IN THE MATTER OF AMENDING A
COMPI2EHENSIVE SIX YEAR RESOLUTION No. 15- Q�CC
TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE YEARS 2015-2020
WH�REAS, pursuant to the requirements of Section 6, Chapter 83, Laws of Extraordinary
Session of the State of Washington, Grant County did prepare a Comprehensive Transportation
Improvement Program for the ensuing six years; and
WHEREAS, priority array of projects prepared in accordance with County Road
Administration Board Standards of Good Practice (WAC 136-14) was made available and was consulted
by the Board during the preparation of the Six Year Program; and
WHCREAS, the �ngineer's report with respect to deficient bridges was available to the
Board during the preparation of the Six Year Program;and
WHEREAS, an environmental pre-assessment of the Six Year Program indicated that the
social, economic and aesthetic values would not be disturbed; and
WHEREAS, pursuant fiu-ther to said Law, the Board of County Commissioners, being the
legislative body of the County, did prepare, revise and extend said Six Year Program and did hold a public
hearing on said Comprehensive Plan at 2:00 p.m. at the Grant County Courthouse,Ephrata, Washington on
the 22"d day of July, 2014.
NOW, THEREFORE BE IT RESOLVED by the Board of County Commissioners of
Grant County, Washington, that the Comprehensive Six Year Road Program presented at the public
hearing be amended as shown.
EFFECTIVE DATE: -F� �� , 2015.
DATED this�day of "YYlc,ti�, 2015.
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY,WASHINGTON
Yea Nay Abstain
� ❑ ❑ �
' ard Stevens, hair I
� i
❑ ❑ Cindy Ca �,Vice Chair ;
❑ ❑ ❑ �JZ-c��� ��
Carolann Swartz,Member �
ATTEST• I
-m I
1
I
lerk of the oa �
�
�
i
Page 1 of 1 ,
�ix Year Transportation Improvement Program
From 2015 to 2020
Agency: Gr3nt County
co_No.: 13 Co.Name: Grent COUnty Hearing Date: duryz2,2o�a Adoption Dafe: duly2z.zoia
City No_ --- MPO/RTPO: QUdC�CO Amend Date: nnay 5,20�5 Resolution No.: 14 039-CC
'Project Identification � � Project Costs in Thousands of Dollars Federaily Funded
c L y 6cpenditure Schedule
� A Federal Aid No. B. Bridge No. � o, � R Fund Source Irifortnation Projects Only
c y a `m � v y c (Local Agency)
.° � o � , C. ProjectTitle � Q � � p a Federal Fundin State/ R(W
3 v�d Z D. Street/Road Name of Number n F � � 2� � Phase Federal Federal Other State/ � 4th thru Envir Required
� ' E Beginning MP or road-Ending MP or road � F � �o Start Fund Cost by Fund Other Local Total 1st 2nd 3rd 6th �ype Date
� F. Describe Work to be Done — a` mmldd/ Code Phase Source Funds Funds Funds mm!
1 2 3 4 5 6 � 7 8 9 10 '11 12 13 14 15 16 17 18 19 20 21
BROS 2013(078) Bndge No.:08753400 I PE 116 29 145 145 ; I
BRIDGE#399,W-NW i I RW ' y I i
09 Rd.No.: 32390-027 mi N of Baird Springs � � � i CN 710 75 145 930 930�
1 11 I S 021 P,T � � CE
From_ MP 0.97 To: MP 0_38 � I i j Mar-15
Bridge Replacement-60 If,approaches;Fin.Width 28 ft �
Total Project Cost $1,075,000 j I II OTALS BROS 826 BNSF 75 174 1075 1075;
DOT Fortn 140-049 Rev.9/95 DisVibution:2 TransAid;TIB;CR.46;RTPO;Planning;PUD;Irrigation Districts;Teiephone Compani