CC
TRANSPORTATION 1MPROVEMENT
PROGR�M FOR THE YE�1RS 2009-2014
WHEREAS, pursuant to the requirements of Section 6, Chapter 83, Laws oFExtraordinary
Session of the State of Washington, Grant County did prepare a Comprehensive Transportation Improvement
Prog7�am for the ensuing six years; and
WHEREAS, priority array of projects prepared in accordance with County Road
Administration Board Standards of Good Practice (WAC 136-14) was made available and was consulted by
the Board during the preparation of this Six Year Program; and
WHEREAS, the Engineer's report with respect to deiicient bridges was available to the Board
during the preparation of the Six Year Prograin; and
WHEREAS, an environmental pre-assessment of the Six Year Program indicated that the
social, economic and aesthetic values would not be disturbed; and
WHEREAS, pursuant further to said Law, the Board of County Cominissioners, being the
legislative body of the County, did prepare, revise and extend said Six Year Program and did hold a public
hearing on said Comprehensive Plan at 2:00 P.M. at the Courthouse, Ephrata, Washington on the 22"`� day of
July, 2008;
NOW, THEREFORE BE IT RESOLV�D by the Board of County Commissioners of Grant
County, Washington, that the Coinprehensive Six Year Road Prograin presented at the public hearing be
hereby adopted.
EFFECTIVE DATE: �� u-t� , 2008.
DATED this yeci day of ��I�, , 2008.
/
Yea ay
❑
C" ❑
A TEST:
U�' ❑
U�I'
1 rlc of the B ard
Abstain
❑
C
�
BOARD OF COUNTYCOMMISSIONERS
GRANT COUNTY, WASHINGTON
� -
Riclr�rd Stevens, Chair
Page 1 of 11
�ix Vear Transportafiion lrr�proveme�t Program
Frorn 2009 ta 2014
Agency_ Cseiint COUn�/
Co. No.: '13 Co. Name: Grar�t Couilty Hearing Date: July 22, 2008 Adoption Date:
City No. --- MPO/RTPO: QU1dC0 Amend Date: Resolution No.: 08- -CC
Project Identification Project Costs in Thousands of Doliars Federally Funded
Expenditure Schedule (Local projects Only
� � � � Fund Source Information Agency)
A. Federal Aid No_ B. Bridge No. �, a, � �,
o ��`—T' � C. Projecf Title � Q � � v a Federal Fundin �
`� -°— � ° a cn � ---''� � Phase Federal Federa! State Envir Required
� V a z D. StreetiRoad Name of Number Q�— = 1st 2nd 3rd 4th t6th Type Date
u- £ � � o Start Fund Cost by Fund State Local Total
E. Beginning MP or road - Ending MP or road a (m�»`)
F. Describe Work to be Done I mm/dd/ Code Phase Source Funds Funds Funds
� 2 3 I 4! 5 6 7 8 9 10 11 12 13 14 15 16 17, 18 19 20 21
STP(E)-2013 FedeCdE Funds @ 100% p.E_ 03/01/08 15 15 15� i
LARSON TRAIL (Grape Dr.) � 05/01/a8 ! ' ;
01 S 1_80 P,T CE No
07 & � Rd. No.: 42350 - SR 97 to Loring Dr_ NE �2 � � �
�$ From: MP 6.00 To: MP 1.80 CON 08/01/08 192 PATHS & 43 235 235;
Grade Drain Surface Cona/HMA � Finished Width = 12 ft. TOTALS STP E 192 TRAILS 58 250 250:
BROS-2013 Bridge No.: 08053200 p.E. 03/01/08 41 41 41 ;
BRIDGE #118, F NE 900% Federal Funds � 05/01/OS ; j i
09 2 Rd. No.: 5091 D- 1.17 mi N of SR 28 09 S 0.22 P,T i CE No
From: MP D.51 To: MP 0.54 CON �1/01/09 43g 439 438?
i Bridge Replacement (1-span 160'}; Finished Width = 24 Ft TOTALS BROS 4gp 480 480 ; ; ;
P E 80 9 89 89� i i
D-SE RD (Funded in 2009) R/W 10 10 10;
O8 3 Rd. No.: 20670 -12-SE to SR 26 03 S 5_11 P,T ; i
From: MP 0.00 To: MP 5.11 CON 926 103 1029 1029!
Grade Drain SurfaCe BS - Finished Width = 34 Ft. TOTALS RAP 10D6 122 1128 1128'
P E 35 35 35;
BRfDGE #244, 3 NE � � � �
07 4 09 S 0.12 P,T ; GE Na
Rd. No.: 94000 - O NE to O NE
From_ MP 4.91 To: MP 5_03 CON 350 350 350;
Rail Widenin Brid e Re lacement; Finished Widfh = 34 Ft. TOTALS 385 385 385; ; ;
P.E. 03/01/09 13 2 15 15� � �
STP(R)-P137 R/N( 05/01i09
L-NE RD_ ; i i CE
07 5 Rd. No.: 40050 - 3-NE to Kittleson 07 S 2.01 P,T CON NO
; i i
From: MP 0.00 To: MP 2.01 CON 08/01/09 5q5 85 630 630;
HMA Overla 4" � Finished Width = 36 Ft STP R 558 87 645 645?
(2009 Gravel fo BST Programj P.E. 11 11 11 ;
M-NE RD Priority 04 � � � '
08 6 Rd. No. 94030 - 10-NE to 12-NE 03 S 2.08 P,T ; i
From: MP 6.16 To: MP 8.24 CON Gravei 353 353 353?
Grade Drain Surface BST � Finished Width = 28 Ft. T07ALS to BST 364 364 364�
., c c c�...o.�oao� �.ov criainn
Report Date: July 25, 2006 Dist: 2 HB�LP; TIB; CRAB; RTPO; Planning; PW; trr. uisis; i ei. �os.
Page 2 of 11
Six Vear Transporta�ion fmprovement Program
From 2009 to 2014
Agency: Grd11t COUf1'L'j/
co. No.: 13 Co. Name: Grdtlt COUfity Hearing Date: July 22, 2008 Adoption Date:
City No. --- MPO/RTPO: QU8fIC0 Amend Date: Resolution No.: 08- -CC
Project Identification Project Costs in Thousands of Dollars Federally Funded
Expenditure Schedule (Local projects ONy
� � � � Fund Source Information Agency)
A. Federal Aid No. B. Bridge No. u, � a, � �,
o n�� C. Project Titie � Q � � cj a Federai Fundin �
° �a � � Phase Federal Federal State Envir Required
� � a Z D. StreeURoad Name of Number QF � - 4th thru T e Date
LL � � � o Start Fund Cost by Fund State Local Total 1st 2nd 3rd � yP
E. Beginning MP or road - Ending MP or road a (mm/yy}
F. Describe Work to be Done mm/dd! Code Phase Source Funds Funds Funds
1 � 2 3 I 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
(2009GraveltoBSTProgram) P.E. 15 15 15i i
13-NW RD Priorify 05 �
09 � Rd_ No. 32740 - Monument Hili to Adams 03 S 3.02 P,T 1 i i
From: MP 0.00 To: MP 3.02 CON Grdvel 438 438 438;
Grade Drain Surface 6S � Finished Width = 26 Ft. TOTALS to BST 453 453 453'
(2009 Gravelto BST ProgramJ P.E. 10 10 10;
O-SW RD Priorify 06 � � � �
�9 $ Rd. No. 11910 - 9-SW to 19-SW 03 S 2.03 P,T ;
From: MP 0.00 To: MP 2.03 CON Gravei 295 295 295;
Grade Drain Surtace S� Finished Width = 26 Fi. TOTALS to BST 305 305 305; ; '•
(2009 Grave! to BST Program] P.E. 4 4 4 � � �
MAPLE DR VICINTY STREETS Priorify 06a �
09 9' Rd. No. 42420/42401/42690/42710 - Butler,Stewart,Robin,Dough 03 S 0.37 P,T i i i
From: MP 0.00/0/00/0/00/0.00 To: MP 0.09/0.18/0_04J0.06 CON Gravei 44 44 44?
Grade Drain Surface BST - Finished Width = 24 Ft. TOTALS to BST 48 48 48;
Project may be affected by USBR water delivery project P.E. 47 47 47;
STRATFORD RD. NE REALIGNMENT � ' � '
07 �� Rd. No.: 94025 - Rd. 2� NE to SR 28 03 S 4.46 ;
From: MP 1724 To: MP 21.70 CON 669 669 669?
Grade Drain Surtace BST � Finished Width = 30 Ft P,T TOTALS 716 716 716; ! ;
(Paths & Trails Fund] P. E. 5 5 5� � ;
COMMUNITY ST. PATH (Sunland) �
Og � � Rd. No.: 31160 - River Dr to Chukar PI (Northside) �1 S 0_13 ; i i
From: MP 0.00 To: MP 0.13 CON PATHS E 25 25 25�
Grade Drain Surface HMA - 3" ' Finished Width = 12' P T TOTALS TRAILS 30 30 30?
Moses Pointe Plat P-E. 10 10 10 ;
4-NE RD & WESTSNORE REALIGNMENT/CHANNELIZATION p2 � ' ' �
p7 �2 Rd. No.: 93004/40950 - Intersection realignment 04 S 0.25 P,T Developer ;
12 CON Miti ation 80 80 80;
At: MP 9.45/3.19 '
Grade Drain Surf. HMA 4"- finro lifts � Fin. Wid. = 40-52 Ft. T07ALS Funds g� 9� 90' '
Report Date: July 25, 2006
Dist: 2 H&LP; T1B; CRAB; RTPO; Pianning; PUD; irc Disfs; Tef_ Cos. v. 5.6 - Supersedes prev. editior
Page 3 ot 79
Agency: GI"dR� COU19iy
co. No.: 13 co. tvame: Grant Countv
Six Year Transportation Improveme�t Program
IF�om 2009 to 2014
�eanng DaYe: July 22, 2008 Adoption �ate:
City No. - - - MPO/RTPO: QU3CIC0
Amend Date: Resolution No._ 08- -CC
Project idenfifiCation Projeet Costs in Thousands of Dollars
� A. Federal Aid No. B. Bridge No.
� � �' Ex enditure Schedule F P orally Funded
o y w`m a� a� a� Fund Source Information p (Local
-� � o� C. Proj�ct Titte �� � � o �a Agency) Jects Only
� � � > Q � � U a Federai Fundin
� a` Z D. Street/Road Name of Number °>. � � a �
LL g �� � ? o Phase Federal Federal State Envir Required
E. Beginning MP or road - Endin MP or road — Siart Fund Cost by Fund State Loca1 Totat 1st 2nd 3rd 4th t6 fi Type Date
F. Describe Work to be Done a (mrrUyy)
mm/dd/ Code Phase Source Funds Funds Funds
1 I 2 3 4 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 99 20 21
P' E' 10 10 10 � �
NEPPEL RD NE EXTENSION �
�$ 13 Rd. No.: NEWI46350 - McConihe to 7.5-NE �� P 1.14 P,T
From: MP 0_00 To: MP 9.74 CON � � '
300 300 300�
Grade Drain Surtace BS � Finished Width = 34 Ft. TOTALS WSDOT '
300 10 310 3i0�
P"E' 27 3 30 30'
R-NE RD, BR#160 ¡. (Funded in 2010) � ; i '
07 �4 Rd. No.: 95037 - Wilson Creek to 26.3 NE 09 S 321 P,T ? � i
From: MP 2.99 To: MP 6.20 CON 829 93 922 922'
Grade Drain Surface BST � Finished Width = 28 Ft. TOTALS RAP 856 96 952 952�
P.E,
07 MISCELLANEOUS PROJEC i S �
90 90 15 15 15 45
�$ 15 �INCLUDING COST SHARE PROJECTS 03 S --- P,T
09 CON
1410 1410 235 235 235 705
TOTALS 1500 1500 250I 250 250 750
P.E. 12 12 12;
NEVA LAKE RD. NW Phase 2 � ' ; ;
�8 16 Rd. No.; NEW - SR 28 to Landfill East Gate D1 S 0.70 P,T ! i j
From: MP 0.80 To: MP 1.50 CON SOLID 345 345 34g�
Grade Drain Surtace MA 4" - two Iifts � Fin. Wid_ = 34 Ft TALS WASTE 357 357 357:
P.E. 18 2 20 ' 20�
4-NE RD. (Funded in 2090) � ' !
10 10 10;
0& �� Rd. No.: 42900 - K NE to L NE 03 S 9.00 P,T
From: MP 2.01 To: MP 3.01 CON � � i
405 45 450 ` 450;
Grade Drain SurFace BS � Finished Width = 40 Ft. TOTALS RAP 423 57 480 480 �
P.E. 25 25 25: '
GRAPE DR. NE FFC changes needed �� � E ; j
07 18 20 20 i 20� �
Rd. No.: 42350/NEW - SR 17 to Loring Dr. NE �� P 1.00 P,T
�$ From: MP 0.00 To: MP 1.00 12 -
CON 300 300 300:
Grade Drain Surf HMA 4"-two lifts , C&G S/W; Fin.Wid.= 34 ft. TOTALS 345 345 �
Report Date: July 25, 2006
345!
���•• ���� ,��, ..rv,o, rc � rv; rianning; rw; Irr. DistS; TeL Cos.
v. 5.6 - Supersedes prev, edition
Page 4 of 11
Six Year Transportation lrnprovemen� Program
From 2009 to 20'!4
Agency: GYdflt �OUOI'h/
Co. No.: �3 co_ r�arr,e: Grant County Hearing Date: July 22, 2008 Adoption Date:
City No. --- MPO/RTPO: Q4laC�CO Amend Date: Resolution No.: 08- -CC
Project Costs in Thousands of Dollars Federally Funded
Project Identification F�cpenditure Schedule (Local projects Only
� � � � Fund Source information Agency)
A. Federal Aid No. B. Bridge No. a� � a, -6 �,
� �, � � � � � � ° � Federal Fundin �
o �.o � C. Project Title o Q � � v a
� �a � � Phase Federal Federal State Envir Required
� v a` Z D. Street/Road Name of Number Q� = 1st 2nd 3rd 4th th�h Type Date
� � � o Start Fund Cost by Fund State Local Total �m�yy�
E. Beginning MP or road - Ending MP or road a
F. Describe Work to be �one I mmldd/ Code Phase Source Funds Funds Funds
1 i 2 � 3 4 5 4 6 I 7 8 9 90 11 12 13 14 15 16 17, 18 19 20 21
STP(R)-H133
P.E. 8 1 9 � 9i i
POTATO HILL RD. NE �
07 P 0.83 P,T ! ' � CE �o
p7 19 Rd. No.: 21590 - End of HMA to Baseline East � ' �
COM 212 33 245 245�
From: MP 025 To: MP 1.08 '
TOTALS STP R 220 34 254 254 �
HMA Overla 4" - two lifts ' Finished Width = 40 Ft. �
Ethanolplantlocationmaychange P.E. 25 25 25!
O-NE RD (Ethanol Plant mitigation) � � ; �
p7 20 Rd. No.: 43200 - N Frontage to 3-NE 03 P 2.53 P,T Developer ;
CON Miti ation 500 500 500;
From: MP 0.10 To: MP 2.63 '
TOTALS Funds 525 525 525�
Grade Drain Surface BST � Finished Width = 36 Ft. ; � ;
Efhanol plant /ocation may change P_E. 25 25 i 25 � �
O-NE RD (Ethanol Plant mitigation) � i ; ;
p7 21 Rd. No.: 43200 - N Frontage to 3-NE 07 P 2.53 P,T Developer � i i
From: MP 0.10 To: MP 2.63 CON Miti ation 600 600 600;
NMA Overla 4" - two lifts � Finished Width = 34 Ft. TOTALS Funds 625 625 625;
p E �g 2 15 15;
USERD � � ; �
07 P 3.28 P,T CE No
07 � Rd. No.: 92035 - Warden City Limits to Adams County °
CON 410 65 475 475�
From: MP 0.0� To: MP 3.28 '
TO7ALS STP R 423 67 490 490;
HMA Overla 2" ; Finished Widfh = 32 Ft ; ; i
j2090 Gravel to BST ProgramJ P.E. 10 10 � 10; ;
10.5-SE RD Priority 07 �
pg 23 Rd. No. 20520 - E-SE to F.5-SE 03 P 1.40 P,T i ; �
CON Gravel 200 200 Zo� �
From: MP 3.15 To: MP 4.55 �
Grade Drain Surface BS � Finished Width = 26 Ft. TOTALS to BST 210 210 210 ;
(2090 Gravel to BST Program] P. E. 11 11 11 ;
K-NW/SW RD Priority 08 � ' � �
pg 24 Rd. No. 16870 03 P 1.50 P,T ;
CON Gravel 214 214 214�
From: MP 0.00 To: MP 1.50 ; ;
Grade Drain SurfaCe BS ' Finished Width = 26 Ft. TOTALS io BST 225 225 225; •
Report Date: July 25, 2006
Dist: 2 H&LP; TIB; CRAB; RTPO; Planning; PUD; Irr. Dists; Tel. Cos. v. 5.6 - Supersedes prev. edition
Page 5 of 11
Si� Year Transportation Improvemeu�t P�-ogram
Frorn 2009 to 2014
Agency. Grant County
Co. No.: 73 Go. Name: GI'atlt COUllfj/ Hearing Date: July 22, 2008 Adoption Date:
City No. --- MPO/RTPO: QU3dC0 Amend Date: Resolution No.: 08- -CC
Projecf Identification Project Costs in Thousands of Dollars Federaily Funded
F�cpenditure Schedule (Local projects Only
� � � Fund Source Information qgency)
A. Federal Aid No_ B. Bridge No. u�i a, -6 u,
c y Y u, ��' � u�i ° t Federal Fundin �
,� � o� C. Project Title o T � � v a
� � = � Phase Federal Federal State Envir Required
LL v a` Z D. StreetlRoad Name of Number n.r = 1st 2nd 3rd 4th th�h Type Date
� � � o Siar Fund Cost by Fund State Local Total �m���
E. Beginning MP or road - Ending MP or road a
F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds
� 2 3 I A I 5 I 6 7 8 9 10 11 12 13 14 15 16 17, 18' 19 20 21
[2090 Gravel to BST Program] P.E. 14 14 i 14j i
DRY COULEE RD Priority 90 �
pg 25 Rd. No. 50850 - SR28 to 25-NE 03 P 2.93 P,T i j �
CON Grav2l 426 426 426 �
From: MP 0.06 To: MP 2_99 �
TOTALS to BST 440 440 44� �
Grade Drain Surtace BST � Finished Width = 26 Ft. �
[2090 Gravel to BST Prograrn] P.E. 6 6 6;
ROYAL CAMP STREETS Pr!o��Y �� � � � I
09 26 Rd. No. 20530/20600/20620 - RoyalCamp/LindeN2nd Av 03 P 0.62 P,T ;
From: MP 0.40/0.00/0.00 To: MP 0_55/0.15/0.32 CON Gravei 86 86 86;
TOTALS to BST 92 92 92'
Grade Drain SurFace BS - Finished Width = 26 Ft. ; � ;
P.E. 8 8 i $i i
3-NE RD (Safety ProjectJ � ; ;
03 P 1.69 P,T i i
08 27 Rd. No. 94000 - vcintiy of T-NE 12
CON �2 �2 �2�
From: MP 9.71 To: MP 10.09 '
TOTALS $� $� $� �
Grade Drain Surface BS � Finished Width = 34 Ft. �
P.E. 21 3 24 24;
ADAMS RD. SW � � � �
07 P 8.23 P,T ; CE No
07 2$ Rd. No.: 91017 - Frenchman Hil{s to l-90 '
CON 9211 189 1400 � 1400;
From: MP 628 To_ MP 14.51 � ;
HMA Overla 2" ' Finished Width = 34 Ft. TO7ALS STP R 1232 192 1424 ; 1424? :
p.E. g 1 10 � i 10�
STP(R)-P137 ; ; ;
I L-NE RD. � ; i :
07 P 1.51 P,T CON �E No
07 29 Rd. No.: 94005 - 3.5-NE to 5-NE ' � '
From: MP 0.50 To: MP 2.01 CON 400 62 462 462:
HMA Overla 4" ' Finished Width = 36 Ft.
TOTAL3 STP R 409 63 472 4�2;
P.E. 4 4 4:
MAPLE DR NE � � � �
pg 30 Rd. No_ 42600 - StratFord NE to Alma NE 03 P 0.36 P,T ;
From: MP 0.39 To: MP 0.75
CON 50 50 50!
3R Draina e Surface BS ' Finished Width = 28 Ft_
TOTALS 54 54 �4'
v � � - Suoersedes orev. edition
Report Date: July 25, 2006 Dist: 2 H&LP; TIB; CRAB; R I NU; riannmg; ruu; u�. vww, � ��. ..��.
Page 6 of 11
Si�c Year Transporta#ion Irnprover�e�t Program
Frorn 2009 to 2014
Agency: GI'all� �iOURty
Co. No.: 13 Co. Name: C�sflElf COUtltj( Hearing Date: July 22, 2008 Adoption Date:
Gity No. --- MPO/RTPO: QUadCO Amend Date: Resolution No.: 08- -CC
Project Identification Project Costs in Thousands of Dollars Federally Funded
6cpenditure Schedule (Local projeets OMy
� � � Fund Source Information qgency)
A. Federal Ald No. B. Bridge No, u� a, a �,
� �, � a� � � = u�i �j � Federal Fundn �
s N•- s C. Project Title
m `o_
� o n ;g � a Envir Required
3 v a` Z D. StreeURoad Name of Number Q� � o � � Phase Federal Federal State 4th thru T e Date
� � � 1st 2nd 3rd 6th YP
E. Beginning MP or road - Ending MP or road — F' � � Start Fund Cost by Fund State Local Total �mm/»,�
a
F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds
1 � 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18, 19 20 21
� STP(U)-6065
P.E. 22 3 25 � ; 25;
VALLEY RD. NE & AIRWAY DR. NE � � ' i
05 P 2.21 P,T CE No
16 31 Rd. No.: 41690 - Paxson (ML City Limits) to SR 17 p7 � � �
CON 605 95 700 7Q0�
From: MP 1.00 To: MP 3.21 �
Minor Widenin HMA Overla 2"-4" ' Fin. Width = 50-60 Ft. TOTALS STP U 627 98 725 725 �
i 43 7 5p 50;
STP(R)-P 135 P' E' �
STRATFORD RD. NE � � � �
07 P 4.87 P,T ; CE No
07 32 Rd. No.: 94025 - Tyndall to 12 NE �
CON 1211 189 1400 � 9400�
From: MP 4.36 To: MP 9.23 �
HMA Overla 4" - iwo lifts � Finished Width = 30 Ft TOTALS STP R 1254 196 145� � 1450;
` P� 45 5 50 � i 50�
6-SE RD. (Funded in 2099) FtlW 10 10 10;
08 33 Rd. No.: 2236�/2550� - SR 17 to U SE 03 S 3_81 P,T i i ;
From: MP 0_00/0.00 To: MP 1.81/2.00 CON �8� $� $6$ $68.
Grade Drain Surtace BS ' Finished Width = 28 Ft. TOTALS RAP 826 102 928 92$ °
STP(R)-E'f31 P.E. 17 3 20 2�?
DODSON RD. NW � � � �
07 P 6.48 P,T : CE No
07 � Rd. No.: 91030 - N. Frontage Rd. to 7-NW '
From: MP 15.88 To: MP 21.76 CON 843 132 975 975'
HMA Overla 2" ' Finished Width = 34 Ft TOTALS STP R 860 135 995 995;
(Under prospectus review) P.E. 79 9 88 � ; $$;
11-SW RD. (P�oject not funded) � 5 5 5�
08 35 Rd. No.: 91020 - Beverly-Burke Rd. to Adams Rd. 03 P 5.01 P,T i i i
From: MP 0.00 To: MP 5.01 CON 1240 138 1378 ; 1378'•
Grade Drain Surface BS � Finished Width = 34 Ft. T07ALS RAP 1319 152 1471 ; 1471 �
(Under prospectus review) P.E. 79 9 88 ; $$
S-NW RD & BR#355 (Projectnotfunded) � ' • �
03 P 3.00 P,T
08 36 Rd. No.: 31550 - SR 28 to 7-NW 09
CON 1240 138 1378 1378
From: MP 0.99 To: MP 3.99 ;
Grade Drain Surface BST � Finished Width = 3A Ft.
TOTALS RAP 1319 147 1466 • 1466
Report Date: July 25, 2006
Dist: 2 H&LP; TIB; CRAB; RTPO; Planning; PUD; Irr. Dists; Tel. Cos. v. 5.6 - Supersedes prev. edition
Page 7 of 11
Six Year Transportation Irnproveme�t Program
Frorn 2009 to 2014
Agency: GPdtl� COUII#j/
co. No._ 13 Co. Name: GP3�It COUtI#y Hearing Date_ July 22, 2008 Adoption Date:
City No. --- MPO/RTPO: QUadCO Amend Date: Resolution No.: 08- -CC
Project Identificafion Project Costs in Thousands of Doliars Federally Funded
� � y Fund Source Information �penditure Schedule (Local projects Only
� A. Federal Aid No. B. Bridge No. �� � � N Agency)
� N w � � y � �
°— ��— -Q C_ Project Title a� �, 3 � p° � Federal Fundin
�V c6 O� > Q � J a R/W
3 v a` Z D. StreeURoad Name of Number Q� � � � � Phase Federai Federal State Envir Required
`L � � 0 1st 2nd 3rd 4th thru Type Date
E. Beginning MP or road - Ending MP or road � a Start Fund Cost by Fund State Local Total 6th (mm/yy)
F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds
1 2 3 � 4 5 I 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
(Under praspecfus review) P.E. 66 8 74 � � � 74
9-NV1/ RD & BR #325 (Project not funde� R/W '
03 ` ! �
08 37 Rd. No.: 93020 - SR 283 to Dodson �9 P 4.22 P,T i ; ;
From: MP 5.84 To: MP 10.06 CON 1044 116 1160 � 1160
Grade Drain Surface BS - Finished Width = 34 Ft TOTALS RAP 1110 124 1234 � 1234
(Under prospectus review) P. E. 76 9 85 85
20-NE RD. (Projectnotfunded) 03 � � � ,
i i i
08 38 Rd. No_: 94046 - Adrian Rd to Stratford Rd 05 P 4.88 P,T
From: MP 4.38 To: MP 9.26 CON 1208 134 1342 1342
Grade Drain SurFace BS ' Finished Width = 34 Ft. TOTALS RAP 1284 143 1427 1427
(Under praspectus review} P.E. 79 9 88 � � � 88
R-NE RD. Phase 4 (Project not funde� RlV1/
07 39 Rd. No.: 95037 - 36-NE TO SR 2 03 P 5.02 P,T ; ; ; CE No
From: MP 16.05 To: MP 21.07 CON 1242 138 1380 � 1380
Grade Drain Surtace BS � Finished Width = 28 Ft. TOTALS RAP 1321 147 1468 � 1468
NAT WASHINGTON BLVD Joint w/Ephrafa & developer P.E. 45 5 50 50
Rd_ No.: 37850/New/37750/New - SR 282 to SR 28 03 R/W 50 5 55 � � � 55
17 40 From: MP 1.43/1.60/0.00/0.00 To: MP 1.60/2.10l0.49/0.07 04 P 123 T
Grade, Drain, Surt.(HMA), C8�G, Railroad Xing & Signal; "12 CON 720 80 800 800
Channelization Street Li hts' Finished Width = 52 Ft TOTALS TIB 815 90 905 905
P_E. 36 4 40 i i � 40
R-NE RD. Phase 2 (Project nof funded) F2/W
07 4� Rd. No.: 95037 - 26.3 NE to 31 NE 03 P 4.74 P,T ! ; :
i i i
From: MP 6.20 To: MP 10.94 CON 900 100 1000 1000
Grade Drain Surface S� Finished Width = 28 Ft. TOTALS RAP 936 104 1040 1040
P.E. 36 4 40 40
R-NE RD. Phase 3 (Projectnotfunded) R/W � � `
i i i
07 42 Rd. No.: 95037 - 31 NE to 36 NE 03 P 5.11 P,T
From: MP 10.94 To: MP 16.05 CON 1062 118 1180 1980
Grade Drain Surface BST - Finished Width = 28 Ft. TOTALS RAP 1098 122 1220 1220
Report Date: July 25, 2006 Dist: 2 H8�LP; TIB; CRAB; RTPO; Planning; PUD; Irr. Dists; Tel. Cos. v. 5.6 - Supersedes prev. edition
Page 8 0411
Six Year Transportation Irnprovement Program
From 2009 to 2014
Agency. Grant County
co. tvo.: 13 Co. Name: G['at7t Cou11#y Hearing Date: July 22, 2008 Adoption Date:
City No. - - -
MPO/R7P0: QUadCO Amend Date: Resolution No.: 08- -CC
Project Costs in Thousands of Dollars Federally Funded
Project identifiqtion Expen�ture Schedule (Local pro}ects ONy
� � � Fund Source Information Agency)
A. Federal Aid No. B. Bridge No. u a, a �,
c � �, � `� � � o � Federal Fundin �
,� � o� C. Project Title o T � � v a
u� �o � i, Phase Federal Federal State Envir Rer�uired
LL � a` Z D. Street/Road Name of Number n.E— = 1st 2nd 3rd 4� �� Type Date
� � � o Start Fund Cost by Fund State Local Totai 6th tm�yy)
� E. Beginning MP or road - Ending MP or road a
I F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds
1 l 2 I 3 4 5 I 6� 7 8 9 10 11 12 13 14 15 96 17 18' 19 20 21
5 � 6 i i i 6
STP(R)-A130 P�E"
24-SW � ' � :
07 P 0.38 P,T CE tdo
07 43 Rd_ No._ 91050 - SR 243 to Mattawa Town Limits i i i
From: MP 0.00 To: MP 0.38
CON 130 2� 15� 150
Minor Widenin NMA Overta 4" - two liSts � Fin. Wfd = 34 Ft.
TOTALS STP R 135 21 156 156
P E 12 3 15 15
VANTAGE RD. SW [Safefy ProjectJ � � � '
09 `� Rd. No.: 30520 - Columbia River Gorge 12 P 3.75 P,T i
From: MP 0.10 To: MP 3.85
CON 240 60 300 300
TOTALS Si'P S 252 63 315 315
Guardrail Minor Widenin Draina e. Finished Width = 28 ft. ; ; ; $
P.E. 8 $ i i i
U-SE PEDIBIKE PATH [Pafhs & Trails FundJ �
p7 � Rd. No.: 92o35 - Cemetery to Warden City limits 01 P 1.26 P,T i i
CON PATHS & 90 90 90
From: MP 2.02 To: MP 3.28 98
Grade Drain Surtace HMA ' Finished Width = 10 Ft_ TOTALS TRAILS 98 98
P.E. 35 5 40 : : 40
STP(R)-E133 ; ; �
ADAMS RD. SW � � � �
07 P 628 P,T CE No
07 46 Rd. No._ 91017 - SR 26 to Frenchman Hill Rd. f 1100
From: MP 0.00 To: MP 6.28 CON 951 149 1100
TOTALS STP R 986 154 1140 1140
HMA Overla 2" � Finished Width = 34 Ft. ; ; i
P.E. 2 � 3 3
BROS-2013 Bridge No.: 08099100 ' � �
BRIDGE #126, O NE �
09 P 0.05 P,T � � : CE No
pg 47 Rd. No.: 54150 - 0.8 mi S of 47-NE � � �
CON 43 10 53 53
From: MP 4.20 To: MP 4.25 56
Brid e Re iacemenY Finished Width = 28 Ft. TOTALS BR 45 11 56
P.E. 6 6 6
5-NE RD Moses Pointe Plat � ' � '
pg 48 Rd. No.: 40880(NEV1n - Westshore Dr. to F-NE 01 P 0.30 P,T Developer
CON Miti ation 70 70 ��
From: MP'I.00 To: MP 1.30 ;
Grade Drain Surtace BST ' Finished Width = 26 Ft.
TOTALS Funds 76 76 ' 76
Report Date: July 25, 2006
Dist: 2 H&LP; TIB; CRAB; RTPO; Planning; PUD; Irr. Dists; Tel. Cos. v. 5.6 - Supersedes prev. edition
Page 9 of 11
Six Year Transpor�ation Imp�overne¢�t Prograrr�
Frorn 2009 to 2014
a9ency_ Grant County
Co. No.: 13 co. tvame: Grani Coun4y Hearing Dafe: July 22, 2008 Adoption Date:
City No. --- MPO/RTPO: QU1dC0 Amend Date: Resolution No.: 08- -CC
Project Costs in Thousands of Dollars Federally Funded
Project Identification F�cpenditure Schedule (Locai projects Onty
� � � � Fund Source lnfiormation Agency)
A Federal Aid No. B. Bridge No. a� a, -6 y
� �, „_�., � � � � � �j t Federal Fundin �
� � o� C. Project Title L T � � _ a
rn � = � Phase Federaf �edera{ State Envir Required
� � b Z D. Street/Road Name of Number a.r = � 1st 2nd 3rd 4th 6 h Type Date
� � � o Stact Fund Cost by Fund State Local Total (mm/yy}
E. Beginning MP or road - Ending MP or road a
F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds
� 2 3 I 4 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18' 19 20 21
Joirrt Proj. w/Dougias Co. P.E. 80 80 ; i � 80
24-NW RD (Three Devils) � i ! �
p7 49 Rd. No.: 33700 - End of BST to Douglas Couniy Line 03 P 3.99 P,T i i f
From: MP 4.30 To: MP 8.29
CON 92� 92Q 920
TOTALS 1000 1000 1000
Grade Drain Surface BST � Finished Width = 28 Ft. $
BROS-2013 Bridge No.: 08172800 P.E. 6 2 $
BRIDGE #313, E SE � � � �
09 P 0.21 P,T CE No
pg 50 Rd. No_: 20790 - 0.01 mi S of 14.8-SE 42
CON 34 $ �2
From: MP 1.15 To: MP 1.36 50 I
TOTALS BR 40 10 50 � � ;
Brid e Re lacemen � Finished Width = 2S Ft. ; ; :
P.E. 27 3 30 � i i 30
COCHRAN NE & OTTMAR DR. NE � ( ! ?
03 P 0.89 P,T
17 51 Rd. No.: 41550 - Airway to Valley Rd. 07 � � �
CON 468 52 520 520
From: MP 0.00 To: MP 0.89 550 12951
Grade Drain SurF. HMA C&G Finished Width = 52 Ft. TOTALS AIP 495 55 550
2g 4 33 � ; 33
STP(R)-E131 P.E. ; ;
DODSON RD. SW � � �
07 P 5_90 P,T �E No
07 52 Rd. No.: 91030 - SR 26 to Frenchman F{ilfs 1075
From: MP �.�0 To: MP 5.90 CON 930 145 1075
HMA Overla 2" ' Finished Width = 34 Ft. TOTALS STP(R) gsg 149 1108 � 1108
P.E. 13 13 i i i 13
F-NE RD Cost Share - Moses Pointe � ? � ;
09 53 Rd. No.: NEW - North Frontage to Mae Valley Rd. 01 P 0.95 P,T Developer ; ; i
COPf Miti ation 117 117 117
From: MP 0.00 To: MP 0.95 130
Grade Drain Surtace BS � F�nished Width = 26 Ft. TOTALS Funds 130 130
(Porffunds) P.E. 20 20 20
McConihe Rd NE (V1/est Access for Port of M.L.) � � � �
09 54 Rd. No.: NEW - SR 17 to Port of Moses Lake 01 P 0.85 P,T
From: MP 0.00 To: MP 0.85
CON Port of 160 160 160
Grade Drain Surtace BS � Finished Width = 28 Ft.
TOTALS Moses Lk 180 180 180
" s R_ Guoersedes orev. edition
Report Date: July 25, 2006 Dist: 2 H&LP; TIB; CR,4B; RTPO; Planning; ruu; irr. u�scs; � c�. ���.
Page 10 of 11
Six Year Transportation lmproverv�e�t Program
From 2009 to 2014
Agency: Gr"dilt COU11�!
Co. No.: 'L3 Co. Hame: Gu`lttt COUt��y Hearing Date: July 22, 2008 Adoption Date:
City No. - - -
MPO/RTPO: QU�dCO Amend Date: Resolution No.: 08- -CC
Project Costs in Thousands of Doliars Federally Funded
Project Identification Expenditure Schedule (Local p�ojects Only
� � � � Fund Source lnfiormation qgency)
A. Federal Aid No. B. Bridge No. a� � a, -a N
c y� N �� � u�i V � Federal Fundin �
,� �_o £ C_ Project Title T f
o Q �a � a
� �o = � Phase Federal Federal State Envir Require
� v a` Z D. StreeURoad Name of Number a�— = 1st 2nd 3rd 4th thr�u Type Date
LL � � � o Start Fund Cost by Fund State Local Total �m���
E. Beginning MP or road - Ending MP or road a
F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds
� I 2 g 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18. 19 20 21
� P E 90 10 100 i i � 100
9-NW RD. (Projectnotfunde� �
pg 5� Rd. No.: 30200/93020 - SR 281 to SR 283 03 P 9.85 P,T i i 1
From: MP 3.97i0.00 To: MP 7.98i5.84
CON 1980 220 2200 2200
Grade Drain SurFace BS � Finished Width = 34 Ft.
TOTALS RAP 2070 230 2300 2300
P E 40 40 40
22-NE RD � � � �
Og 56 Rd. No.: 52360 - SR 28 fo Marlin City Limits 03 P 4.22 P,T
From: MP 0.70 To: MP 4_92
CON 593 593 593
TOTALS 633 633 633
Grade Drain SurtaCe BST � Finished Width = 28 Ft. ; ; ;
P.E. 22 3 25 � i � 25
6-SE RD (Project not funded) �
08 57 Rd. No._ 25500 - U-SE to X-SE 03 P 3.02 P,T i i
From: MP 2.00 To: MP 5.02
CON 454 50 504 504
Grade Drain Surface BS � Finished Width = 34 Ft.
TOTALS RAP 476 53 529 529
P.E. 25 25 25
13-SW RD � � � �
pg 58 Rd. No.: 13100 - Dodson to Division S 03 P 3.02 P,T i
From: MP 3.24 To: MP 6.26
CON 428 428 428
TOTALS 453 453 453
Grade Drain Surface BS � Finished Width = 28 Ft : ; ;
P E 18 2 20 20
i i i
E-SW RD (Project not fundedJ �
pg 59 Rd. No.: 10100 - SR 26 to 12-SW 03 P 1.71 P,T i i i
From: MP 0.00 To: MP 1.71
CON 252 28 280 280
Grade Drain Surface SST � Finished Width = 34 Ft.
TOTALS R.4P 270 30 300 300
P.E. 12 2 14 14
S. FRONTAGE RD SW & U-SW F (Projectnotfunded) � ' ' `
03 P 0.71 P,T
07 60 Rd. No.: 15940/159 90 - 45d curve(at U�V1n to 5-SW OS
08 From: MP 4.45/0.00 To: MP 4.75/0.36
CO N 99 11 11 D 110
Grade Drain Surface BST � Finished Width = 34 Ft.
70TALS F2AP 111 13 124 124
" S F_ �„nPrsedPS orev. editior
Report Date: July 25, 2006
Dist: 2 H&LP; TIB; CRAB; RTPO; Nlannmg; ruu; irr. uis�s; � c�. w�.
Page '{ 1 of 11
Agency: GP117f COi0f11j/
co. tvo.: '!3 Co. Name: Gl'1IHt �mUtl�/
Six Year Transportation Irnproveme�t Program
Frorn 2009 #0 20'! 4
Hearing Date: July 22, 2008 Adoption Date:
City No. --- MPO/RTPO_ QU�dCO Amend Date: Resolution No.: 08- -CC
Project Identi�ication I Project Costs in Thousands of Dollars Federally Funded
� A. Federal Aid No. B. Bridge No. � � � �, Fund Source Information �Penditure Schedule (Local projects Only
a, � �, Agency)
-� � o� C. Project Title � Q � J v a Federal Fundin �
3 v a` Z D_ Street/Road Name of Number Q� m � = � Phase Federal Federal State Envir Required
LL � � � � 1st 2nd 3rd 4fh th�h Type Date
E. Beginning MP or road - Ending MP or road — o Start Fund Cost by Fund State Local Total
a (mm/yy)
F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds
1 I 2 3 4 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
P.E. 18 2 20 i � � 20
BAIRD SPRINGS RD NW (ProjectnotfundedJ R/W
OS 61 Rd. No.: 32300 - W-NW to SR 28 03 P 1.62 P,T � � '
i i i
From: MP 20.78 To: MP 22_40 CON 252 28 280 280
Grade Drain Surface BST Finished Width = 28 Ft. TOTALS R.4P 270 30 300 300
� denotes carryover for STIP
TOTALS 103.7
8672
16305 12579 37556 6406 5797 6345 19008
Report Date: July 25, 2006 Dist: 2 H&LP; TIB; CRAB; RTPO; Planning; PUD; Irr. Dists; TeL Cos. v. 5.6 - Supersedes prev. edition
Grant County Six Year TIP 2009-2014 Page 1 of 2
Revenue and Expenditure Analysis - County Road Fund 101
July 22, 2008
BARS # 2008 2009 2010 2011 2012-14
REVENUES:
111 10 Unreserved Balance 6,027,000 �1,399,400 2,782,000 2,686,400 5,869,500
111 13 Reserved Facilites Balance 3,000,000 0 0 0 0
111 15 Reserved Gravel to BST -2008 to 10 1,276,000 1,575,000 1,373,400 0 0
311 10 PropertyTax 6,400,000 6,528,000 6,658,600 6,791,800 20,375,400
12 Annex. Impact (Moses Lake) 6,000 6,000 6,000 0 0
30 Sale of Title Prop. 0 0 0 0 0
40 Sale of Royal City Shop [10 yr Contr] 6,357 6,357 6,357 6,357 19,071
317 20 Leasehold Tax 95,000 101,700 108,800 116,400 422,500
322 40 Street & Curb Permits 100 100 100 100 300
332 15 20 Taylor Grazing Act 2,000 2,000 2,000 2,000 6,000
15 60 Fish & Wildlife 0 0 0 0 0
81 00 Federal In-Lieu -Hanford Reserve 130,000 10,000 10,000 10,000 30,000
333 20 21 Fed. Aid - BR 1,401,000 480,000 0 0 85,000
20 22 Fed. Aid - STP (S) 0 0 0 0 252,000
20 23 Fed. Aid - STP (R), (U) 657,000 558,000 1,875,000 3,150,000 4,122,000
20 24 Fed. Aid - STP Rural Safety 0 0 0 0 0
20 26 Fed. Aid - STP (E) 0 192,000 0 0 0
334 03 61 WSDOT Planning - QUADCO 20,000 64,000 44,000 0 0
03 71 RAP 2,881,000 1,862,000 423,000 2,145,000 10,265,000
03 72 CAPP 1,103,000 1,114,030 1,125,170 1,136,422 4,409,359
03 81 TIB 65,000 0 0 0 1,310,000
336 00 89 Motor Vehicle Tax 6,250,000 6,312,500 6,375,625 6,439,381 19,511,325
337 07 In-Lieu Taxes 0 0 0 0 0
338 40 Intergovernmental Services 50,000 50,000 50,000 50,000 150,000
341 50 Map Sales 100 100 100 100 400
60 Printing/Duplicating 2,000 2,500 2,700 2,900 10,500
343 20 Engineering Services 0 0 0 0 0
345 80 Plat Checking Fees 3,500 3,500 3,700 4,000 14,500
349 90 Road Const./Eng. Services 0 0 0 0 0
363 10 Insurance & Recoveries 0 0 0 0 0
367 10 Contributions/CostShare/Dev. Mitig. 52,000 440,000 1,200,000 50,000 438,000
368 11 12.8 CRID 5,000 3,207 3,207 3,207 9,621
12 10 NW CRID 350 347 347 347 1,041
13 CRID Guarantee Fund 0 0 0 0 0
369 40 Other Judgements/Settlements 0 0 0 0 0
90 Misc. Revenue 5,000 15,000 15,000 15,000 45,000
397 10 Transfers-In (Paths and Trails) 0 30,000 0 0 98,000
20 Transfers-In (ER&R) 0 0 0 0 • 0
30 Transfers-In (S.W. w/Neva Lk Rd) 0 0 367,000 0 0
40 Transfers-In Si n Sho 0 0 0 0 0
Total Revenues: 29,437,407 $23,755 741 $22 432,106 $22 609,414 $67,444,517
Grant County Six Year TIP 2008-2013 Page 2 of 2
BARS # 2008 2009 2010 2011 2012-14
EXPENDITURES:
508 13 Ending Res. Gravel to BST -08 to 10 2,410,000 1,240,000 0 0 0
14 Ending Res, Facilites 0 0 0 0 0
519 70 Reimbursables 50,000 50,000 50,000 50,000 150,000
520 Traffic Policing 195,000 195,000 195,000 195,000 585,000
541 Road Preservation 3,250,000 3,412,500 3,583,100 3,762,300 12,189,900
542 Road Maintenance 6,345,000 6,662,300 6,995,400 7,345,200 23,798,400
543 10 Administration 300,000 315,000 330,800 347,300 1,125,300
30 General Services 315,000 330,800 347,300 364,700 1,181,600
50 Facilities 300,000 235,000 235,000 235,000 705,000
60 Training 165,000 173,300 182,000 191,100 619,200
70 Undist. Indirect Labor 85,000 89,300 93,800 98,500 319,100
90 Interfund Non-Operating Rentals 0 0 0 0 0
544 20 Undistributed Engineering 180,000 189,000 198,500 208,400 675,200
41 Plans and Permits 110,000 115,500 121,300 127,400 412,800
42 Plats 40,000 42,000 44,100 46,300 150,000
43 Right of Way 12,000 12,600 13,200 13,900 45,000
44 Traffic Planning 110,000 115,500 121,300 127,400 412,800
45 QUADCO 20,000 64,000 44,000 0 0
70 STP - Cities 458,000 458,000 458,000 458,000 1,374,000
545 Extraordinary 150,000 150,000 150,000 150,000 450,000
548 Supplies and Materials 0 0 0 0 0
591 Bond Redemption 2,000 1,900 1,710 1,500 4,000
594 30 Capital Outlay - Inventory 0 0 0 0 0
44 Moses Lake Shop Earthwork 0 0 0 0 0
48 Machinery/Equipment 55,000 0 0 0 0
--- Shop Construction - Warden 0 0 200,000 0 0
--- Shop Construction - Moses Lake 3,200,000 0 0 0 0
--- Accounting Software 100,000 50,000 50,000 50,000 150,000
597 10 Transfers-Out (Paths & Trails) 31,000 32,600 34,200 35,900 116,300
40 Transfers-Out (E.R. & R. Cap.) 548,000 500,000 500,000 500,000 1,500,000
60 Transfers-Out (Misc.) 0 0 0 0 0
80 Transfers-Out (Facilities Reserve) 0 0 0 0 0
90 Transfers-Out Pits/Quarries Land 0 0 0 0 0
Total Ex enditures: $16,021,000 $13,194,300 $13,948,710 $14,307,900 $45,963,600
Available Construction Dollars: $13,416,407 $10,561,441 $8,483,396 $8,301,514 $21,480,917
Six Year TIP Totals 7,442,000 $6 406,000 $5,797 000 $6,345,000 $19,008,000